1 DOM integration meeting
November Daan van Eijk

2 news Daniele will officially take over DOM integration coordination due to my departure to the US. Starting date: 1 February Congratulations and good luck!!!

3 actions from previous meeting
Daniele: Status of retuned HV on 6 PMTs in DOM67 Send instructions of how to obtain the advertised white gas (to Emanuele in particular!) Send pictures of optional markings on glass and bottom support structure when gluing the piezo Emanuele: Send data sheet to DvE for the ‘nafta’ that was bought as ‘white gas’ Oleg: Perform (yet another) gel hardening test on the material of the tube itself Daan: PMT O-rings batch 4.6 is useable, but not ideal. Edward will order new batch Question: how are you doing with leakages when using batch 4.6?

4 Other issues PMTs will not be calibrated anymore
In acceptance test, use latest version of the Get_PMT_HV_settings script This will get the uncalibrated HV values Also, the testing sheets have changed accordingly, now version 8: KM3NeT_QA_2016_216-DCR_DOM_Test_Sheets_v1 Removal of grounding cables: How are you doing? Pictures? Still waiting for lists with numbers from everyone but Emanuele Don’t forget to remove the ‘Grounding cable’ column in the assembly tables of the local integration database (let me know if I can help) New fiber tray routing procedure (KM3NeT_INT_2014_007_DOM_Fibre_Tray_Routing_Procedure_v4) KM3NeT_QA_2016_225-DCR_DOM_Fiber_Routing_Procedure_v1 Did you know… there are two types of A/D filters? And that the fiber routing procedures handles both? KOAD-100-AS-CH59C-900L-52 and KOAD-S-100-AS-CH59C-900L-52 And if I say ‘duplex clips’, what do you think?

5 Other issues (2) Put kapton on the power board connector: NCR 2016_223
Now also in DOM integration procedure! Edward has developed a collar bending tool, see KM3NeT_INT_2015_010- DOM_Integration_Tools_v2 Please pay attention to the orientation of the reflector rings: Opening in reflector ring should always point to DOM poles: top structure: up, bottom structure: down Adapted integration procedure to make this more clear See pictures below for ‘good’ and ‘bad’

6 Other issues (3) New DOM integration software, now version 1.8
DCR KM3NeT_QA_2016_215-DCR_DOM_Integration_Software_v1 Removed grounding cable + some fixes Shipments to four integration sites -> all arrived I might have mixed up one or two small bags between Athens and Erlangen, will sort this out with Oleg and Giorgos Question from Giorgos: How many DOMs have been built without ESD protection in Catania and Erlangen?

7 DOM production Planning and status
realized planned I’d like to understand how far we think we can get by the end of Let’s discuss after presentations by sites. Current DOM count: = 90 Total current DOM count: 19 (2014) + 46 (2015) + 90 (2016) = 155

8 Rest of meeting: review

9 DOM integration plan Document name: KM3NeT_INT_2015_009-DOM_Integration_Plan Current version: 4 Latest DCR: KM3NeT_QA_2016_196-DCR_DOM_integration_plan_v1 Most notable changes: added more responsibilities for DOM integration coordinator Proposed changes for next version: none

10 DOM exploded view Document name: KM3NeT_INT_2015_001-DRA_DOM_Exploded_View Current version: 15 Latest DCR: KM3NeT_QA_2016_220-DCR_DOM_Exploded_View_v1 Most notable changes: removed grounding cable Proposed changes for next version: none

11 DOM Description of components
Document name: KM3NeT_INT_2016_006-DOM_Description_of_Components Current version: 3 Latest DCR: KM3NeT_QA_2016_222-DCR_DOM_Description_Of_Components_v1 Most notable changes: title change, removed grounding cable Proposed changes for next version: none

12 DOM integration tools Document name: KM3NeT_INT_2015_010-DOM_Integration_Tools Current version: 2 Latest DCR: KM3NeT_QA_2016_221-DCR_DOM_Integration_Tools_v1 Most notable changes: include backspacer bolt mounting, drawings HV cap cutting tool, collar bending tool, include pictures of DOM electrical lift Proposed changes for next version: design and drawings for FPGA cooling block mounting tool and octopus large mounting tool

13 DOM testing Document name: KM3NeT_DOM_2016_004-DOM_Testing
Current version: 3 Latest DCR: KM3NeT_QA_2016_224-DCR_DOM_Testing_v1 Most notable changes: see extra tab in DCR and word document with Oleg’s comments attached to indico meeting, Ronald’s appendix on data taking Proposed changes for next version: Add proper location of software, change Get_PMT_HV… script to print MAC address from DB directly for cross-check. Or preferably: change testing altogether, move to Control Unit operating the DOM. Will spend the next few weeks on this

14 DOM integration procedure
Document name: KM3NeT_INT_2015_008- PRO_DOM_Integration_Procedure Current version: 5 Latest DCR: KM3NeT_QA_2016_223-DCR_DOM_Integration_Procedure_v1 Most notable changes: see extra tab in DCR and excel sheet attached to indico meeting Proposed changes for next version: none

15 DOM integration documents
Document name: KM3NeT_INT_2016_002-DOM_Integration_Documents Current version: 4 Latest DCR: KM3NeT_QA_2016_226-DCR_DOM_Integration_Documents_v1 Most notable changes: all new versions as discussed here

16 Finally, the full list of dcr’s discussed today
KM3NeT_QA_2016_215-DCR_DOM_Integration_Software_v1 KM3NeT_QA_2016_216-DCR_DOM_Test_Sheets_v1 KM3NeT_QA_2016_220-DCR_DOM_Exploded_View_v1 KM3NeT_QA_2016_221-DCR_DOM_Integration_Tools_v1 KM3NeT_QA_2016_222-DCR_DOM_Description_Of_Components_v1 KM3NeT_QA_2016_223-DCR_DOM_Integration_Procedure_v1 KM3NeT_QA_2016_224-DCR_DOM_Testing_v1 KM3NeT_QA_2016_225-DCR_DOM_Fiber_Routing_Procedure_v1 KM3NeT_QA_2016_226-DCR_DOM_Integration_Documents_v1

17 Communication The question now is: how do we make sure that
We have all read all documentation We have all read all DCR’s We communicate all changes to the technicians doing the work Recommendation (maybe this should be obligatory?): Integrate one DOM side-by-side with technicians, following procedures literally