1
ANTARES
2
ANTARES Detector&Physics Status of construction Detector performance
Preliminary results Budget situation
3
ANTARES detector 12 strings, 900 PMTs float ~60 m ~350 m
Acoustic beacon time calibration LED beacon electronic container Optical modules hydrophone ~100 m shore station electro-optic submarine cable ~ 40 Km 2400 m Junction box anchor 12 strings, 900 PMTs An 13th string dedicated to environmental properties measurements completes the detector
4
ANTARES – Junction Box connections
LINE 5 LINE 3 LINE 4 LINE 1 MILOM LINE 2 Line 6 deployed March 16,2007 Line 7 deployed April 6, 2007 Lines 8, 9 deployed July, 2007 MILOM recovered in April New IL deployed July, 2007 Interlink cables Situation in April 2007
5
Situation in April 2007 375 PMTs now in the DAQ stream IL07
6
Line assembly Modules for line 11 completed September 07
Modules for line 12 completed January 08 (Line 12 has one acoustic sector – top one) Problems with some JB connectors solved (Y cables solution).
7
ANTARES Last connections
Previous plan: Connection lines 6-10 & IL December 07 Connection lines & repair line 4 May 08
8
ANTARES now an operational Neutrino Telescope
Mediterranean Sea, 43° N South pole <25% exposure not visible Less background light Better angular resolution ANTARES now biggest NT in Northern Hemisphere (Effective area very similar to AMANDA) Chance of major original discoveries
9
Autonomous Transponder
Measurement of PMT positions acoustic measurements + use of compasses&tiltmeters Line 1 hydro phones Autonomous Transponder
10
Line Alignment using tiltmeters-compasses + hydrophones
5 position sampling points 25 gradients (tiltmetre data from each storey) can reconstruct line shape
11
Acoustic positioning in Antares
Test results of the 3 recently (re)connected lines : - L4 works nominally (5 Rx + 1 RxTx) - L11 works nominally (5 Rx + 1 RxTx) - L12 works nominally (5 Rx + 1 RxTx) To resume, the status of the AP system on the full Antares Detector : RxTx emitters fully functionnal on BSS - all Rx receivers fully functional located along the lines (almost 60 if concerned LCM are alive) ==> the acoustic positioning is ready to provide data to perform precise alignments. Already available for lines 1-5 for data collected up to December 2007
12
Latest sea operation Wednesday May 28, 2:51 pm
13
Latest sea operation
14
Latest sea operation
15
Friday May 30, 7:10 pm
16
ANTARES online event display
t [ns]
17
ANTARES event reconstruction
t [ns]
18
___ MC ___ Data Atmospheric m reconstruction using alignements
Very preliminary ___ MC ___ Data Data MC*0.61 Rate (Hz) Atmospheric ms Nadir (degrees) Agreement in shape Agreement in rate to within ~10% Integral of data: 0.71 Integral of MC : 0.79
19
m zenith angle distribution after cut
No alignements used !! applied the standard cut: L > -5.3 Very preliminary number of events Neutrino candidates cos q
20
Coincidence rates between adjacent PMTs Main contribution: 40K decays
Time difference (ns)
21
Coincidence rates in the lines
Main contribution: 40K decays But also atm. Muons !!! Coincidence rates in the lines Analysis by D. Zaborov (ITEP) Time difference (ns)
22
Extracting muon rate Main contribution: 40K decays
But also atm. Muons !!! Extracting muon rate Analysis by D. Zaborov Very preliminary ~ 3400 m ~ 3050 m
23
ANTARES Bioluminescence&Efficiency
High bioluminescence rate in March-May 2006 Big improvement starting from June Bioluminescence much lower in 2007 than in 2006 March-May 2007 best ever period for ANTARES
24
ANTARES Budget&MoU New MoU ready since November 2006 (waiting for signatures) Already signed by CNRS, Saclay, Strasbourg, INFN, Nikhef, Bucharest Valencia
25
ANTARES Common Fund Common Fund Budget:
2007 705 kEuro (INFN: 135 kEuro) 2008 450 kEuro (sharing proportional to # of “authors”) (INFN contribution 118 kEuro) “The CF for the years will be agreed upon by the FRB” INFN has fully satisfied its financial commitments for both Construction and CF !!
26
ANTARES Common Fund Common Fund Budget:
2008 450 kEuro (sharing proportional to # of “authors”)
27
Richieste 2008
28
Proposte referee 2008 BARI BOLOGNA CATANIA
29
Proposte referee 2008 GENOVA LNS PISA ROMA
30
proposte dei referee LAB. Rich. Prop. Taglio% Taglio corr. Ass.2007 BA
75.5 51 32% 53 BO 95.8 66 31% 44 CT 65.36 45 43.5 GE 31.6 23 27% LNS 26.7 19 29% PI 215.78 188 12.8% 28% 176 RM 42 31 26% 38 Totale 552.74 423 23.4% 29% 509+50
31
Taglio su miss. Est. LAB. Rich. Prop. Taglio% BA 45.5 27 40% BO 66 44
33% CT 21.6 14 35% GE 24.6 17 31% LNS 21.0 PI 55.4 37 RM 30 21 30% Totale 264 174 34% - Il drastico taglio su ME nel 2007 ha creato non pochi problemi - Il 2008 sara’ un anno in cui la presa dati sara’ piu’ intensa
32
The End
33
Diambrini at LOMONOSOV
34
Taglio su miss. Est. LAB. Rich. Prop. Ass.2007 Taglio% BA 45.5 27 40%
27.5 BO 66 44 33% 33.5 CT 21.6 14 35% 17.5 GE 24.6 17 31% 23 LNS 21.0 13.5 PI 55.4 37 29.5 RM 30 21 30% 22 Totale 264 174 34% 166.5 - Il drastico taglio su ME nel 2007 ha creato non pochi problemi - Il 2008 sara’ un anno in cui la presa dati sara’ piu’ intensa