HMA SPS Mandatory I/F Development

Similar presentations


Presentation on theme: "HMA SPS Mandatory I/F Development"— Presentation transcript:

1 HMA SPS Mandatory I/F Development
HMA-T Phase 2 Final Presentation 14-15 Dec 2009, ESRIN Reuben Wright, DEIMOS Space Philippe Merigot, SPOT Image Didier Giacobbo, SPOT Image Slide 1

2 Achievements Open Issues Demonstrations Future Work Deliverables
Software Development Open Issues Demonstrations Future Work Slide 2

3 Deliverables: Overview
Description Planned Delivery Actual Delivery SPS mandatory I/F Requirement Baseline (KO+1,5m) 07-018r3 v2 draft 04/02/09 SPS mandatory I/F Software Specification Document PM1 (KO+3m) V1.0 2/10/2008 V1.1 04/02/09 SPS mandatory I/F Software Design Document V1.0 6/10/2008 Software Validation Testing Specification of the SPS mandatory I/F PM2 (KO+5m) V1.0 04/02/09 Validated SPOT SPS mandatory I/F software N/A Validated DEIMOS SPS mandatory I/F software AR-1 (KO+7m) Available SPS mandatory I/F Validation Test Report Progress reports and management documentation - As requiedjhjh Description Planned Delivery Actual Delivery SPS mandatory I/F Requirement Baseline (KO+1,5m) 07-018r3 v2 draft 04/02/09 SPS mandatory I/F Software Specification Document PM1 (KO+3m) V1.0 2/10/2008 V1.1 04/02/09 SPS mandatory I/F Software Design Document V1.0 6/10/2008 Software Validation Testing Specification of the SPS mandatory I/F PM2 (KO+5m) V1.0 04/02/09 Validated SPOT SPS mandatory I/F software N/A Validated DEIMOS SPS mandatory I/F software AR-1 (KO+7m) 18/02/2009 SPS mandatory I/F Validation Test Report Progress reports and management documentation - Slide 3

4 Deliverables 1/2 OGC Sensor Planning Service Application Profile for EO Sensors v2.0 draft Based on SPS v2.0 sweCommon v2.0 (better and simpler use of sweCommon, only one level of recursivity) Tasking parameters reviewed Synchonous responses (result may be sent asynchronously) Notifications Slide 4

5 RIDs accepted in all documents and added to Wiki
Deliverables 2/2 Software Requirements Document, Architecture Design Document, Software Test Specification, Test Execution Records all completed RIDs accepted in all documents and added to Wiki Slide 5 5

6 SPS Library Software Development – 1/3
Release Candidate version delivered to Deimos on Oct 8th Readers and writers for SPS 2.0 requests and responses: GetCapabilities, DescribeTasking, GetFeasibility, Submit, GetStatus, DescribeResultAccess Helpers to handle Optical and SAR tasking parameters as well as corresponding feasibility study responses SPOT developed SPS library is open source Available on google code: Slide 6

7 SPOT SPS Interface software
Software Development – 2/3 SPOT SPS Interface software Uses SPS library Implementation of synchronous (polling GetStatus) and asynchronous (via notifications) SPS behaviors Connection to our prototype multi-mission feasibility server wrapped by the SPS interface Full simulation of acquisitions occurring after a Submit so that the interface can be tested thoroughly Notification server implemented according to the WS-Base-Notification standard from OASIS (based on the open source Apache Muse library) Server URL : Slide 7

8 Deimos SPS Interface software
Software Development – 3/3 Deimos SPS Interface software Uses the SPS library Uses the Earth Explorer CFI to simulate a radar mission planning system Tested using Web Service Explorer for detailed access to messages, and verification against reference data. Approach is a step towards formal automation of tests within CITE – Compliance & Interoperability Testing & Evaluation Initiative Deployed on Linux server, on top of Apache Tomcat and Axis 2 web service framework at ESRIN: Slide 8

9 None with HMA-T, but see “Future Work”
Open Issues None with HMA-T, but see “Future Work” Slide 9

10 Client : Space time toolkit
Demonstration Client : Space time toolkit Server : Scenario : Slide 10

11 Work remaining after HMA-T (and picked up in HMA-FO include):
Future Work Work remaining after HMA-T (and picked up in HMA-FO include): V2.0 Specification of the OpenGIS® Sensor Planning Service Application Profile for EO Sensors (OGC ) Alignment of the specification with the evolving OGC “SWECommon” and SPS 2.0 and new specification model (OGC r3) GetSensorAvailability and Validate operations Abstract Test Suite and Executable Test Suite Design, development, testing and documentation of an open source Sensor Feasibility Reference Environment Reference server and client to be used both for the testing and demonstration of the specification. Associated documentation following the tailored ECSS standards from the Statement Of Work. Slide 11