Download presentation
Presentation is loading. Please wait.
1
ELENA Technical Coordination
Status of the AD extension building and layout of the future experimental areas F. BUTIN / ELENA collaboration
2
F. BUTIN / ELENA collaboration
AD hall extension 570 m2 AD hall extension F. BUTIN / ELENA collaboration Sketch: A. Kosmicki
3
Seen from inside AD hall
New building details Seen from inside AD hall F. BUTIN / ELENA collaboration Sketch: A. Kosmicki
4
Internal disposition Kickers 12.7 x 14.7 m2 Storage (5 x 9 m2)
Porte 2,5x 3m2 Internal disposition Storage (7x2 m2) Kickers 12.7 x 14.7 m2 Storage (14x2 m2) Storage (7x4 m2) Storage (5 x 9 m2) Workshop (5 x 10 m2) Offloading area (8x4.6 m2) Storage (7x4 m2) Magnetic horns test bench (10 x 7 m2) Test bench 7 x 10 m2 Porte 6x 6 m2 F. BUTIN / ELENA collaboration
5
F. BUTIN / ELENA collaboration
Provisional planning F. BUTIN / ELENA collaboration
6
How to split the challenge
SHOWN IN FEB 12 Four main directions of work: Plan to relocate the existing workshop, kickers and experiments devices into a new building Confirm space usage for ELENA (magnetic measurements, shielding, H+ or H- source) Plan circulation, access, space for racks etc Anticipate on future possible experimental areas F. BUTIN / ELENA collaboration
7
How to split the challenge
Four main directions of work: Plan to relocate the existing workshop, kickers and experiments devices into a new building Confirm space usage for ELENA (magnetic measurements, shielding, H+ or H- source) Plan circulation, access, space for racks and services etc Anticipate on future possible experimental areas F. BUTIN / ELENA collaboration
8
F. BUTIN / ELENA collaboration
Integration Magnetic measurements showed that the existing situation should not cause problems Start design of machine supports in August, with non magnetic material (aluminium) More data has become available for H+/- source, allowing to work on integration Plan relocation of existing racks and start inventory of new racks needed F. BUTIN / ELENA collaboration
9
F. BUTIN / ELENA collaboration
Current layout Holding points: Design of injection line: define exact position Design of ejection line towards existing experiments Sketch: S. Maridor F. BUTIN / ELENA collaboration
10
How to split the challenge
Four main directions of work: Plan to relocate the existing workshop, kickers and experiments devices into a new building Confirm space usage for ELENA (magnetic measurements, shielding, H+ or H- source) Plan circulation, access, space for racks and services etc Anticipate on future possible experimental areas F. BUTIN / ELENA collaboration
11
Integration inside AD hall
Re-start integration of GBar Sketch: O. Choisnet F. BUTIN / ELENA collaboration
12
Anticipate on future experimental areas
A number of candidates for future experimental zones 1 GBar 2 F. BUTIN / ELENA collaboration
13
Anticipate on future experimental areas
1 2 GBar F. BUTIN / ELENA collaboration
14
On the project management side
Two main documents in preparation: ELENA Quality assurance plan and project organization Naming conventions for the layout of ELENA F. BUTIN / ELENA collaboration
15
F. BUTIN / ELENA collaboration
Conclusions A major step forward was taken with the approval of the multipurpose AD extension building and Gbar experiment General ELENA planning redefined accordingly Based on this, and on a solid layout definition of the machine and transfer lines, we can progress on overall integration of experimental areas, shielding, accesses, services, etc… In parallel, the project management structure is being developed F. BUTIN / ELENA collaboration
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.