PC_CA_SWE_08 2G oss kpi Refer to OSS Analysis # Description
Target Value Technology Baseline KPI Result PASS/FAIL comments 2G (23/01/ /01/2017) (03/05/ /05/2017) A Cell Availability Maintain/Improved 99.81 99.97 PASS A CSSR_Voice 99.68 99.76 A DCR_Voice 0.15 A PS_Drop 1.05 1.03 A Timing Advance 0.00 A CS Traffic (Erl) A TCH attempt Fail Refer to OSS Analysis A PS traffic (GB) 306.15 258.93
4
PC_CA_SWE_08 2G oss kpi justification
5
PC_CA_SWE_08 2G oss kpi justification
6
PC_CA_SWE_08 2G oss kpi justification
Hammer Project KV020 S-KPI CBO © Ericsson AB 2016
7
PC_CA_SWE_08 2G oss kpi justification
8
Multitech 3G kpi Justification
PROJECT BAU MODERNIZATION Multitech 3G kpi Justification
9
PC_CA_SWE_08 3G oss kpi justification
Region CA Cluster Location ID Site Name 4G Site ID Co-Site 3G Site ID Co-Site 2G Site ID CA On Air Date SARAWAK PC_CA_SWE_08 Q00278 LIHUAHOTEL QL10081 QW10081 G6355 2017/2/8 Q00266 PDRMBTU QL10189 QW10189 G6328 2017/2/11 Q00282 CHINESECHAMBER QL10084 QW10084 G6359 2017/3/15 Q00666 TGBATUCOMM QL10082 QW10082 G6303 2017/4/7 Q00288 SGNYIGU QL10156 QW10156 G6365 2017/4/9 Q01297 TAMANBAMBOO QL10987 QW10987 2017/4/10 Q00667 TMNYANMIN QL10154 QW10154 G6308 Q00253 PUSPAKOMBTU QL10393 QW10393 G6314 2017/4/13 Q00832 JLNDAGANGBTU QL10724 QW10724 G6304 Q00682 SHAHIDACOMM QL10450 QW10450 G6377 2017/4/14 Q00548 BKTORANG QL10390 QW10390 2017/4/21 Q00723 TMNRIA2 QL10085 QW10085 G6391 2017/4/22 Q01653 TMN KEMENA SUTERA 2 QL10738 2017/4/25 Q00665 MEDANJAYA QL10083 QW10083 G6312 2017/4/27 Q00246 JLNSEBIEW QL10174 QW10174 G6305 2017/5/3
10
Refer to OSS Justification
PC_CA_SWE_08 3G oss kpi justification # Description Target Value Technology Baseline KPI Result PASS/FAIL comments 3G to to A Cell Availability Maintain/Improved 98.84 99.55 PASS A CSSR_AMR 99.85 99.73 Fail Refer to OSS Justification A CSSR_PS 99.78 99.76 A AMR Call Drop Ratio 0.26 0.25 A PS Service Drop Ratio 0.57 0.53 A SHO Success Rate (AMR Service) 99.93 99.96 A SHO Success Rate (PS Service) 99.94 A HS-DSCH Service Cell Change Success Rate 99.98 99.99 A HSDPA RAB Setup Success Rate 99.05 99.07 A HSUPA RAB Setup Success Rate 99.88 A HSDPA Retainability 0.61 A HSUPA Retainability 0.60 0.55 A CS Inter-RAT Handover Success Ratio 99.84 99.87 A CS Inter-Frequency HHO Success Rate 98.93 98.50 A PS Inter-Frequency HHO Success Rate 98.41 98.10 A RTWP A PRACH propagation delay(KM) 0.73 0.74 A CS Traffic(Erl) A CS RAB attempt PS RAB attempt A PS traffic(MB)
11
Hammer Project KV020 S-KPI CBO
PC_CA_SWE_08 3G oss kpi justification Add propagationdelay. Analysis: CSSR AMR (99.73%) didn’t pass the target (99.85%) mainly due to fluctuation of Q118B_Q00288OD_SGNYIGU which is on air on 11th May. © Ericsson AB 2016
12
Hammer Project KV020 S-KPI CBO
PC_CA_SWE_08 3G oss kpi justification Analysis: Add propagationdelay. After below optimization, CSSR AMR is improving and met the baseline in some days. Cluster capacity audit and congestion release(pwrAdm, pwrOffset, individualOffset). Worst cell analysis and optimization(maxFach1Power, minPwrRl, qRxLevMin). For detailed change, please refer to action list. © Ericsson AB 2016
13
Hammer Project KV020 S-KPI CBO
PC_CA_SWE_08 3G oss kpi justification Analysis: Add propagationdelay. CSSR PS(99.76%) didn’t pass the target (99.78%) due to normal fluctuation. © Ericsson AB 2016
14
Hammer Project KV020 S-KPI CBO
