2
Instructions Be sure to place this presentation in Slide Show Mode if it is not already in that mode before proceeding The purpose of this drill is to help you improve your skill at finding answers to questions using the applicable fire codes and also to help increase your knowledge of the Fire Alarm codes. Each slide will contain a question. The question will remain in the screen for a period of 2 minutes. At the end of the two minutes, a notification will sound and the slide will transition to the next slide which will have the correct answer to the question. After 15 seconds the next question will appear and the process will continue. During the test do not worry about the correct answers when those slide appear. You will be given an opportunity to review the answers with out the time at the end of the test. Click on the slide to start the timer and begin the test
3
NFPA 72 In a protected premises, operation of a disconnect switch of the releasing agent suppression system or a disable function shall cause a supervisory signal at ________________. A. the releasing service fire alarm control unit B. at the local fire station C. at the central station only D. at the supervising station only
4
Answer A. NFPA
5
NFPA 72 Where shall signals from carbon monoxide detectors be indicated? A. the building blueprint B. the fire alarm control unit C. the local fire department D. the central monitoring station
6
answer B.
7
NEC What is the smallest single conductor that is permitted for use in power limited fire alarm systems. A. 18 AWG B. 20 AWG C. 24 AWG D. 26 AWG
8
answer A. 18 AWG
9
NFPA 72 In what devices may a Class A outgoing and return circuit conductor be permitted in the same cable assembly? A. circuits not to exceed 10 feet B. for heat detector circuits C. multiple raceway drops for individual devices D. single raceway drops for multiple devices
10
Answer A.
11
NFPA 72 According to NFAP 72, how often shall waterflow devices be tested? A. annually B. semiannually C. quarterly D. monthly
12
answer B. Semiannually T
13
OSHA According to OSHA, which electrical cord is safe to use?
A. one that is free of cuts B. one that is repaired in the field C. one with insufficient AWG capacity D. one without a grounding plug
14
Answer A. one that is free of cuts CFR 1926
15
NEC Cables installed under a corrugated metal roof deck must be located at least which minimum distance from the roof deck? A. .75 inches B inches C. 1.5 inches D. 2 inches
16
answer C. 1.5 inches 300.4 (E)
17
NFPA 72 A deficiency remains uncorrected at the conclusion of system maintenance. Who must be notified within 24 hours? A. AHJ B. owner C. monitoring company D. technicians immediate supervisor
18
Answer B. owner
19
NFPA 72 On a peaked ceiling, projected beam type smoke detectors must be installed within which maximum distance from the peak? A. 2 feet B. 3 feet C. 4 feet D. 5 feet
20
Answer B. 36”
21
Practical Application
Blueprint reading What is the rating of the fixed temperature heat detector as shown. A. 136 degrees F B. 150 degrees F C. 194 degrees F D. 220 degrees F
22
answer A. 136 degrees F Blueprint reading
23
General Knowledge When describing a pull station, what does the term “single action” mean? A. only one force or motion is required for activation B. only one station is installed on the circuit C. the station can only be used once; then it must be replaced D. the station requires lifting the cover for activation
24
answer A. only one force or motion is required for activation
General knowledge
25
Electrical Theory What are the voltage drops across R4, R3, R2 and R1 resistors as shown. A. 1.5, 1.5, 1.5, 1.5 B. 1.5, 1.5, 3.0, 1.5 C. 1.5, 1.5, 3.0, 3.0 D. 3.0, 1.5, 1.5, 1.5
26
Answer D. 3, 1.5, 1.5, 1.5 DC circuit analysis
27
NFPA 72 According to NFPA 72, a maximum of how many seconds shall elapse from the initiation of a single fire alarm signal on an active multiplex system until it is recorded at the central station? A. 15 B. 30 C. 60 D. 90
28
answer D. 90 seconds
29
NFPA 72 For initial acceptance tests, what percentage of newly installed smoke detectors and restorable heat detectors does NFPA require to be tested? A. 20% of smoke detectors; 10% of heat B. 50% of both devices C. 100% of smoke detectors; 205 of heat D. 100% of both
