Northern Exposure 17 In Progress Review 20 MAR 2017 Unclassified
2
Agenda Video Exercise Mission & Objective Exercise Scenario & Design
Exercise Events & Timeline Director & Section Overviews Alibis & Questions Sr. Leader Comments & Guidance Unclassified
3
2017 Statewide Exercise Mission Statement
2017 Statewide Exercise, is a virtual and constructive Full Scale/Command Post Exercise from June 2017 to validate local and state agency plans, in addition to confirm the readiness of the Michigan National Guard to provide Defense Support of Civil Authorities. Unclassified
4
State Proposed Exercise Goals and Objectives
Educate exercise participants with a broad understanding of potential impacts of a long term power outage. Provide exercise participants with a frame of reference, per agencies plan, for actions required to address impacts of a long term power outage to networks and critical infrastructure. Evaluate impacts to state of Michigan lifelines and develop strategies to mitigate associated consequences. Prioritize the urgency of issues facing the state of Michigan against those of states directly impacted and determine appropriate courses of action. Develop and disseminate a uniform message to the public and media through the Joint Information Center utilizing all available mediums. Unclassified
5
MING CDRs Exercise Intent
Purpose: Train and confirm the readiness of Michigan National Guard to provide support to civil authorities in a realistic constructive and simulated training environment. Key Tasks: Confirm the readiness of MING units to provide capability and support for State civil support missions. Increase MING interagency understanding and cooperation through incorporation of Military and Civilian Federal, State and Local partners. Exercise MING Joint Staff in employment of State (SAD/Title 32) forces during a complex catastrophe. End State: MING is trained and confirmed ready to support civil authorities within deployment timelines. Unclassified
6
MING Exercise Objectives
Confirm MING readiness to conduct mission command of forces in a multi- phased, DSCA operation. Stand-up of JFHQ-MI and JTF. Transition operational lead from JFHQ-MI to JTF. Exercise full integration of JFHQ-MI and JTF in SEOC over three days of continuous 24 hour operations. Coordinate and facilitate integration of Federal, State, and Local capabilities with MING throughout the duration of the exercise. Exercise the incorporation of MING units into the National Response Framework and National Incident Management System. Coordinate with and support a Unified Command at State level. Maintain and report status of deploying assets, to include a Common Operating Picture (COP) as part of the ability to effectively command and control forces as they arrive and operate in the established Operations Area. Integrate MING Cyber Assets into Commercial, State and Federal response to a targeted denial of services. Unclassified
7
Cyber Scenario for NE17 Cyber scenario for FEMA Region V based on
UNCLASSIFIED Cyber Scenario for NE17 Cyber scenario for FEMA Region V based on Lloyd’s report “Business Blackout”. Malware goes undetected until it is triggered (zero day vulnerability). Hackers covertly and systematically disable safety systems that would usually protect the generators from desynchronization events. Multiple sites are compromised but protective relays make attack non-viable at 50% of these sites. In roughly 10% of infection cases, attacker is able to access certain vulnerable generators: – Results in overload and burn out, in some cases causing physical damage. Attack occurs during summer peak-day conditions. Sudden reduction in generating capacity triggers blackout throughout FEMA Region V. Unclassified 5
8
Primary References
9
Scenario Purpose The purpose of this scenario is to provide participating agencies with an opportunity to assess their preparedness, response and recovery protocols, plans, and capabilities in the event of a long-term power outage precipitated by a cyber attack on the US Electric Grid. Scope The power outage incident depicted is a catastrophic cyber-attack on the U.S. power grid conducted by unidentified hostile actors inserting malware into electricity control room systems months in advance to exploit industrial control system vulnerabilities. The resulting blackout impacts The attack is released in the Midwest United States, focusing efforts across two mutually supporting electric reliability regions (Midcontinent Independent System Operator, Inc. [MISO] and PJM Interconnection [PJM]).leaving 6 states in FEMA Region V and more than 40 million residents without power and creating cascading effects affecting communications, public health, transportation and commerce across a wide region.
