1 Long Range Facilities Task Force
Meeting #3 Bethel School District May 18, 2017

2 Meeting objectives Learn about strategies to address lack of classroom capacity and aging facilities. Develop preliminary thinking on strategies to address needs.

3 Draft meeting ground rules
Start and end on time. Silence electronics. Ask questions of each other to gain clarity and understanding. Express yourself in terms of your personal preferences, interests and outcomes you wish to achieve. Listen respectfully, and try sincerely to understand the needs and interests of others. Come with curiosity and willingness to learn.

4 Meeting 2 information requests
School conditions table Update of state match eligibility Maintenance Dept. assets management program Revised capacity needs bar graph Seismic Study Report Percentage of SPED program use of building capacity Percentage of portable classrooms vs building classrooms

5 School condition table
Review data. Ask about recommendations for conditions methodology. Is there a demonstrated need? Is the need urgent?

6 Maintenance Dept. assets management program
Building 2016 Score 2017 Score Clover Creek 99.67% Good 99.95% Good Fire Sprinkler Corrected Frederickson 89.10% Good Monitoring Kapowsin 89.14% Good Paint exterior this year Nelson 95.08% Good Paint & Windows Budgeted for next year North Star 90.01% Good Spanaway 97.91% Good 98.19% Good Corrected fire sprinkler Thompson 96.19% Good Minor Plumbing issues

7 Maintenance Dept. assets management program
Building 2016 Score 2017 Score Middle Schools Cougar Mountain 92.56% Good Paint exterior this year Liberty 95.17% Good Interior Painting Issues Spanaway 93.51% Good Floor Issues High Schools Graham Kapowsin 93.19% Good 93.41% Good Interior finishes improved, Fire Sprinkler corrected Skill Center Monitoring Pierce County Phase 1 99.72% Good

8 Revised capacity needs bar graph
1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 Elementary Schools Middle Schools High Schools Net Building Capacity Students in Portables 2021 Enrollment 2026 Enrollment

9 Building capacity percentages
Elementary Schools 25% of classrooms are in portables 7% of classrooms (building and portables) are SPED programs Building Classrooms – 382 Portable Classrooms – 131 SPED Classrooms - 38

10 Building capacity percentages
Middle Schools 7% of classrooms are in portables 12% of classrooms (building and portables) are SPED programs Building Classrooms – 225 Portable Classrooms – 16 SPED Classrooms - 28

11 Building capacity percentages
High Schools 21% of classrooms are in portables 16% of classrooms (building and portables) are SPED programs Building Classrooms – 170 Portable Classrooms – 46 SPED Classrooms - 35

12 Long range facilities planning strategies
Throughout this section, mention which strategies district has tried/considered. Adding capacity and updating aging facilities

13 Capital investment strategies
The following strategies require capital investment (building or renovation). Build a new (additional) school Build additional classrooms Remodel an existing school Add capacity and/or update building systems Replace an existing school (new-in- lieu of modernization) Add portable classrooms Add teacher planning rooms

14 Build a new (additional) school
A school building is constructed to address lack of classroom capacity. Benefits Designed to meet latest facility standards Increased building lifespan Core facilities designed for increased capacity Reduced overcrowding in other schools Challenges Lead time (2-6 years) to complete Requires vacant land Significant capital funding

15 Build additional classrooms
Build additional classrooms at existing schools. Benefits Adds classroom space Faster than new or remodeled building Lower cost per classroom than new school Challenges Increased population may stress core facilities (e.g., gym, cafeteria) if not also expanded May require updates to building systems to comply with current codes Limited expansion opportunities due to space or permitting

16 Remodel an existing school
A school is renovated to add capacity and/or update building systems. Benefits Addresses lack of capacity and/or aging facilities Can meet current building standards and codes Increases facility lifespan Challenges Working within an existing facility may be limiting or expensive Requires significant cost to house students elsewhere during construction May take equal or more time than new construction Significant capital funding

17 Replace an existing school
In lieu of renovation, a new school is constructed to replace an existing school on an existing site. Benefits SCAP funding option to modernize (address aging facilities) New facility meets current standards and codes Increases facility lifespan Can address lack of capacity Reduced disruption; construction can occur while students use old school Challenges Lead time (2-6 years) to complete Coordinating construction with school operation on site; may limit field or play space Significant capital funding

