1 LUSI Coordination with LCLS
John Arthur LCLS LUSI within the LCLS Directorate at SLAC Interface between LUSI and LCLS Coordination tools Page

2 LCLS Directorate Structure
Accelerator Systems Div Experimental Facilities Div Business Div Engineering Physics Div Strategic Projects Div LCLS Construction LUSI

3 LUSI resources matrixed in
LCLS Director Instrument scientists Accelerator Systems Div Experimental Facilities Div Business Div Engineering Physics Div Strategic Projects Div LCLS Construction Engineers LUSI PMCS Controls

4 Resources move as instruments turn on
LCLS Director Instrument scientists Accelerator Systems Div Experimental Facilities Div Business Div Engineering Physics Div Strategic Projects Div LCLS Construction Engineers LUSI

5 The Interface between LUSI and LCLS
LCLS builds hutches and common infrastructure LUSI builds instruments in the hutches

6 LCLS is providing infrastructure for experiments
What LCLS will provide LCLS is constructing the Halls and Hutches in which LUSI instruments will live Includes lighting, HVAC, service electrical outlets Includes electrical, water, air interface points LCLS is providing infrastructure for experiments Includes network, timing, MPS, 120Hz data interfaces Includes PPS LCLS X-ray instrumentation will be available for use by experiments FEE attenuator, diagnostics available for user control LCLS prototype 2d detector available for experiments

7 Formalizing the interface
Details worked out through discussion LUSI-LCLS Integration Working Group LUSI-LCLS Project Coordination Details recorded in Interface Control Documents Define and describe interface points (flange, junction box) between LUSI and LCLS or other SLAC departments

8 Formal coordination methods
The LUSI-LCLS Integration Working Group Defines the interface between LCLS and LUSI Resolves issues overlapping this interface Formalized with Interface Control Documents Finds common solutions to common problems Experimental instrumentation, diagnostics Standardization where appropriate Members from LUSI and from LCLS Photon Systems

9 Integration Working Group issues
Experimental data flow and interface standards Formed LCLS/LUSI controls working group Defined expected data flow rates at LCLS Defined standard interface for detectors at LCLS Working to define standard specifications for data handling Far Experimental Hall optimization Defined locations of LUSI instruments Created specifications for FEH hutches Working with LCLS facilities to optimize FEH hutch design Standards for common systems Established an integrated vacuum controls system Established common understanding of survey practices and accuracy for installation

10 More formal coordination methods
LUSI-LCLS Project Coordination Meetings Coordinates use of LCLS Engineering resources Resolves administrative issues Members: T. Fornek, J. Arthur, J. Galayda

11 Interface Control Documents

12 Summary LUSI is nested into the LCLS Directorate at SLAC The interfaces are well-defined and documented Technical and management tools help define the interfaces and resolve common problems