Download presentation
Presentation is loading. Please wait.
1
Increase storage capacity
(30% of the river flow for 8 months- over 20% will be lost by 2025) Over 80% of the flows in the basin comes from rainfall and 70% flows during monsoon – storage must!!
2
Budhi Gandaki Mw
6
Nepal Invest Summit 2017 China 8.3 Bn. Plus Bangladesh 2.4 Bn. Japan
Country Amount China 8.3 Bn. Plus Bangladesh 2.4 Bn. Japan 1 Bn. Plus UK Srilanka 500 Mn. India 317 Mn. Nepal 11.5 Mn. Total 13.52 Bn.
7
NEPAL-BANGLADESH TO SIGN POWER TRADE AGREEMENT
AGREEMENT BETWEEN THE GOVERNMENT OF NEPAL AND THE GOVERNMENT OF THE REPUBLIC OF INDIA ON ELECTRIC POWER TRADE, CROSS-BORDER TRANSMISSION INTERCONNECTION AND GRID CONNECTIVITY NEPAL-BANGLADESH TO SIGN POWER TRADE AGREEMENT NEPAL - CHINA TO CONNECT POWER GRID BANGLADESH, BHUTAN, INDIA, NEPAL TO SIGN PTA
8
Pancheswar Multipurpose Project – 5,000 MW
PDA SIGNED FOR 1800 MW PROJECTS Pancheswar Multipurpose Project – 5,000 MW
9
T/L projects – 2035 China
10
THANK YOU glp2067@gmail.com
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.