30
Answer D. 100% of both devices T
31
NFPA 72 During fire alarm system installation, the wiring paths for notification circuits were modified because of obstructions in the field. According to NFPA 72, which of the following shall be included in the as-built drawings? A. information on the type of obstructions B. photos of the path changes C. revised calculations showing any changes to installation conditions D. revised Record of Completion noting the obstructions
32
answer C. revised calculations showing any changes to installation conditions
33
NFPA 72 Where should the connections to the light and power service for a supervising station signaling system be located? A. ahead of the main disconnect B. on a dedicated branch circuit C. on a branch circuit that is fed by the emergency generator D. on a branch circuit that is loaded to no more than 80% of its rated capacity
34
Answer B. on a dedicated branch circuit
35
NFPA 72 According to NFPA 72, what are the height requirements for the operable part of the box when securely mounting a manual fire alarm box above the floor level? A. not less than 3-1/2 feet, and not more than 4 feet B. not less than 4 feet, and not more than 5 feet C. not less than 4-1/2 feet, and not more than 5-1/2 feet D. not less than 5 feet, and not more than 6 feet
36
answer A. not less than 3-1/2 feet, and not more than 4 feet
37
NFPA 72 Records of completed tests and operations shall be kept for how long? A. as determined by the owner B. until the next test and a period of 1 year thereafter C. until the next test is performed D. until notified by the AHJ
38
Answer B. until the next test and a period of 1 year thereafter
39
NFPA 72 For a new fire alarm system, who is responsible for completing the Record of Completion? A. AHJ B. installing contractor C. local fire department D. system designer
40
answer B. installing contractor
41
NFPA 72 Access to the supervising station of a proprietary supervising station system shall be restricted to which group of people? A. directly concerned with the implementation and direction of emergency action initiation and procedure B. required by the chief of the public fire department to be present in an emergency’ C. who have demonstrated their trustworthiness in handling difficult emergency situations D. with a class 4 security clearance
42
Answer A. directly concerned with the implementation and direction of emergency action initiation and procedure
43
NEC Which type of cable must be used on fire alarm system risers from floor to floor? A. CMR B. FPL C. FPLR D. Plenum
44
answer C. FPLR (F)
45
NFPA 72 Before system maintenance or testing of an installed fire alarm system, which of the following options shall be provided to the service personnel upon request? A. AHJ contact information B. installation contractor’s license C. keys to all of the rooms for access D. wiring diagrams
46
Answer D. wiring diagrams 14.2.5
47
NEC Lead acid batteries at a central station shall be visually inspected at which interval? A. daily B. weekly C. monthly D. annually
48
answer C. monthly T14.3.1
49
General Construction Knowledge
Who is responsible for prioritizing the construction schedule? A. architect B. general contractor C. owner D. subcontractor
50
Answer B. general contractor General Knowledge
51
Practical Application
A technician is installing a fire alarm system that has several duct smoke detectors for control of fire/smoke dampers. The fire alarm shop drawings only indicate a general location for each of the fire/smoke dampers. Where can the technician go to find the precise location of the dampers for proper installation of the duct smoke detectors? A. electrical drawings B. job specifications C. mechanical floor plan D. scope of work
52
answer C. mechanical drawings Practical Application
53
NFPA 72 According to NFPA 72, which type of information may be omitted on a shop drawing? A. directional arrow pointing north B. name of installer or contractor C. location of protected premises D. name of a protected premises, owner and occupant
54
Answer A. directional arrow pointing north 7.4.4
55
