Presentation is loading. Please wait.

Presentation is loading. Please wait.

LSST Quality Assurance Mario Juric, University of Washington LSST Data Management Subsystem Scientist Joint Technical Meeting 2017 March 6-8th, 2017.

Similar presentations


Presentation on theme: "LSST Quality Assurance Mario Juric, University of Washington LSST Data Management Subsystem Scientist Joint Technical Meeting 2017 March 6-8th, 2017."— Presentation transcript:

1 LSST Quality Assurance Mario Juric, University of Washington LSST Data Management Subsystem Scientist Joint Technical Meeting 2017 March 6-8th, 2017

2 CAVEAT: !!! Work in Progress !!! Current Drafts
Skeleton of the “Data Management Test Plan” (LDM-503; Draft of the “DM Science Verification” document ( CAVEAT: !!! Work in Progress !!!

3 How we build, and how we know we did it right?
Project Management Project Science Verification Results DM System Construction System components Science Verification Integrated (sub)system(s) System Integration and Test

4 DM “Science Verification”
DM Science Verification Document:

5 First meeting tomorrow!
LSST Project Scientist DM System Science Team DM Project Manager DM Subsystem Scientist (Mario Juric) DM Science Pipelines Scientist (Robert Lupton) DM Science Verification Scientist (Position Open) Team Scientists System Science Team Staff DM SST Analyst (Melissa Graham) Alert Production Scientist (Eric Bellm) Data Release Production Scientist (Jim Bosch) DM SST Analyst (Colin Slater) SQuaRE Scientist (Michael Wood-Vasey; interim) First meeting tomorrow! (Glendale 3, 9am) SUIT Scientist (David Ciardi) Data Processing Scientist (To Be Defined, NCSA)

6 Science Verification Team
DM Science Verification Team DM Science Verification Scientist DM Science Pipelines Scientist (Robert Lupton) Team Scientists DM SST Staff (variable) DM Staff (detailed) External Scientists (variable)

7 TODO This is all work in progress !!! Much remains to be done
Iterate to a workable model... Converge on the test plan... Get our terminology straight (verification/validation, quality assurance/control/management) Define the I&T processes (!) Define SV exercises consistent with the construction plan Understand how much work there is to be done, make everything is reflected in DM plan and milestones Establish the System Science Team (SST) Hire and/or appoint the SV Scientist We’ll be working (hard) over the next few weeks to get this finalized.


Download ppt "LSST Quality Assurance Mario Juric, University of Washington LSST Data Management Subsystem Scientist Joint Technical Meeting 2017 March 6-8th, 2017."

Similar presentations


Ads by Google