10
FEMA Region V Outage Areas
Projected as of 20DEC16
11
Scenario Challenges Affected Regional Population ~40 million
NOTIONAL FOR EXERCISE USE ONLY Affected Regional Population ~40 million Power infrastructure attack Widespread Power Outages Industrial Accidents Secondary TIC/TIM Releases Disruption of Water/Sewer Services Degradation of Health Services Disruption to Transportation Services Disruption to Commerce Civil Unrest Scarcity of Commodities Unclassified
12
Proposed Participants
Federal or DoD State or Title 32 Partner Agencies Governor’s Office Michigan State Police Michigan EM & HSD (SEOC) Michigan Department of Civil Rights Michigan Department of Natural Resources Michigan Department of Technology, Management and Business Michigan Department of Health and Human Services Michigan Department of Transportation Michigan Department of Agriculture and Rural Development Michigan Department of Regulatory and Licensing Michigan Department of Environmental Quality Michigan Department of Corrections Michigan Agency for Energy Agency for Aging and Adult Service Local Agencies: Macomb County Jackson County St. Clair County Muskegon County Kent County Trenton s Kentwood Fire Commercial Partners ITC Holding Corp. Enbridge Consumer’s Energy DTE Energy Emergent Biosolutions Merit Network American Red Cross Mary Freebed Hospital Veteran’s Corps FEMA Region V ARNORTH Rg V DCO FBI JFHQ-MI DJS/JS-MI HQ ANG-MI 46 MPC Command (EXCON SPT) 51 CST MING Cyber (-) Participation Status Confirmed Confirmed since last IPR Pending Declined As of 09MAR17 Unclassified
13
Scenario Design Concept
Functional Area Emphasis for NE17 Mission Command Emergency Management Cyber Power Medical & Human Services Mission Command Cyber Medical Power Emergency Management Functional Area/ ESF determines requirements & down trace participation. Participating EOCs without participating down trace may require simulation. Unclassified
14
Possible Exercise Interplay (Post TTX )
McComb St. Clair MSP/SEOC DHHS MDOC MING MDOT LARA MAE DAARD DEQ MSP-FD Kent State Agency/Dept County Partner City Participant Commercial Partner Confirmed Pending Trenton FEMA V Joint Staff Emergent Biosolutions STX MING CST Cyber DTMB ITC CE Unclassified
15
2017 Exercise Timeline = 2017 Event = Publication = MING Only Event
16 AUG AAR = MING Only Event 14-17 JUN NE 17 Exercise Window 11-13 JUN Exercise Rehearsal & COMMEX 21-28 MAR MSEL Writing Session – Lansing 15 MAR 17 Objectives/Injects Deadline 24 MAR Final Planning Meeting – Lansing 06 MAR NE17 TTX – Lansing 15 FEB 17 Participation Deadline 28 FEB Publish Exercise Plan List of CRE Operational events/activities - IDT - AT - Fielding’s - Exercises - Conferences 10-12 JAN Middle Planning Meeting and Logistics Synch - Lansing 07 JAN NE17 TTX – Lansing Postponed to APR/MAY pp 22 JUN Initial Planning Meeting ( 22 SEOC) 09-12 JUN JFHQ-MI CPX 23-27 MAY CPX16 TTX / MSEL / EXCON Synch 14-15 APR CPX16 Planning Meeting - Lansing 02 MAR NE17 Concept Development Meeting - Lansing 01 MAR All Hazards Plan Update 22 JAN CPX 16 Sr. Leader Concept Development Meeting 01 FEB Publish Initiating Exercise Directive Version19 013FEB17 06 NOV Approved Concept/JELC Unclassified
16
O/C/T, EX SPT and Role Players Depart