18 Add portable classrooms
Portables are added adjacent to an existing school. Benefits Short lead time (~1 year) Installed with limited disruption Lower cost per classroom than permanent construction Flexibility to relocate based on shifting needs Challenges Increased population may stress core facilities Security concerns Shorter building life May limit outdoor space Space, permitting, or code constraints Limitations on shared instructional space / small group rooms

19 Add teacher planning rooms
Teacher planning rooms are added to free up classroom space all periods of the day. Benefits Increases classroom capacity through efficient use of space Needed facility modifications can be completed quickly Not a significant capital expense Challenges Increased population may stress core facilities Changes teacher planning location and more teachers must share classrooms Increases capacity only at schools without existing planning spaces

20 Non-capital investment strategies
The following strategies do not require capital investment. Instead they rely only on operational funding. Double shifting Year-round multi-track schedule Increase class sizes Change school attendance boundaries

21 Double shifting Two shifts of students use a school each day, one in the morning and one in the afternoon. Challenges To meet school year requirement of 6 hours/day for 180 days, shifts would start early and end late Increased costs due to transportation, operations, facility wear Reduced hours for maintenance and after-school activities Complicates schedules for extra- curriculars and parents/guardians May be unfavorable to staff, reducing ability to retain them Benefits Maximizes use of school space Minimizes district need for capital expenditures Could be done on school-by- school basis or entire district

22 Year-round multi-track schedule
Schools operate almost the whole year, with students on different tracks. 60 days of school and 20 days of vacation, year-round, is one example. Benefits Maximizes use of school space Could be done on school-by- school basis or entire district May prevent teacher burnout by providing frequent breaks May reduce reliance on substitutes and give permanent staff greater work opportunity if teachers choose to work during breaks Challenges Extensive revision of district curricula, graduation requirements, electives, etc. Increases facilities wear May be unfavorable to staff, reducing ability to retain them Complicates schedules for extra- curriculars and parents/guardians, especially for multi-student families Investments in AC for summer sessions may be necessary

23 Increase class sizes More students are assigned to each classroom.
Benefits Increases capacity without capital costs Challenges Counter to current legislative trends and educational outcomes research May increase strain on core facilities # of students

24 Change school attendance boundaries
School attendance boundaries are changed to use current facilities more efficiently. Benefits No capital funding required Aligns school enrollment with available capacity, temporarily reducing need Reduces overcrowding, increasing educational outcomes Challenges Does not address overall district capacity needs; limited to current space Requires that some families/students change schools, potentially affecting student learning and experience Requires time- and labor-intensive public process for reboundary decisions May increase transportation costs

25 Questions?

26 Break

27 Strategies: Small group conversations

28 Small group guiding questions
Discuss the benefits and challenges of your strategy. Do you have anything to add? Would any additional information be helpful? Does this strategy have promise for the district? Are there other strategies that the Task Force should consider? Prepare to report out to full group; note-taker sends notes to Penny after meeting. Print slides as handouts Note-taker in each group, report out, later send to Penny

29 Large group discussion
Report out from small groups Develop full list of promising strategies Next steps toward developing recommendations

30 Emerging policy issues

31 Tracking and addressing policy issues
The Task Force has brought up a number of policy issues so far, with more to come Issues and questions include: Portables – condition, age, replacement, reliance on use Future-proofing – upsizing new schools or core facilities to accommodate future growth beyond projections Design of schools – quality and lifespan of materials, cost/quality tradeoffs Scope of recommendations – should TF consider admin/maintenance buildings, or only schools? How should the Task Force track and address these and other policy issues?

32 Next steps Next meeting: Thursday, June 15 at 5:30 PM, Naches Trail Elementary School Discuss design, siting and construction best practices for school facilities Poll for day and time of August full-day workshop Anything else?

33 Contact us Penny Mabie Neutral facilitator, EnviroIssues Cathie Carlson Director of Construction and Planning, Bethel School District

34 Thank you!