EUROnu: Management Aspects
Structure IAP Internal and external collaboration Reporting Administration and finance Next steps Conclusions
2
Management Structure Structure from original proposal.
All exists and works as proposed, with small changes. Interaction with other projects via different routes At least 4 2
3
Management Structure Management Board Coordination Board Coordinator
Safety; SB Cost; BB Perform.; NF Edgecock STFC Dracos CNRS Efthymiopoulos CERN Long Imperial Coordination Board Work package Activity Coordinator Deputy WP1 Management, etc Edgecock (STFC) WP2 Superbeam Zito (CEA) Densham (STFC) WP3 Neutrino Factory Pozimski (IC) Martini (CERN) WP4 Beta beams Wildner (CERN) Hansen (CERN) WP5 Detectors Soler (Glasgow) Cervera (CSIC) WP6 Physics Hernandez (CSIC) Donini (CSIC)
4
International Advisory Panel (IAP)
Ewart Blackmore (TRIUMF, Canada) Swapan Chattopadhyay (CI, UK) Steve Holmes (FNAL, USA) Hitoshi Murayama (Tokyo, Japan) Mike Zisman (LBL, USA) – chair Have attended all three Annual Meetings: - verbal report to Governing Board - written report, to which we respond Very helpful to have external view on progress Helps to maintain contact with international activities
5
International Advisory Panel (IAP)
All three reports on EUROnu website Contain recommendations and comments No big problems identified No major changes of direction recommended Main recent concerns: target work in WP2 and WP baseline Beta Beam facility - resources for costing exercise
6
Internal Collaboration
Three annual meetings so far: March 2009 in CERN June 2010 in Strasbourg January 2011 in RAL Next meeting(s): May 2012 in Paris th meeting to finish off/plan next step?? Good attendance: e.g. 68 at RAL meeting Agendas and talks kept in CERN Indico GB and IAP meet during these
7
Internal Collaboration Examples of types of meeting
Internal meetings recorded on website WP meetings often take place in General meetings Work package Examples of types of meeting Number General Annual, meetings >2 WPs 14 WP1 CB, etc WP2 WP meeting WP3 9 WP4 WP5 3 WP6 8 Total 76
8
Internal Collaboration
Communication also by all usual methods Interaction particularly important between WP6 and others WP5 and others costing, safety and others
9
External Collaboration
Country Associate Canada TRIUMF France GANIL Germany Aachen GSI India INO Israel Weizmann Portugal Lisbon Russia IAP, Novgorad JINR, Dubna Switzerland Geneva UK Brunel USA Argonne Brookhaven FNAL Virginia Tech Muon Collaboration Mentioned many times already Very important for EUROnu! Happens via Associates (all WP)
10
External Collaboration
Country Associate Canada TRIUMF France GANIL Germany Aachen GSI India INO Israel Weizmann Portugal Lisbon Russia IAP, Novgorad JINR, Dubna Switzerland Geneva UK Brunel USA Argonne Brookhaven FNAL Virginia Tech Muon Collaboration Mentioned many times already Very important for EUROnu! Happens via Associates (all WP) IDS (WP3, 5, 6)
11
External Collaboration
Steering committee A.Blondel Geneva M.Zisman LBNL Y.Kuno Osaka K.Long (chair) Imperial Accelerator conveners S.Berg BNL J.Pozimski Y.Mori Kyoto C.Prior STFC Detector conveners A.Bross FNAL P.Soler Glasgow N.Mondal Mumbai A.Cervera Valencia Physics performance S.Choubey Harish A.Gouvea Northwestern A.Donini Madrid P.Huber (chair) Virginia Tech J.Kopp MPI S.Parke FNAL S.Pascoli Durham W.Winter (co-chair) Wuerzburg O.Yasuda Tokyo
12
External Collaboration
Steering committee A.Blondel Geneva M.Zisman LBNL Y.Kuno Osaka K.Long (chair) Imperial Accelerator conveners S.Berg BNL J.Pozimski Y.Mori Kyoto C.Prior STFC Detector conveners A.Bross FNAL P.Soler Glasgow N.Mondal Mumbai A.Cervera Valencia Physics performance S.Choubey Harish A.Gouvea Northwestern A.Donini Madrid P.Huber (chair) Virginia Tech J.Kopp MPI S.Parke FNAL S.Pascoli Durham W.Winter (co-chair) Wuerzburg O.Yasuda Tokyo
13
External Collaboration
Mentioned many times already Very important for EUROnu! Happens via Associates (all WP) IDS (WP3, 5, 6) Contact with other FP7 neutrino projects NEU2012 (in EuCARD) LAGUNA-LBNO Collaboration of EUROnu members with projects - Collaboration on related accelerator projects Plus dissemination activities described by Christian In particular, reporting to CERN Council via Strategy Group, SPC, etc - ECFA via ECFA panel
14
Administration Annual reports: st was somewhat delayed as new experience - 2nd was much better (SESAM is awful!) Payment of EC contribution: prepayment was distributed promptly st annual was delayed, because of late report and a new STFC financial system nd annual payment is almost ready and will be distributed promptly Changes to the Consortium: CSIC 3rd party (UAM) has never taken part in EUROnu it could be removed from GA (if required)
15
Total staff months from GA
Financial Report Total staff months from GA Workpackage WP1 WP2 WP3 WP4 WP5 WP6 TOTAL per Beneficiary STFC 13/68 74/137 94/78 181/283 CEA 28/46 3/34 31/80 CERN 4/12 25/74 55/80 0/1 84/167 Glasgow 6/57 Imperial 46/84 CSIC 10/47 11/60 21/107 CNRS 38/102 0/12 49/78 16/44 107/248 CUT 8/48 UDUR 13/32 INFN 10/18 28/56 38/74 MPG 4/57 UOXF.DL 0/6 UniSofia 48/51 Warwick 26/28 UCL 22/85 TOTAL 21/92 148/333 191/282 139/295 80/199 56/206 635/1407
16
Financial Report Staff months SM so far/ SM total Partner Total
17
Financial Report Staff months SM so far/ SM total Work Package Total
18
Financial Report Total Costs (€) Partner Year 1 Year 2 Total to date
Total GA Ratio STFC 0.480 CEA 0.313 CERN 0.644 Glasgow 0.184 Imperial 0.354 CSIC 0.279 CNRS 0.469 CUT 0.167 UDUR 0.240 INFN 0.752 MPG 0.139 UOXF.DL 765.66 0.00 0.098 UniSofia 0.491 Warwick 0.583 UCL 0.186 TOTAL 0.438
19
Total so far/ Total for EUROnu
Financial Report Total Costs (€) Total so far/ Total for EUROnu Partner
20
Financial Report EC Contribution (€) Partner Pre-finance Year 1
Year 2 Request Total GA Left STFC CEA CERN Glasgow Imperial CSIC CNRS CUT UDUR INFN MPG UOXF.DL 574.25 0.00 UniSofia Warwick UCL TOTAL
21
Fraction of EC contribution left
Financial Report EC Contribution (€) Fraction of EC contribution left Partner Total
22
Conclusions EUROnu is progressing well! No major delays
All objectives, milestones and deliverables will be met All partners will meet their obligations As always, some difficulties to be dealt with: - resources for costing We have all learnt a lot since the start of EUROnu Remainder will run even more smoothly