NE17 Exercise Timeline 11 June 12 June 13 June 14 June 15 June 16 June 17 June 18 June SUN MON TUE WED THU FRI SAT -2 -1 1 2 3 4 5 INCIDENT INCIDENT MSP: Warm Start TOA:JTF Merit Cyber Range Multiple Events JFHQ-MI (CPX) AAR NGJS_MI EXCON / LOCON Sync MING Cyber Site Prep 51CST EXCON Arrival EXCON COMMEX MSP Power Outage Cold Start MDOT DHHS DAARD LARA EXCON Depart Scenario Development & Assesment DTMB TOA:DJS McCombe O/C/T, EX SPT and Role Players Depart Trenton St. Clair Kent Consumers Emergent ARC ITC MING FTUS JS-MI JTF-MI Unclassified AS OF: 09MAR17
17
Exercise Geography MING DMVA MSP EM & HSD DHHS MDOT DCR DNR DARD LARA
MAE LBWL DTMB DEQ MDOC ARC Consumers Emergent Enbridge Kent County Kentwood FD Mary Freebed Merit Network ICT Holdings Trenton City Jackson County McComb County St. Clair 18 Unclassified
18
EXCON Support Manning Cell PAX (78) Supporting Executive Command 4
JFHQ-MI Master Control Operations 8/5 46MPC/CTR Communications 5 JFHQ-MI-G6 Medical 1/1 CTR/JFHQ-MI-OSS IAA/LE CTR/JFHQ-G2 Simulation Response HICON 2/6 JFHQ-G5/CTR Response LOCON 19/1 LOCON Functional Area SME 3/6/5 63/177/272 Facilities & Installations 6/2/2 ANG/FE/CG-FC MI CIMS Operators 3 MSP Unclassified
19
IM/KM All Partners Access Network
Register for APAN Account: 2. user name to: .mil 3. Receive an auto generated then go to 4. Save Website to your browsers favorites
20
Upcoming Events FPM: 24MAR17, RFSC Rooms 310
MSEL Writing: 20-27MAR17, RFSC Rooms MICMS/APAN Training: 31MAY, JFHQ, Room 219 NE18 IPM: JUN17 NE17 Cold Start: 12JUN17 NE17 Warm Start: 14JUN17 NE17 ENDEX: 17JUN17 Unclassified
21
NE17 MSEL Timeline MING Wrap MSEL SCRIPTING FPM Agency Wrap
20 March 21 March 22 March 23 March 24 March 19 March MON TUE WED THU FRI SAT SUN 1 2 3 4 5 6 7 NE17IRP Agency Check in Merit Cyber Range Agency Wrap MSEL SCRIPTING MING Wrap MSP MDOT DHHS DAARD MSEL SETUP LARA DTMB FPM CTR Backbrief MING CYBER MINGI Local Agencies Emergent 51CST AS OF: 09MAR17 Unclassified
22
State Wide TTX MSP/MING Take-Aways
Three Module Format Module One: Response & Resource Days 1&2 Locals can cover first hours without issue Module Two: Priority Management Days 5&9 First signs of interagency dependency EMAC impeded in Regional Event Module Three: Long Term Recovery Days 20&30 Heavy reliance on Federal Support Unclassified
23
Status DJS Manning Objectives/Injects Trusted Agents MICMS/APAN
J/G 3/5/7 Manning Trusted Agents Objectives/Injects MICMS/APAN J/G 1 Trusted Agents Objectives/Injects Reports MICMS/APAN J/G 6 Trusted Agents Objectives/Injects Reports MICMS/APAN J/G 2 Trusted Agents Objectives/Injects Reports MICMS/APAN J/G 4 Trusted Agents Objectives/Injects Injects MICMS/APAN Unclassified
24
Status ANG LOCON Contractors Trusted Agents Manning Manning
Objectives Data MICMS/APAN LOCON Manning Playbook Data Reports MICMS/APAN SIM CELL Data Playbooks Contractors Manning MSEL Reports MICMS/APAN Installations Manning Data Playbooks MICMS/APAN JOC Manning Reports COP MICMS/APAN Unclassified
25
JFHQ In Progress Review Director/Section/Unit Overviews
26
J/G 3 In Progress Review Col Southworth As of 17MAR17
27
Key Dates / Deliverables
J3/5/7 NORTHERN EXPOSURE Training Objectives Key Dates / Deliverables Manage Plans, Policies and Integration Support Functions Validate MING AHP Validate SOPs Conduct Strategic Planning Conduct Joint Operations Planning Conduct Inter Agency Coordination Immediately respond to DSCA Mission requirements Plan for Integration of External Forces Support JRSOI Determine EMAC/Title 10 Support requests NE17 Weekly Synch – 1st & 4th Tuesday JFHQ NE18 CDM, 24FEB17, JFHQ SW-TTX: 06MAR17, MSP SEOC 1917 Room FPM: 24MAR17, RFSC Room 310 A/B MSEL Scripting, 21-28MAR, RFSC 310 A/B NE18 IPM: TBD APR/MAY Issues/Concerns Other Joint Staff Manning/Training level LNO requirements and capabilities/personnel JOC requirements MSP-EMHSD Serves as Lead Agent for NE17 TBD (Target 01DEC16) Unclassified
