Download presentation
Presentation is loading. Please wait.
Published byEugene Houston Modified over 6 years ago
1
National progress in establishing national radon measuring capacity in Bosnia and Herzegovina October 2017 Yerevan, Armenia Bosnia and Herzegovina State Regulatory Agency for Radiation and Nuclear Safety
2
Introduction Legal framework Operational capacities for measurements
Equipment for measurements About measurements in general Conculsion
3
Legal framwork At this point of time:
Regulation on environmental monitoring – no Rn-222 Regulation on technical services – Rn -222 in air & water, no soil Regulation on concentration limits for radionuclides – Art building materials (Ra-226, K-40 & Th-232) No Regulation on NORM Radon on working places 1000 Bq/m3
4
Legal framwork cont‘d In the plan
New Regulation on environmental monitoring – 2013/59/Euratom & 2013/51/Euratom Regulation on NORM – Rn-222 Update of radon on working places
5
Operational capacities for measurements
2 authorized technical services for Rn-222 air 3 authorized technical services for environment 1 investigation laboratory 1 authorized laboratory with ISO/IEC 17025 Interests joining forces New laboratories
6
Equipment for measurements
At this point of time < 300 charcoal canisters 1 Alpha GUARD type PQ 2000 PRO/MC50 Radosys Few CR-39 Announcement of new Alpha GUARD
7
Equipment for measurements cont‘d
In the plan New CR-39 (No not specified) Analyzing in or out of BoH??? New active detector???
8
About measurements in general
At this point of time Done by order or investigation basis Passive method - cca 72 hours Gamma spectrometry Past data No measurements of building materials
9
About measurements in general cont‘d
In the plan Initial survey followed by mapping In public buildings, dwellings & soil All measurements by ISO/IEC 17025 Measurements of building materials Closer cooperation with „non-radiation“ inspectorates
10
Conclusion Good legal framework basis
Operational capacities could be improved Equipment has to be improved & upgraded Measurements need to be updated & expanded
11
Thank you! Questions?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.