Download presentation
Presentation is loading. Please wait.
Published byMarjory Rose Modified over 6 years ago
1
Wednesday 9/20 Syllabus Info Session Ansys Training
Simulation vs Engineering Project Statement Moonshine Event
2
https://goo.gl/forms/nyfI0xMm7kpmOMTJ2
3
Syllabus 4 M9/18 W 9/20 F 9/22 Resumes, Communication and Listening (BW) Oral Presentations, Design Reviews (BW/VM) Ansys Training 5 M 9/25 W 9/27 Moonshine Reading People, Personality Types, Jackie Gallo No class meeting, Whitcraft Moonshine event prework 6 M 10/2 W 10/4 F 10/6 Prj Schedule Proj St’ment Hardware Ordering, Pugh Charts, Unit Problems Oral Presentations 1 Problem, Design Review Optional Closeout event at Whitcraft 7 M 10/9 W 10/11 Unit Prob Oral Presentations 1 Problem, Design Review Oral Presentations 1 Problem, Design Review 8 M 10/16 W 10/18 Theory Unit Prob. Oral 1 Feedback/References, Theory (BW/VM?) Marketing Dr. Mary Caravella
4
A World Leader in the Design, Manufacture,
and Service of Aircraft Engines Wednesday, September 20, 2017 6:00 – 9:00 PM Next Generation Hall University of Connecticut Represented Groups: Hot Section, Materials & Processes Engineering, Mechanical Systems, Externals, Fan, and Compression Systems, Controls Diagnostic Systems, Quality and Process Engineering Please join us for pizza and learn about exciting jobs and internship opportunities at Pratt & Whitney! This page contains no technical data subject to the EAR or the ITAR
5
Ansys Training Friday September 22 Thermo /Fluids
12:00 to 5:00 EII Rm 202 Dr. Kringan Saha, Sr. Application Engineer All teams should be there for start Structures/Mechanics –TBD Work around your class schedule
6
Objectives Overview of Ansys and Ansys Fluent
Simulation setup and meshing Simple problems Available training and other resources for students Contact Name(s)
7
Expected to Attend
8
Moonshine Event Whitcraft ,LLC World Class Lean Manufacturing
76 County Rd Eastford CT 14 mi from campus
9
Why are We Doing This? Most difficult part for a team is to “get something done” – learning Teaming Event Applies to all teams (including Acc Masters) Non US Citizens can participate Team Competition – fun Google form NLT Friday (this week)
10
Presentation Topics basics of kaizen (“continual improvement”)
moonshine examples -moonshine war project criteria for the teams
11
Expected to Participate
12
Project Statement .
13
What is a Project Statement?
A project usually begins with a vague need expressed by a sponsor (internal or external). The purpose of a project statement is to define the problem to be solved so that work can begin on the project. Once the project is completed, the sponsor will be satisfied with the result. Beginning of your Interim (final) report
14
Stages of Building a Project Statement
Contact key individuals in the sponsoring organization (or the internal division). Arrange to meet with sponsor Background research – before visit Ask questions Listen Take good notes in your design notebook – write stuff down!! At conclusion of meeting, summarize and restate what you heard
15
Format for the Project Statement
Cover Page Body: Project Statement with all the necessary elements (as described before) clearly labeled. Additional Information: Identify key technical areas/skills used in the project.
17
Body of Statement Statement of Need Requirements Basic Limitations
-Introduction/Background Requirements -What is the project goal(s)? Basic Limitations -Metrics/Specifications/other data Verification Approach -What are you going to do? Schedule
18
Elements of a Project Statement
Statement of Need Preliminary Requirements Basic Limitations Other Data Verification Approach Schedule
19
Statement of Need A couple of paragraphs
Include brief overview of sponsor Discusses the problem/need Concise – but detailed enough so you can talk to it Does NOT include a solution
20
Preliminary Requirements
Describes the requirements broadly Level of detail for initial sponsor meeting Does not require a detailed spec list
21
Basic Limitations Describes known constraints
Notes applicable codes/restrictions Discusses undesirable features May include simple sketches
22
Other Data Includes relevant information that does not fit in other sections such as that about: equipment, facilities and/or policies of sponsoring organization software*****
23
Specifications (defined)
List the requirements that project must meet. There are different types of specifications, including those for hardware and software.
24
Specifications (warnings)
In general, you should NOT specify any components. However, if modifying an existing device [hardware or software], describe the current device in as much detail as possible.
25
Technical Specifications
Contains in a tabular form all of the facts & figures needed to undertake the design project.
26
Specifications Format (example)
Mechanical Parameters (sample) Button: Size 5” x 5’’ (min.) Actuation Force N (max.) Weight: 5000 lbs. (max.) Durability: Should survive 10-ft. drops. Electrical Parameters Battery Life 6 months (continuous use) Display: Number of Characters 30 (minimum) Size 2’ min. height x 1.75’ min. width Illumination Visible in strong sunlight
27
Specifications Format (cont.)
Environmental Location Basement (6’ underground) Temp. Range -40 to +700 F Storage temp to 1000 F Moisture?, Corrosive liquids?, Vibrations? Software Execution time seconds (max.) Termination/Reset 1 button Interrupts Standard ^C Memory MB Platform Windows PC
28
Activity Follow the instructions as given by Prof. Weber
29
A Final warning: Be Specific!