NFPA 72 The fire alarm installer’s name shall be included on which of the following documentation? A. control unit drawings B. floor plan drawings C. shop drawings D. system riser diagrams
56
answer C. shop drawings 7.4.4
57
Practical Application
What is the term used when referring to the difference between the operating temperature of the device and the actual air temperature? A. activation time B. operating point C. thermal lag D. time constant
58
Answer C. thermal lag General Knowledge
59
NFPA 72 Which two of the following options indicate the proper handling of software-based systems requiring a copy of the site-specific software? (Choose two.) A. modified to include the latest changes provided to the AHJ B. provided and maintained by the service company C. provided to the owner or the owner’s designated representative D. stored on-site in a nonvolatile, nonerasable, and nonrewriteable memory
60
answer C. provided to the owner or the owner’s designated representative D. stored on-site in a nonvolatile, nonerasable, and nonrewriteable memory and
61
NFPA 72 For a new system record documentation shall be stored in the document cabinet. Who determines the level of security for system’s documentation? A. installing contractor B. local fire department C. NFPA D. stakeholders
62
Answer D. stakeholders
63
General Knowledge Which three resource restraints contribute to the difficulty in managing projects? (Choose three.) A. lack of available on site workers B. lack of prolonged overtime C. lack of properly trained on site supervision D. lack of skilled workers
64
answer General Knowledge A. lack of available on site workers
C. lack of properly trained on site supervision D. lack of skilled workers General Knowledge
65
NFPA 72 and Practical Application
A new building has an elevator with 9 stops. How many elevator lobby smoke detectors must be tested to verify designated level recall? A. 0 B. 1 C. 8 D. 9
66
Answer C. 9 Every floor lobby except the one being tested and each floor would have to be tested. So 9 lobbies
67
Safety According to OSHA, safety data sheets (SDS) shall include which of the following identification information? A. cost of material B. date of SDS printout C. emergency phone number of manufacturer or importer D. first-aid instructions for exposure
68
answer C. emergency phone number of manufacturer or importer Safety
69
NFPA 72 and Practical Application
While waiting for equipment to arrive to repair an operational fire alarm system, the owner requests that the technician disable the audible alarm at the control unit. The technician explains that this is against code requirements. NFPA 72 requires the control unit to reactivate at a minimum of which frequency? A. once a week B. once every 24 hours C. one every 48 hours D. once every 72 hours
70
Answer B. once every 24 hours
71
END of QUIz. THE TIME WILL STOP NOW
END of QUIz. THE TIME WILL STOP NOW. PLEASE CLICK ON THE SLIDE TO CONTINUE WITHOUT THE TIMER AND REVIEW EACH QUESTION.
72
NFPA 72 In a protected premises, operation of a disconnect switch of the releasing agent suppression system or a disable function shall cause a supervisory signal at ________________. A. the releasing service fire alarm control unit B. at the local fire station C. at the central station only D. at the supervising station only
73
Answer A. NFPA
74
NFPA 72 Where shall signals from carbon monoxide detectors be indicated? A. the building blueprint B. the fire alarm control unit C. the local fire department D. the central monitoring station
75
answer B.
76
NEC What is the smallest single conductor that is permitted for use in power limited fire alarm systems. A. 18 AWG B. 20 AWG C. 24 AWG D. 26 AWG
77
answer A. 18 AWG
78
NFPA 72 In what devices may a Class A outgoing and return circuit conductor be permitted in the same cable assembly? A. circuits not to exceed 10 feet B. for heat detector circuits C. multiple raceway drops for individual devices D. single raceway drops for multiple devices
79
Answer A.
80
NFPA 72 According to NFAP 72, how often shall waterflow devices be tested? A. annually B. semiannually C. quarterly D. monthly
81
answer B. Semiannually T
82
OSHA According to OSHA, which electrical cord is safe to use?
