Introduction to pipe sizing for high rise buildings
Lesson No 9 (15 minutes)
3
Different Combinations
Up-feed system with a pressure pump Up-feed system where half the building is directly from the water main and half with a pressure pump. Down-feed system, requiring a booster pump at ground level, a header tank at the top of the building and a pressure pump to feed the top 4 to 8 levels. Note: In these cases more than one ‘Project File’ is required to complete the pipe sizing.
5
Not for Potable Water
7
Making Duplicate Files
When the project details are completed, if duplicate files are required now is a good time to make them. Use the same project file number, simply add ‘a’ ‘b’ or ‘c’
8
Fire Potable Water
14
B A C
15
Email questions Click Here
State that it is WaterFlow Lesson 9 End of Lesson No 9