Presentation is loading. Please wait.

Presentation is loading. Please wait.

Flood Protected Self-Verifying Cocoon™

Similar presentations


Presentation on theme: "Flood Protected Self-Verifying Cocoon™"— Presentation transcript:

1 Flood Protected Self-Verifying Cocoon™
GrainPro® Cocoon™ Flood Protected Self-Verifying Cocoon™ Doc. Code: TSD-PP005-1

2 INTRODUCTION COCOON : SELF-VERIFYING Material Flexible PVC Color White
Thickness 0.83 mm Weight 1,050 gsm Fabrication High frequency welding Sealing Zipper pulls Useful life 10-15 years OTR 500 (Max) cc/m2/day WVTR 8 + 1 g/m2/day Reusable/ Recyclable Yes

3 DESCRIPTION The GrainPro® Self Verifying Cocoon (S-VC) is a sealed flexible structure that is specifically designed to provide protection to dry agricultural commodities without the use of fumigants; It is made from a specially designed flexible polyvinyl chloride (PVC) with an airtight zipper system; It utilizes the principle of hermetic storage to prevent insect infestation during storage; The S-VC has sealed structures that enable insects and other aerobic organisms in the commodity, or the commodity itself, to create a modified atmosphere by reducing the O2 and increasing the CO2 concentrations; and The modification process often tries to lower the amount of O2, moving it from 20.9% to 0.1%, in order to slow down the growth of aerobic organisms and the speed of oxidation reactions.

4 1 2 3 PROCEDURES SITE SELECTION AND PREPARATION:
Choose a flat, elevated site for installation. For indoor installation, clean the area to remove sharp objects. 2 FOR OUTDOOR INSTALLATION: Prepare a 5-cm layer of fine sand (or equivalent) as ground foundation. 3 LAY-OUTING OF THE BOTTOM SECTION: Place one sack in every corner and stretch the bottom to prevent folds. Load the first layer of sacks in one direction.

5 4 5 6 REQUIRED STACK HEIGHT:
Keep the sacks stable by loading the succeeding layers in a crisscross manner. Continue piling until the desired Cocoon height is reached. 5 BAGGED LOADING (MECHANICAL): Stacking of grains involves diverse operations such as conveyor, forklift. 6 TOP LAYER (OUTDOOR): Put an extra layer of bags to serve as a slope or peak of the stack.

6 7 PREPARING TO ZIP: Engaging the zipper pull using left and right keys. Continue zipping until starting flap is reached again. 8 COMPLETING THE ZIPPER PROCESS: In case of mal-alignment, pull the upper and lower sections of the liner walls in opposite directions. 9 ENGAGING THE TENSION STRAPS: The tension straps positioned along the wall of the upper section must be inserted through their respective buckles.

7 10 11 12 RAISING THE COCOON WITH TENSION STRAPS:
The required tension can be achieved by attaching the cords to the buckles. 11 SETTING-UP THE GRAINSHADE: For outdoor installation, install poles and position the GrainShade™ at least 1m above the Cocoon. 12 PRESSURE DECAY TESTING: A commercially available or improvised U-tube manometer can be used to monitor the pressure to ensure gastightness.

8 13 14 15 OXYGEN MONITORING: Using oxygen analyzer.
REPAIRING PUNCTURES AND OTHER DAMAGES: Punctures, cuts, and holes should be patched immediately. 15 CLEANING THE BOTTOM AND TOP SECTIONS: Maybe cleaned with soap and water, when dry, folded, rolled up and place them in the carrying bag.

9 Visit Us THANK YOU


Download ppt "Flood Protected Self-Verifying Cocoon™"

Similar presentations


Ads by Google