Download presentation
Presentation is loading. Please wait.
1
CAL DQM Report June 2nd – June 9th
2
June 2nd Upadate B.C’s Checkout Runs: QINJ 17966 0(0) 12(1) 1(0)
UNO (0) 1(0) 0(0) PED (0) 0(0) 0(0) Version b.c.’s 2 holes (B2,B22) Updated UNO scale factors
3
Version 3587 Total number of CAL bad channels for version 3587 is 311
They break down as follows: FCAL BCAL RCAL Total FEC UNO Qinj PED Total The total number of holes in the CAL are: Ca Crt Crd Chn Poser Mod Tow Typ Sid Code Message b DSP Qinj mean too low b UNO mean is high b A UNO RMS is too big b A UNO mean is too low 2 holes Total number of SRTD bad channels for version 3587 is 5 Ca Crt Crd Chn PMT Code Message r Pipeline pedestal spread r Nonlinearity r C Pipeline pedestal spread r Nonlinearity r EA Nonlinearity Total number of FNC bad channels for version 3587 is 0 Total number of PRES bad channels for version 3587 is 1 r E Nonlinearity Total number of PRT bad channels for version 3587 is 0 Total number of LED bad channels for version 3587 is 0 Total number of BPRE bad channels for version 3587 is 0 Total number of TDI bad channels for version 3587 is 0
4
Hole in B2
5
Hole in B22
6
June 3rd Access day FEC EC-1 EC-5 17999-18004
FEC v b.c.’s 0 holes Update time offsets v. 208 UNO (0) 273(81) 31(0) B26 off! calhvon UNO (0) 119(0) 30(0) B26 on!
7
B26 hv off!
8
B26 hv on
9
June 3rd continued Trimming QINJ 18015 7(0) 3(0) 2(0)
UNO (0) 118(1) 30(0) UNO (0) 117(0) 25(0) UNO (0) 113(0) 25(0) UNO (0) 113(0) 24(0) QINJ (0) 3(0) 2(0) PED (0) 8(0) 1(0) Version b.c.’s 0 holes Update UNO scale factors
10
June 4-8th Isabell used CAL quick calibs to update b.c’s
Isabell did Auto ADC to volt on Monday.
11
June 9th Update b.c’s with CAL quick calib 50218 QINJ 0(0) 0(0) 0(0)
UNO 0(0) 4(0) 2(0) PED 1(0) 0(0) 0(0) Version b.c.’s 0 holes Tried to change version, got errors: ccv: could not get lock: file /var/tmp/locks/ccv.lock already exists Didn’t change version, didn’t main
12
Version 3598 Total number of SRTD bad channels for version 3598 is 1
Ca Crt Crd Chn PMT Code Message r EA Pipeline gain spread Total number of FNC bad channels for version 3598 is 0 Total number of PRES bad channels for version 3598 is 1 r E Nonlinearity Total number of PRT bad channels for version 3598 is 0 Total number of LED bad channels for version 3598 is 0 Total number of BPRE bad channels for version 3598 is 0 Total number of TDI bad channels for version 3598 is 0 Total number of CAL bad channels for version 3598 is 307 They break down as follows: FCAL BCAL RCAL Total FEC UNO Qinj PED Total The total number of holes in the CAL are: Ca Crt Crd Chn Poser Mod Tow Typ Sid Code Message 0 holes
13
UNO B5
14
QINJ B5
15
Problems/Calls from ZCR
June 3rd 11:30 pm Slow control warnings SRTD-FLTvolt south channel 4 Fixed by logging into teucer and using command: srtdfltlv on/ srtdfltlv off until all the voltages looked normal Pow_CAL in RCAL, BCAL etc. Ping monitor shows hc3control is unreachable Go to 6th floor and reset computer June 6th 8:30 pm Slow control problem with PRES-deputy missed instructions to Isabell
16
Problems/calls continued
June 7th GFLT histos show CAL pipeline jump Called Allesandro, called John L. (this is a CFLTP prob.) June 9th Cal in undefined offline state, can’t include CAL in runs. Called Allesandro
17
DQMCOC Trouble getting plots off caldaq…
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.