28
J/G3 Task Organization TAG DJS COS-JS SEOC LNO J1 J2 J3 J4 J5 J6 J33
Unclassified
29
SPECIAL STAFF Unclassified Projected: 1 Mar 2017 DJS BGen Wilson
CoS Army COL Roman DOS Air Col Hughes J - JAG LTC Wojcik J - Air LTC Laing Chaplain LTC Kelley Chief of JS COL Jeff Terrill Coordinates with J - PAO LTC Dancer J - Safety LTC Koltveldt Medical Col Martin J1 LTC Gorzynski J2 Lt Col J3 DOMS Col Southworth J4 Lt Col Seeley J5 O-6 J6 COL Tellier J7 Col Webster J8 LTC Gerwolds Deputy J1-Army Lt Col Britton J5 SPP O-5 J6 Plans & Policy MAJ Strickland J3 JDOMS SEA CMSgt Eddy J3 Operations Officer Lt Col J1 Plans Officer CPT Haggerty J3 Operations NCO E-8 J3 JOC Officer O-5 J3 Provost Marshall MAJ Carauna J3 Counter Drug LTC Kuhns J3 Training Officer MAJ Jackson J3 Training NCO E-8 J1 Plans Officer CW2 Ochoa J3 JOC NCO E-9 SFC Roskamp EPS Fill (APR) E-7 TSgt Williams TSgt Ison Unclassified Projected: 1 Mar 2017
30
JS-MI/Ex-75 61% Manning /12 Vacancies IDT APR17 MUTA 4
DPOS NAME COMP GRADE DJS B Gen Wilson ANG O7 J3 SEA CMSgt Eddy E9 J3/DOMS Col Southworth O6 J6 Col Tellier ARNG O5 CoS COL Terrill J7 Col Webster J1 Plans CPT Haggerty O3 CW2 Ochoa W2 J3 JOC NCO EPS Fill APR E7 DJ1 Lt Col Britton J8 LTC Gerwolds J1/Pers LTC Gorzynski J3 CD LTC Kuhns J3 PM MAJ Carana O4 J3 TNG OFF MAJ Jackson J6 Plans MAJ Strickland SFC Roskamp TSgt Ison TSgt Williams J5 Vacant J2/ Intel J3 JOC J3 Ops J5 SPP J3 JOC SGM J3 TNG NCO E8 J3 Ops NCO 61% Manning /12 Vacancies IDT APR17 MUTA 4 MAY17 Commanders Conference JUN17 NE17 SIGACTS- MICMS/APAN TNG: 31MAY17 JS-MI TTX: 31MAY17 NE18 IPM: 01-02JUN17 NE17: 14-17JUN17 Unclassified
31
Status Board Policies, Plans & Procedures
Reporting Requirements & Formats Solidify COP 31 Mar 17 Establish/distribute LOGSTAT/PERSTAT/Facilites reports by 30 Apr 17 Ensure COP integration of GIS products with MSP 30 Apr 17 Establish JOC layout for NE 17 NLT 31 Mar 17 Build out of phone/computer requirements Determine JOC JMD NLT 15 Apr 17 AHP Reviewed and approved NLT 31 Mar 17 Publish SOPs to be exercised NLT 30 Apr 17 Staff Estimates Training Requirements Train all JOC members on APAN Train 15 PAX on MICMS COP Training for KMO Identify MING LNO requirements NLT 15 APR 17 Identify gaps/seems with AHP/appendix
32
Key Dates / Deliverables
JOC NORTHERN EXPOSURE Training Objectives Manning Additional LNO requirements CS MAINTAIN SITUATIONAL AWARENESS CS MAINTAIN COMMON OPERATIONAL PICTURE (COP) CS DIRECT CIVIL SUPPORT OPERATIONS Maintain 24 HR OPS BHO/TOA with DJS Issues/Concerns Key Dates / Deliverables EXCON/LOCON requirements Battle Roster Incomplete: 01 APR 17 J-Staff Footprint’ 01 APR 17 Provide Draft COP to G5 NLT 28FEB17 Staffing Roster complete NLT 22APR17
33
Resource Requirements
Personnel Status 61% Strength Participation Issues/Status J3 needs identify 12 additional personnel Staff Training JOC/J Staff Footprint requirements COP synchronized with MSP Simulation (Units, Infrastructure and Geography) JRSOI notional EMAC/Title 10 notional
34
RFIs/Issues N/A J Staff Manning J-G/A Staff Augmentation requirements
Training Days Available prior to NE17
35
J/G1 In Progress Review COL Bennett As of 16 Mar 17
36
Key Dates / Deliverables