PC_CA_SWE_08 3G oss kpi justification Analysis: Add propagationdelay. CS and PS IFHO SR (98.50%, 98.10%) didn’t pass the target (98.93%, 98.41%) as KPIs degraded slightly after baseline alignment on 10th April. NonUsedFreqThresh4_2bEcno is changed from -10dB to -13dB, so IFHO could be triggered when target cell has poorer quality than before, causing IFHO failures increased. © Ericsson AB 2016
15
Hammer Project KV020 S-KPI CBO
PC_CA_SWE_08 3G oss kpi justification Analysis: Add propagationdelay. PRACH propagation delay is maintained in the long trend and failed in result period due to normal fluctuation. © Ericsson AB 2016
16
Hammer Project KV020 S-KPI CBO
PC_CA_SWE_08 3G oss kpi justification Add propagationdelay. © Ericsson AB 2016
17
Hammer Project KV020 S-KPI CBO
PC_CA_SWE_08 3G oss kpi justification Add propagationdelay. © Ericsson AB 2016
18
4G OSS KPI Justification
4G_CA project_OSS Justification 4G OSS KPI Justification © Ericsson AB
19
4G_CA project_OSS Justification
PC_CA_SWE_08 4G oss kpi © Ericsson AB
20
4G_CA project_OSS Justification
Q G oss kpi © Ericsson AB
21
Hammer Project KV020 S-KPI CBO
Data CSSR & RRC CSSR & RRC Service & erab CSsr (%) Analysis: The CSSR for Data ,RRC,RRC service and eRAB of the cluster sites are 99.73%, 99.90%, 99.94%, 99.83% which has a slight degradation compare with the baseline 99.80%, 99.94%, 99.95%, 99.86%. The degradation is mainly cause by the adjusting of qrxlevmin (from -120 to -124) which aiming to keep more users on 4G, the subscribe at the cell edge will stick to LTE with low poor RF condition while the 4G total volume increased as a result, it’s an exceptional decrease just as below summary in mail; Baseline Result qrxlevmin © Ericsson AB 2016
22
Hammer Project KV020 S-KPI CBO
CSFB Setup SR(%) Analysis: The CSFB Setup SR for the neighbor site is 99.94% which is a litter worse than baseline 99.95% ,it is normal fluctuation; Baseline Result Normal fluctuation © Ericsson AB 2016
23
Hammer Project KV020 S-KPI CBO
eRAB DCR(%) Analysis: The eRAB DCR for the cluster site is 0.13% which is worse than baseline 0.10% was mainly due to the CA layer management parameters changed on whole OKV. CA layer management parameters was aiming to keep more users on 4G, which means the subscribe in cell edge will stick to LTE with low poor RF condition while the 4G total volume increased as a result, it’s an exceptional decrease just as below summary in mail; Baseline Result CA layer management parameters change © Ericsson AB 2016
24
Hammer Project CA SSO Report
UL Packet Loss Rate Analysis: Feature Description 44/ LZA /1 Uen B2 , under Chapter 4, Network Impact. © Ericsson AB 2017
25
Hammer Project CA SSO Report
UL Packet Loss Rate OKV DL PKT Loss Rate improved from (~0.35) to (~0.09) which will be reflected in user experience Baseline Result © Ericsson AB 2017
26
Hammer Project CA SSO Report
Network Availability Analysis: The Network Availability Cell Level is 99.35% which is worse than baseline 99.73% was mainly due to several sites had the PLMN Service Unavailable alarm during 5/23/2017-5/29/2017. © Ericsson AB 2017
27
Hammer Project KV020 S-KPI CBO
IRAT(%) Analysis: The IRAT SR Rate for the sites is 97.49% which is worse than baseline 97.89% was mainly due to the CA layer management parameters changed on whole OKV. The decreasing B2 and B2 Timer adjustment were aiming to keep more users on 4G, it’s harder to transfer to WCDMA for UE in cell edge than before, which means the subscribe will stick to LTE with low poor RF condition while the 4G total volume increased as a result, it’s an exceptional decrease just as below summary in mail; Baseline Result B2 B2 Timer © Ericsson AB 2016