Download presentation
Presentation is loading. Please wait.
1
SuperB Experimental Hall
F.Forti
2
Babar - OUT
3
Babar - IN
4
SuperB Hall concept Same concept as Babar Space is important
In and Out position, with shielding wall Assemble the detector while in the out position In parallel commission the machine without detector Move on the beam when ready Space is important IR2 too small (about 14m x 20m behind the wall), need to enlarge But, underground halls do cost money Need to find the right compromise First round of ideas shown here, no real study Drawings made by P.Popolizio and A.Paoli (Pisa/EGO) Installation and assembly needs to be carefully studied No truck access to the hall, need to lower everything with crane.
5
SuperB Top View Electronics House
6
SuperB Side View Shaft Electronics
7
SuperB Front view Electronics
8
Cranes SuperB Hall – 3D Shaft Beam tunnel
9
TALK BY S.TOMASSINI SPARX 1st stage SuperB LINAC SPARX future
10
Torvergata Area - Section S.1 - S.5
Geological Analysis Torvergata Area - Section S.1 - S.5 Formed by the Colli Albani volcano more than years ago Very Stable No important seismic activity S.1 S.2 S.3 S.4 S.5 Soil Sea Level Altitude (m) Brown Pyroclastic Rock Gray Pyroclastic Rock Preliminary
11
Seismic map Thanks to Concezio for pointing it out. Maximum ground acceleration, with a 10% probability of exceeding it in 50 years.
12
La Biodola Rome