J/G1 NORTHERN EXPOSURE Training Objectives Manning Improved Running Estimates Personnel Accounting/Strength Reporting Red Cross Notifications Casualty Operations Action Officer: CW4 Ulrey/LTC Gorzynski FTSF and MDAY to meet 24/7 OPS A1/G1 augmentation, request supported Issues/Concerns Key Dates / Deliverables Funding for ADOS Action Officer Initial accountability (cold start) DMVA OFS participation NE17 MSEL injects Developing State Active Service pocket handbook
37
J/G1 Status Board Policies, Plans & Procedures
Reporting Requirements & Formats Updated Annex E, Annex R SOPs: SAS Handbook Development-OFS Review Updated PERSTAT MSC/Wing Roll-up Red Cross Message Format RAVE suitability for initial accountability Staff Estimates Training Requirements J1 DOMOPS – 4 pax DSCA PH II – 2 pax JRSOI-FY18 Additional A1/G1 Personnel-Build the Bench APAN MICIMS JOC Drills Personnel Health Services Support Reception Ops
38
J/G1 Task Organization J1 LTC Gorzynski CUOPS Shift A CW2 Ochoa
G1 NCO x2 Shift B G1 NCOIC FUOPS CPT Haggerty LtCol Britton
39
Resource Requirements
Personnel Status A1/G1 Augmentation supported Participation Issues/Status G1 seeks to train additional personnel Space & Equipment (IT, COP) Request seating for training of additional personnel Simulation (Units, Infrastructure and Geography) JRSOI Notional
40
RFIs/Issues DMVA OFS Participation Shared Project Officer-NS/NE17 RFIs
41
J/G2 In Progress Review 1LT Lane Action Officer As of 17MAR17
42
MIARNG G2 NORTHERN EXPOSURE Key Dates / Deliverables
Training Objectives Key Dates / Deliverables Revised MING DSCA Smart Book Due NLT –TBD Target 1DEC16 Revised NING AHP Due NLT –TBD Target 01DEC16 Validate MING G2 SOP IAW MING All Hazards Plan Intelligence Support to DSCA (PUM Process) Intelligence Support to Joint Incident Awareness and Assessment Integrate into daily battle rhythm within the G/J Staff and JOC Issues/Concerns Other Full Time Manning doesn’t stay in the G2 2 Senior Level Vacancies (1 O5/1 O4) 1 Hold (E8/CPT DMD) 1 Medical (E7) 2 Non DMOSQ (E5) 1 Tech OIC (MDAY w/210 MP BN 1LT) 30% Manned/Qualified Integration into the MIOC/SEOC JIAA Workshop (17MAR17) Course coming to Indiana (25-30JUN17) Bring on 35 Series help ISO NE17
43
G2 Task Organization G2 DG2 DG2 (OIC) Cl Officer Intel CWO NCOIC (E8)
AT/FP EM ESS 35F40 Security NCO (E7) 35X50 35G20 35G20 Tech Qualified Contractor Vacant Non DMOSQ Medical Hold
44
Resource Requirements
Personnel Status Which Soldiers will fill out the section during NE17 Space in the JOC Simulation (Units, Infrastructure and Geography)
45
RFIs/Issues NSTR G2 UMR/Manning
Money to bring in 35 Series Soldiers ISO NE17
46
G4/J4 MIARNG In Progress Review COL Nadrasik As of 15MAR17
47
Key Dates / Deliverables
G4/J4 NORTHERN EXPOSURE Training Objectives Manning Consolidate LOGSTAT, COP, and process requests on a daily basis Coordinate transportation support Support JRSOI Cost Capture Integration with state contracting personnel at DMVA-OFS Conduct Accountability of personnel & property Issues/Concerns Key Dates / Deliverables
48
Status Board Policies, Plans & Procedures
Reporting Requirements & Formats Conduct Accountability of personnel & property LOGSTAT submitted to Mr. Bridges 30JAN17 Annex D submitted to Mr. Bridges Staff Estimates Training Requirements Projected Staff Estimates for NE17 Class I Rolling Stock Class III CD Gear & Placement GSA Busses & Placement Commercial Busses Access Armories Cots/Beds Blankets
49
G4 Task Organization G4 * 1 Per shift, 2 shifts. G4 LNO G5 LIASON
