Presentation is loading. Please wait.

Presentation is loading. Please wait.

Planning Actual execution of maintenance & upgrade

Similar presentations


Presentation on theme: "Planning Actual execution of maintenance & upgrade"— Presentation transcript:

1 Planning Actual execution of maintenance & upgrade
Long-time planning of generating units maintenance and equipment replacement. 3-year planning of maintenance and replacement Annual planning of maintenance of auxiliary equipment Determination of works volume and MTP. Budgeting. Net graphs of generating units maintenance and upgrade execution Monthly scheduling and correction of work volumes Actual execution of maintenance & upgrade Scheduling of annual maintenance & upgrade activities Summary planning of materials needs.

2 Acting/monitoring Real-time production monitoring
Tracking deviation vs. regulations requirements (chemical parameters, vibrations etc.) Expert estimate of units starts and shut downs by historical and on-line trends

3 Acting/monitoring. Dashboard for manager

4 Acting/monitoring. Dashboard for manager
Net graphs of generating units maintenance and execution of upgrade projects Acting/monitoring. Dashboard for manager Project management system (Primavera) Maintenance projects. Projects for purchase of goods with long-time manufacturing cycle. Upgrade projects. Target production projects. Net graphs of routine maintenance of generating units.

5 Assessment of actual equipment technical conditions
Alanlysis Experts of production divisions estimate regularly actual equipment technical conditions and update long-term (till 2020) activities for continuous reliability improvement: Assessment of heat-mechanical components technical conditions Long-term activities for continuous reliability improvement till 2020 Considering in maintenance & upgrade plans Assessment of electrical components technical conditions Assessment of automated control systems technical conditions

6 Alanlysis resluts are used for planning of next year work scope
Drafting of works scope Alanlysis resluts are used for planning of next year work scope Alternatives by business process AERO Effectiveness calculation Branche’s works volume General maintenance Routine maintenance The best alternative Maintenance plan Part replacement Full replacement Upgrade plan Upgrade The best alternative


Download ppt "Planning Actual execution of maintenance & upgrade"

Similar presentations


Ads by Google