Download presentation
Presentation is loading. Please wait.
1
INTRODUCTION TO CAPSTONE PROJECT
FACULTY OF ENGINEERING CIVIL ENGINERING DEPARTMENT SPRING SEMESTER CIVL 401 INTRODUCTION TO CAPSTONE PROJECT ASSOC.PROF.DR. İBRAHİM YİTMEN
2
PRESENTATION OUTLINE BIM INTEGRATED PROJECT AND CONSTRUCTION MANAGEMENT Project Life Cycle Stages Shifting Project Workflows BIM Workflows from 2D to 5D LIFE CYCLE COST ANALYSIS Scope of costs, cost breakdown structure LCCA Process Typical Life Expentancy of Building Elements Calculation of Life Cycle Costs Payback calculation Sample payback analysis Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
3
PROJECT AND CONSTRUCTION MANAGEMENT
BIM INTEGRATED PROJECT AND CONSTRUCTION MANAGEMENT Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
4
Project Life Cycle Stages
Figure 1: Shifting project workflows Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
5
Project Life Cycle Stages
Figure 2: Shifting project workflows Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
6
Project Life Cycle Stages
Figure 3: Shifting project workflows Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
7
Project Life Cycle Stages
Figure 4: Shifting project workflows Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
8
Figure 5: From 2D to 5D (BIM / VDC)
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
9
Figure 6: BIM tools for Virtual Construction (VC)
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
10
Figure 7: Information presented in a BIM based on a Lifecycle View
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
11
Table 15: BIM Integrated construction lifecycle Process Framework
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
12
Figure 8. BIM-based project planning and management process
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
13
Figure 9: 4D BIM Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
14
Figure 10: 4D Simulation vs. 4D Scheduling vs. 4D Visualization
Project & Construction Management - Integrated 4D, 5D BIM Solutions
15
Figure 11: 4D BIM Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
16
Figure 12: 4D BIM work flows
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
17
Figure 13: Navisworks Timeliner simulator showing an intermadiate stage of constructon sequence
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
18
Figure 14: Comparison between «as-planned» and «actuals» date
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
19
Figure 16: Evolution of estimating in construction
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
20
v Figure 17: General 5D BIM work flows
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
21
v Figure 18: 5D BIM Quantity Take-off
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
22
v Figure 19: 5D BIM Quantity Take-off
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
23
v Figure 20: 5D BIM Calculation of duration and cost of tasks
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
24
v Figure 21: Costing workflow
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
25
LCCA COMPUTATIONS Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
26
LIFE CYCLE COST ANALYSIS
Figure 1 Typical scope of costs for WLC and LCC (extracted from ISO ) Project & Construction Management - Integrated 4D, 5D BIM Solutions
27
LIFE CYCLE COST ANALYSIS
Figure 1 Typical scope of costs for WLC and LCC (extracted from ISO ) Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
28
LIFE CYCLE COST ANALYSIS
Figure 1 Typical scope of costs for WLC and LCC (extracted from ISO ) Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
29
LIFE CYCLE COST ANALYSIS
Figure 2 Methods of economic evaluation Project & Construction Management - Integrated 4D, 5D BIM Solutions
30
Figure 3 Cost Breakdown Structure
LIFE CYCLE COST ANALYSIS Figure 3 Cost Breakdown Structure Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
31
Figure 4 Preventive maintenance plans
LIFE CYCLE COST ANALYSIS Figure 4 Preventive maintenance plans Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
32
LIFE CYCLE COST ANALYSIS
Figure 5 LCC implementation – deterministic method with iterations Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
33
LIFE CYCLE COST ANALYSIS
Figure 6 LCCA process for a bridge
34
LIFE CYCLE COST ANALYSIS
LCCA process for a bridge
35
LIFE CYCLE COST ANALYSIS
36
LIFE CYCLE COST ANALYSIS
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
37
LIFE CYCLE COST ANALYSIS
Project & Construction Management - Integrated 4D, 5D BIM Solutions
38
LIFE CYCLE COST ANALYSIS
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
39
LIFE CYCLE COST ANALYSIS
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
40
LIFE CYCLE COST ANALYSIS
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
41
LIFE CYCLE COST ANALYSIS
Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
42
LIFE CYCLE COST ANALYSIS
LCCA process for a bridge Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
43
THANK YOU. Q & A? Project & Construction Management - Integrated 4D, 5D BIM Solutions, LCCA Procedure
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.