LTC. Gerwolds LNO G4 COL. Nadrasik MAJ. Mccostlin SGM. Kwiatkowski G5 LIASON MAJ. Davis CPT. Bowles COMMODITIES CPT. Ramidi CW3. Riley SSG. Fournier CUOPS FUOPS PLANNING CELL CW5. Bird OFFICER Perkins CPT. Moon NCO MSG. Kenny SSG. Krumm RUNNER MSG. Sanderfer SFC. Hart OFFICER 1LT. Papenfuse W01 Andries NCO MSG. Hunter RUNNER SFC. Zanin SSG. Verhulst * 1 Per shift, 2 shifts.
50
RFIs/Issues RFIs Issues
Legal Injects (accident, Civil disturbance incident) Armories Life Support Assets Cots and Beds (TASKORD )
51
J/G6 In Progress Review COL Tellier As of 17FEB17
52
Key Dates / Deliverables
G6 - NORTHERN EXPOSURE Training Objectives Key Dates / Deliverables Install and maintain JFHQ-MI communications network capability, communication requirements and interoperability with JFHQ-MI, to NGB and MSP/EMHSD. Consolidate COMSTAT, COP, and process requests of a daily basis Test and Validate Voice Communications via 800 Mhz radios Transfer of authority of communications to the JFT using JISCC capabilities to receive Emergency Management information COMMEX 22 APR with JOC Internal Network diagram is due 15 May 2017 COMMEX 12 June with outside agencies ANNEX K – in progress Issues/Concerns none PACE JFHQ BDE JFHQ MSP/ agencies P – P – mobile phone A – VOIP A – C – 800 MHz C – VOIP E – mobile phone E – 800 MHz
53
J6 Task Organization J6 Deputy G6 FUOPS CUOPS OIC JISCC Tm Network
** COA – MAJ Strickland is transferred to the G6, he will be the Deputy G6 MAJ LaBara will be the OIC for FUOPS, CW3 Cage will be in the Network Support section for the exercise. Network NET Spt Tm X 2 Tacoms Air Force Comms
54
Resource Requirements
M-Day Soldiers will participate (10 paxs) Locations will include the operations conducted on the drill floor of the JFHQ Bldg, FUPOS in the G5, and the EXCON JISCC team operations Help Desk team operations
55
RFIs/Issues RFIs Issues none none
56
SAO In Progress Review MAJ Smith Action Officer As of 17FEB17
57
Aviation and Safety (AVS) Key Dates / Deliverables
Training Objectives Manning Validate MING All Hazards Plan Provide Aviation and Safety Liaison support to the Joint Staff and further refine staff processes Facilitate Aviation and Safety resourcing support in response to DSCA Mission requirements AVS support during exercise: 2x Aviation Officer/Warrant Officer 1x Safety Officer/NCO LOCON tasked to 3-238: 1x Aviation Officer (O-2 or O-3) 1x 15P Operations NCO (E-5 or E6) 1x 15T Maintenance NCO (E-5 or E6) Issues/Concerns Key Dates / Deliverables None Monthly Senior Leader IPR Monthly Action Officer Synch Meetings Refining aviation staff estimates and aviation liaison products Participation in MESL writing events
58
CFMO In Progress Review COL Hallenbeck As of 17MAR17
59
CFMO NORTHERN EXPOSURE Key Dates / Deliverables
Training Objectives Manning None at this time Mr. Bushnell, maintenance, and environmental will be available during normal business hours Maintenance staff can work alternate shifts Issues/Concerns Key Dates / Deliverables Facilitate Alternate Locaction for 51CST with G5 Upgrade of JFHQ generator: 4th Qtr FY17 Completion of NS C2 building in Grayling: 4th Qtr FY17 Upgrade of JFHQ generator: 4th Qtr FY17 Completion of NS C2 building in Grayling: 4th Qtr FY17 Annex L
60
JAG In Progress Review COL Wojcik As of 17FEB17
61
JAG - NORTHERN EXPOSURE Key Dates / Deliverables