A. one that is free of cuts B. one that is repaired in the field C. one with insufficient AWG capacity D. one without a grounding plug
83
Answer A. one that is free of cuts CFR 1926
84
NEC Cables installed under a corrugated metal roof deck must be located at least which minimum distance from the roof deck? A. .75 inches B inches C. 1.5 inches D. 2 inches
85
answer C. 1.5 inches 300.4 (E)
86
NFPA 72 A deficiency remains uncorrected at the conclusion of system maintenance. Who must be notified within 24 hours? A. AHJ B. owner C. monitoring company D. technicians immediate supervisor
87
Answer B. owner
88
NFPA 72 On a peaked ceiling, projected beam type smoke detectors must be installed within which maximum distance from the peak? A. 2 feet B. 3 feet C. 4 feet D. 5 feet
89
Answer B. 36”
90
Practical Application
Blueprint reading What is the rating of the fixed temperature heat detector as shown. A. 136 degrees F B. 150 degrees F C. 194 degrees F D. 220 degrees F
91
answer A. 136 degrees F Blueprint reading
92
General Knowledge When describing a pull station, what does the term “single action” mean? A. only one force or motion is required for activation B. only one station is installed on the circuit C. the station can only be used once; then it must be replaced D. the station requires lifting the cover for activation
93
answer A. only one force or motion is required for activation
General knowledge
94
Electrical Theory What are the voltage drops across R4, R3, R2 and R1 resistors as shown. A. 1.5, 1.5, 1.5, 1.5 B. 1.5, 1.5, 3.0, 1.5 C. 1.5, 1.5, 3.0, 3.0 D. 3.0, 1.5, 1.5, 1.5
95
Answer D. 3, 1.5, 1.5, 1.5 DC circuit analysis
96
NFPA 72 According to NFPA 72, a maximum of how many seconds shall elapse from the initiation of a single fire alarm signal on an active multiplex system until it is recorded at the central station? A. 15 B. 30 C. 60 D. 90
97
answer D. 90 seconds
98
NFPA 72 For initial acceptance tests, what percentage of newly installed smoke detectors and restorable heat detectors does NFPA require to be tested? A. 20% of smoke detectors; 10% of heat B. 50% of both devices C. 100% of smoke detectors; 205 of heat D. 100% of both
99
Answer D. 100% of both devices T
100
NFPA 72 During fire alarm system installation, the wiring paths for notification circuits were modified because of obstructions in the field. According to NFPA 72, which of the following shall be included in the as-built drawings? A. information on the type of obstructions B. photos of the path changes C. revised calculations showing any changes to installation conditions D. revised Record of Completion noting the obstructions
101
answer C. revised calculations showing any changes to installation conditions
102
NFPA 72 Where should the connections to the light and power service for a supervising station signaling system be located? A. ahead of the main disconnect B. on a dedicated branch circuit C. on a branch circuit that is fed by the emergency generator D. on a branch circuit that is loaded to no more than 80% of its rated capacity
103
Answer B. on a dedicated branch circuit
104
NFPA 72 According to NFPA 72, what are the height requirements for the operable part of the box when securely mounting a manual fire alarm box above the floor level? A. not less than 3-1/2 feet, and not more than 4 feet B. not less than 4 feet, and not more than 5 feet C. not less than 4-1/2 feet, and not more than 5-1/2 feet D. not less than 5 feet, and not more than 6 feet
105
answer A. not less than 3-1/2 feet, and not more than 4 feet
106
NFPA 72 Records of completed tests and operations shall be kept for how long? A. as determined by the owner B. until the next test and a period of 1 year thereafter C. until the next test is performed D. until notified by the AHJ
107
Answer B. until the next test and a period of 1 year thereafter
108
NFPA 72 For a new fire alarm system, who is responsible for completing the Record of Completion? A. AHJ B. installing contractor C. local fire department D. system designer
109
answer B. installing contractor
110
NFPA 72 Access to the supervising station of a proprietary supervising station system shall be restricted to which group of people? A. directly concerned with the implementation and direction of emergency action initiation and procedure B. required by the chief of the public fire department to be present in an emergency’ C. who have demonstrated their trustworthiness in handling difficult emergency situations D. with a class 4 security clearance
111
Answer A. directly concerned with the implementation and direction of emergency action initiation and procedure
