Download presentation
Presentation is loading. Please wait.
Published byHenry Lucas Modified over 6 years ago
1
HO Corrector Magnets: decapole test and future plans
Marco Statera on behalf of the LASA team INFN Milano - LASA CERN – 25 October 2017
2
MCQSXFP (4pole) and MCTXFP(12pole) planning
OUTLINE MCDXFP1 (decapole) Cold test results MCQSXFP (4pole) and MCTXFP(12pole) planning MgB2 RCSM status and planning New cryostat M. Statera- 2017/10/25
3
HO CORRECTOR MAGNETS ZOO
MCDXFP1 M. Statera- 2017/10/25
4
integrated field @ Iop @ r50 mm
MCDXFP1 10POLE nominal simulation length 172 mm 183 mm integrated r50 mm 25 Tmm 26 Tmm magnetic length 95 mm 97 mm harmonics B15=11.6 B25=-0.7 5 coils BTS2 5 coils hybrid COILS Updated BTS2 Arisawa design Hybrid BTS2/DURATRON Improved electrical connection design, pcbs supporting and integration with connection box M. Statera- 2017/10/25 M. Todero and D. pedrini
5
Measurement As assembled After thermal cycle GROUND INSULATION
10 mA limit M. Statera- 2017/10/25
6
THERMNAL CYCLES Cooldown about in 1 day Warmup in about 1 week
Nitrogen heat exchanger Warmup in about 1 week Standard warming speed below 10 k/h Using heaters K/h (temperature range 20 K -60 K ) temperature hours hours M. Statera- 2017/10/25
7
MCDXFP1 TEST Week 1 Week 2 – starting on 9/10/2017
4.2 K Iult , 121 A (115% Iop) 2.17 K Iult , 121 A Week 2 – starting on 9/10/2017 no dump resistance quench (operating conditions simulation) training M. Statera- 2017/10/25
8
MCDXFP1 QUENCH SEQUENCE
B9-B10 B3-B4 B3-B4 B7-B8 B3-B4 B3-B4 One provoked One 98 A quench Ultimate 114 A -1 h test (4.2 K and 2.17 K) Reached 100% S.S.L at 4.2 K M. Statera- 2017/10/25
9
QUENCH vs COILS TECHNOLOGY
Quench detection detects 2 coils Quench heater on coil B3 (3 provoked) 4 quenches on B3-B4 1 quenches on B7-B8 1 quenches on B9-B10 B1 M10-05 B2 M10-08 B3 M10-09 B4 M10-11 B5 M10-13 B6 M10-06 B7 M10-10 B8 M10-12 B9 M10-14 B10 M10-15 BTS2 4 One (2) BTS2 coil less robust No sensitive difference between coils’ technology 1 DURATRON 1 M. Statera- 2017/10/25
10
SINGLE POINT MAGNETIC FIELD
Single Hall probe rref= 50 mm Errors not shown Good reproducibility Harmonic measurements at CERN in Nov 2017 4.2 K and 2.17 K 4.2 K after thermal cycle O simulations M. Statera- 2017/10/25
11
QUENCH PROTECTION SYSTEM UPGRADE
2 IGBTS working in parallel Same components as 10 kA switch (by A. Paccalini and M. Quadrio) 15 ms <1 ms trigger M. Statera- 2017/10/25
12
WORKING CONDITION TEST
Protection in LHC Measuring current time range ms Max current: ultimate current (114 A) Protection at LASA Measuring total voltage and differential voltage (half magnet) Quech induced by heater (and AlN insert) Increase validation time Reached 120 ms and 140 ms at ultimate current Decapole survived M. Statera- 2017/10/25
13
AFTER THERMAL CYCLE Detailed inspection on one side
One defect on coil M10-14 No detached wedges M. Statera- 2017/10/25
14
tender approved by INFN contract sent to company – arrived
MCTXFP1 AND MCQSXFP1 tender approved by INFN contract sent to company – arrived (foreseen) start in October – 3 wks delay Tentative schedule April 2018 MCTXFP delivered to LASA Sept MCQSXFP delivered to LASA M. Statera- 2017/10/25
15
ROUND COIL MAGNET demonstrator demonstrator mechanics design ongoing
Fe coil 100 mm f 380 demonstrator mechanics design ongoing Winding machine done mould construction done first batch of insulated MgB2 wire delivered at LASA schedule winding in 2017 magnet assembly 1Q 2018 demonstrator M. Todero and D. pedrini C. Uva M. Statera- 2017/10/25
16
ROUND COIL MAGNET II Test Cu coil schedule winding in 2017
M. Quadrio and A. Paccalini schedule winding in 2017 magnet assembly 1Q 2018 M. Statera- 2017/10/25
17
NEW CRYOSTAT Safety Valve and disk Connections X3 Cryostat for testing MCTXFP1 (12P), MCQSXFP1 (4P) and series magnets 520 mm inner diameter About 3 m cold volume (with top flange insulation) Up to 4 magnets (3 possible configurations) Flange modification, thermal insulation, magnet support, room temperature connections. Ordered end 2017 Mag.meas. CL 2+4 HE inlet M. Statera- 2017/10/25
18
3 batches TEST CONFIGURATIONS 18 magnets 2X4P 2X12P 5 cooldowns 600
2350 12P 4P 3 batches 18 magnets 2X4P 2X12P 5 cooldowns M. Statera- 2017/10/25
19
MgB2 RCSM MCDXFP1 MCQSXFP1 and MCTXFP1: 2018 New cryostat (MAGIX)
CONCLUSION MCDXFP1 assembled first cooldown and thermal cycle results MCQSXFP1 and MCTXFP1: 2018 MgB2 RCSM Winding end 2017 New cryostat (MAGIX) Flange and magnet support 1Q 2018 M. Statera- 2017/10/25
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.