1 River place improvement committee
Report to the owners association board January 2013

2 Project scope Increase EC usability and appeal
Determine what improvements to the EC are important to residents Update: Floor coverings Paint Equipment Layout Furniture Implement maintenance plan Improve communication / signage

3 Original Design Envisioned:
Less equipment More expensive machines and minimal inexpensive free weights Open plan – no built in benches or shelves __________________________ With minimal updates, the EC layout supports: Duplication of the most popular equipment Additional equipment that residents have requested

4 Ec potential

5 Data collection Staff recorded usage in various areas for 30 days
Staff provided multi-purpose room rental history for several months Suggestions solicited in writing at the EC water cooler for several months Online survey conducted among North building residents and owners

6 MULTI-PURPOSE ROOM USAGE by reservation
Reservations by Time of Day 16 reservations over 10 months Reservations increased after price was decreased Averaging 2 reservations per month

7 Overall EC usage on a Friday when the multi-purpose room (Movie Theater) was reserved

8 EC usage – multipurpose room reserved
Overall EC usage on a Monday when the multi-purpose room (Movie Theater) was not reserved

9 Survey results 1. How often do you use the River Place Entertainment Center (gym, billiards, ping pong, foosball, steam room, sauna, locker rooms, and the multi-purpose room)? 52% Regular users 30% Casual users 18% Non-users

10 Survey results 2. Overall, are you satisfied with your experience using the Entertainment Center, neither satisfied or dissatisfied with it, or dissatisfied with it? 59% Satisfied 32% Neutral 9% Dissatisfied

11 Survey results 3. Please tell us about your experience with wait times at the Entertainment Center. More wait times reported than anticipated

12 Survey results 4. What features of the Entertainment Center are important to you? Everything is important Highest importance correlates with highest wait times reported

13 THE SOLUTION

14 Floors and walls Update floor coverings Use gym floor on lower level
Replace carpet on upper level Patch and paint Add mirrors along entire free weight area

15 Update layout and equipment
Move ping pong and foosball to multi-purpose room Remove: Bookcase Built-in benches Wall between men’s locker room and sauna Add: Elliptical machines, bikes, and rowing machine Updated/additional resistance machines Additional free weights Mats, medicine balls, pull-up bar Furniture in multi-purpose room and foyer

16 Equipment list 2 new cross-trainers, iPod compatible
Cable cross-over station Power cage Kettlebell set Medicine balls Wireless FM transmitters and receivers Chin-up and dip bars Mats for stretching More

17 PROJECT SCHEDULE HIGHLIGHTS
Data Collection January Design February 2013 Quotes March 2013 Construction April Develop Maintenance Plan and make post-implementation adjustments May Project complete

18 Maintenance plan Equipment numbered and labeled
User feedback mechanism with accountability Usage monitoring (machines do this automatically) Machine rotations Regular maintenance

19 Potential future improvements
New programming in multi-purpose room: Classes Redskins games Partition multi-purpose room Re-design foyer to enable social usage Swimming pool updates in resort spa style Improve website so content does not become stale Make pedestrian area in center of property into Main Street River Place with streetscape improvements: planters, lighting, seating…