112
NEC Which type of cable must be used on fire alarm system risers from floor to floor? A. CMR B. FPL C. FPLR D. Plenum
113
answer C. FPLR (F)
114
NFPA 72 Before system maintenance or testing of an installed fire alarm system, which of the following options shall be provided to the service personnel upon request? A. AHJ contact information B. installation contractor’s license C. keys to all of the rooms for access D. wiring diagrams
115
Answer D. wiring diagrams 14.2.5
116
NEC Lead acid batteries at a central station shall be visually inspected at which interval? A. daily B. weekly C. monthly D. annually
117
answer C. monthly T14.3.1
118
General Construction Knowledge
Who is responsible for prioritizing the construction schedule? A. architect B. general contractor C. owner D. subcontractor
119
Answer B. general contractor General Knowledge
120
Practical Application
A technician is installing a fire alarm system that has several duct smoke detectors for control of fire/smoke dampers. The fire alarm shop drawings only indicate a general location for each of the fire/smoke dampers. Where can the technician go to find the precise location of the dampers for proper installation of the duct smoke detectors? A. electrical drawings B. job specifications C. mechanical floor plan D. scope of work
121
answer C. mechanical drawings Practical Application
122
NFPA 72 According to NFPA 72, which type of information may be omitted on a shop drawing? A. directional arrow pointing north B. name of installer or contractor C. location of protected premises D. name of a protected premises, owner and occupant
123
Answer A. directional arrow pointing north 7.4.4
124
NFPA 72 The fire alarm installer’s name shall be included on which of the following documentation? A. control unit drawings B. floor plan drawings C. shop drawings D. system riser diagrams
125
answer C. shop drawings 7.4.4
126
Practical Application
What is the term used when referring to the difference between the operating temperature of the device and the actual air temperature? A. activation time B. operating point C. thermal lag D. time constant
127
Answer C. thermal lag General Knowledge
128
NFPA 72 Which two of the following options indicate the proper handling of software-based systems requiring a copy of the site-specific software? (Choose two.) A. modified to include the latest changes provided to the AHJ B. provided and maintained by the service company C. provided to the owner or the owner’s designated representative D. stored on-site in a nonvolatile, nonerasable, and nonrewriteable memory
129
answer C. provided to the owner or the owner’s designated representative D. stored on-site in a nonvolatile, nonerasable, and nonrewriteable memory and
130
NFPA 72 For a new system record documentation shall be stored in the document cabinet. Who determines the level of security for system’s documentation? A. installing contractor B. local fire department C. NFPA D. stakeholders
131
Answer D. stakeholders
132
General Knowledge Which three resource restraints contribute to the difficulty in managing projects? (Choose three.) A. lack of available on site workers B. lack of prolonged overtime C. lack of properly trained on site supervision D. lack of skilled workers
133
answer General Knowledge A. lack of available on site workers
C. lack of properly trained on site supervision D. lack of skilled workers General Knowledge
134
NFPA 72 and Practical Application
A new building has an elevator with 9 stops. How many elevator lobby smoke detectors must be tested to verify designated level recall? A. 0 B. 1 C. 8 D. 9
135
Answer C. 9 Every floor lobby except the one being tested and each floor would have to be tested. So 9 lobbies
136
Safety According to OSHA, safety data sheets (SDS) shall include which of the following identification information? A. cost of material B. date of SDS printout C. emergency phone number of manufacturer or importer D. first-aid instructions for exposure
137
answer C. emergency phone number of manufacturer or importer Safety
138
NFPA 72 and Practical Application
While waiting for equipment to arrive to repair an operational fire alarm system, the owner requests that the technician disable the audible alarm at the control unit. The technician explains that this is against code requirements. NFPA 72 requires the control unit to reactivate at a minimum of which frequency? A. once a week B. once every 24 hours C. one every 48 hours D. once every 72 hours
139
Answer B. once every 24 hours