Training Objectives Manning Validate internal policies and procedures for response and support to State missions Identify gaps in responding to mission requirements and supporting JRSOI Identify legal cyber response capabilities and gaps Increase understanding and cooperation with Federal, State and local partners 4 PAX: 3 Judge Advocates and 1 Paralegal 1 Primary 27A 2 Supporting 27A Issues/Concerns Key Dates / Deliverables Current RUF and RUF Card 11-13 June 2017 – Rehearsal 14-17 June 2017 – Exercise Sufficient funding allocation for adequate staffing Sufficient personnel available for proper staffing Equipment and resources
62
PAO In Progress Review LTC Dawn Dancer As of 17FEB17
63
PUBLIC AFFAIRS NORTHERN EXPOSURE Key Dates / Deliverables
Training Objectives Manning Conduct real-world public affairs mission Create/edit/publish print and video products Get published in military and local civilian media Three pax available to support day missions One pax to support night operations Issues/Concerns Key Dates / Deliverables JIIC Operation during NE17 RESOLVED MSP will operate a JIIC. MSP-PIO Starts 13FEB17 Will Coordinate with PIO at TTX All Hazards Plan update 01 MAR 16 Annex F finalized 15 JAN 16
64
Task Organization PAO TAG JIIC
65
MING Cyber In Progress Review
1LT Lukasik Action Officer As of 16 MAR 17
66
CYBER TEAM NORTHERN EXPOSURE Key Dates / Deliverables
Training Objectives Manning Integrate MING Cyber Team into Commercial, State, and Federal response to a targeted denial of services Validation of Network Response to Threat Detection and Mitigation Strengthen relationship with DTMB, MC3 (MSP), Michigan Civilian Cyber Core (MIC3) TBD- Due to Cyber MOB Proposed 2-3 pax (MIARNG & ANG) Issues/Concerns Key Dates / Deliverables Merit Network Support and Capabilities ROE MAR 21-23: MSEL Writing
68
51st Civil Support Team In Progress Review
LTC Andrew Kuhns/1SG Jason Baldwin POC: CPT Andrea Kennedy As of 17MAR17
69
51st Civil Support Team NORTHERN EXPOSURE Key Dates / Deliverables
Training Objectives Manning Execute all unit METs/KCTs in a full scale exercise setting Focus on Interagency Operations, Survey Operations Conduct joint operations with public and private sector agencies (developing/continuing relationships throughout the State of MI and with governmental agencies) Team is currently 21/22 projected 22/22 APR17 Expecting 19/22 boots on ground participation Issues/Concerns Key Dates / Deliverables Location of STX is TBD. Currently Staffing with G5 & FMO and working several COAs Working Issue: Determine requirements and play for Commo Support to MSP during exercise. Continue Coordination with Emergent Biosolutions Attend MSEL Scripting Mar 17 Final planning meeting 24 Mar 17 Exercise Window 15 JUN 17
70
Status Board Policies, Plans & Procedures
Reporting Requirements & Formats CONOP: NLT 01JUN17 TACSOG revision: NLT 30MAR17 Conduct Accountability of personnel & property PERSTAT/LOGSTAT Rave Alert testing for notification Staff Estimates Training Requirements Capabilities brief with Emergent/other partner agencies (based on Emergent/other agency participation in NE17) MICIMS access (Ops personnel current with MSP) Multiple FSEs planned in TY17 Q2/Q3 OSHA physical/PHA completion: 100% CSSC completion: 90% DTS Authorization submission: 0% (CEW in progress, need to determine location) FMC rolling stock: 8/8 vehicles, TOC trailer currently deadlined awaiting re-instatement from NGB
71
RFIs/Issues RFIs Issues NA Need alternate venue for Emergent STX
72
Discussion & Alibis
73
Questions ? POC: M. Bridges, CTR G5 Plans & Exercises