1 2017 Proposed Capital Budget

2 *Ranked Numerically by Importance Within Category*
Rating System A - Safety Issue / Essential B - Best Practice / Need to Maintain Current Level of Service C - Recommend Upgrade to Service And/or Improve Productivity D - Capital Suggestions Not Ready to Implement at this Time *Ranked Numerically by Importance Within Category*

3 2017 Administration Capital Projects
Building Renovations Domain Server Wide Format Scanner/Printer Desk Top Computer Set Ups (12) Microsoft Office (22)

4 Building Renovations Rating : A1
Includes : Movement of Administration From Current Location to Upstairs. Justification : In an Effort to Get the Police Station Accredited, Administration Must Relocated in Order to Free Up Space. 2017 Cost : $1,000,000

5 Domain - Server Rating : B1
Includes : New Server for Administration/Police Department Justification : Need to Have an Up-To-Date Server in Order to Work Efficiently & Safely. 2017 Cost : $17,000

6 Wide Format Scanner/Printer
Rating : B-2 Includes : Wide Format Scanner/Printer Capable of Scanning Property Files and Plans. Justification : Township Currently Lacks Adequate Storage For These Types of Plans/Files. 2017 Cost : $9,400

7 12 Desktop Computer Setups
Rating : B-3 Includes : Computer Towers, Monitors, Mouse and Keyboards Justification : Current Computers are Quickly Becoming Outdated. Each Computer Currently Has Different Performance Capabilities. 2017 Cost : $10,765

8 (22) Microsoft Office Rating : B-4
Includes : Microsoft Office For ALL Computers Located Throughout the Township Building Justification : Current Computers Have Different Versions of Microsoft Office Making Work Susceptible to Error. 2017 Cost : $6,736

9 2018-2021 Administration Capital Needs
Administration Building Renovations - $4 Million 2019 Postage Meter - $3,533 Administration Building Renovations - $5 Million 2020 Admin Scan Server - $19,040 2021 Desktop Scanners Replacement - $6,916 Large Color Copier - $27,416 Small Black and White Copier - $2,967 Security Server - $9,200

10 2017 Public Works Capital Projects
Perform Traffic Signal Upgrades Sign Replacement Program New Ford F550 Replaces Old 2004 Ford F550 (Truck #10) Survey Work of Township Properties Greer Park Playground Replacement Program 18” Wood Chipper Bobcat 3650 with Comb/Broom and Plow Attachments Safety Equipment for Road Work

11 Perform Traffic Signal Upgrades
Rating : A -1 Includes : 2 Battery Backups, 3 Generator Capacity Upgrades Justification : Traffic Signals Become Inoperable During Power Outages Part of 6 Year Program 2017 Cost : $15,000 Overall Cost : $69,000

12 Sign Replacement Program
Rating : A-2 Includes : Full Replacement of Street Signage in Precinct 4 Justification : Federal Highway Administration Requires Street Signage to Maintain Minimum Level of Retroreflectivity. Part of 6 Year Program 2017 Cost : $14,000 Overall Cost : $70,000

13 Ford F550 Rating : B-2 Includes : Stainless Steel Dump Body, Plow and Salt Spreader Justification : Current 2004 Ford F550 is Nearing End of Life Due to Age and Regular Wear and Tear. 2017 Cost : $85,000

14 Road Work Safety Equipment
Rating : B-3 Includes : Arrow Board, 10 Barricades and 50 Traffic Cones Justification : This Will Increase Safety For Public Works Employees While Performing Road Work. 2017 Cost : $10,000

15 18” Wood Chipper Rating : C-2 Includes : Bandit 18” Wood Chipper
Justification : Presently Public Works Does Not Own a Wood Chipper and Rents One. Yard Waste Collections and Tree Maintenance Needs Have Grown. DEP is Furthering Mandating Yard Waste Collection Regulations. Increase Use With Emerald Ash Borer Response. 2017 Cost : $67,600

16 Bobcat 3560 Rating : C-3 Includes : Bobcat 3560 Fitted With Comb/Broom & Plow Blade Justification : Kronum League Was Responsible for Maintaining Turf Field at Gable Park. Township Will Need This Equipment If Kronum Does Not Renew Agreement. 2017 Cost : $27,000

17 Greer Park Playground Equipment
Rating :D-1 Includes : Base Activity and Play Set That Will be Built Upon in Future Years Justification : Greer Park Playground Equipment was Taken Down in This is Phase 1 of 3 To Rebuild Playground Equipment. 2017 Cost : $25,000

18 Survey of Township Property
Rating : D-3 Includes : A Comprehensive Survey of Township Properties. Justification : Important When Determining Responsibility for Items Such as Tree Care and Property Maintenance 2017 Cost : $7,500

19 Road Program Justification: Newtown Currently maintains Miles of Roadway. State Liquid Fuels Money (approximately $330,000) is Estimated to Only Cover 50% of Costs Based on Current Conditions. 2017 Cost – $100,000 General Fund Addition to State Liquid Fuels Money.

20 2018 Public Works Capital Needs
Perform Traffic Signal Upgrades - $15,000 Street Sign Replacement Program (Precinct 1) - $14,000 Greer Park Playground Equipment (2 of 3) - $25,000 Brine Tank for Mack Truck - $ 30,000 Replace Case Backhoe - $96,151 Equipment Trailer for Road Patching Equipment - $50,000 Expand Road Program – $150,000

21 2019 Public Works Capital Needs
Perform Traffic Signal Upgrades - $18,000 Street Sign Replacement Program (Precinct 8) - $14,000 Bobcat Compact Truck Loader - $75,000 Leeboy Model 1000 G Paving Machine - $78,100 Roller For Road Patching - $40,000 Leaf Machine - $23,260 Greer Park Playground Equipment (3 of 3) - $25,000 Expand Road Program - $200,000

22 2020 Public Works Capital Needs
Perform Traffic Signal Upgrades - $18,000 Street Sign Replacement (Precinct 5) - $14,000 Replace Ford F550 - $90,000 Install Bleachers at Brookside Park- $13,400 Install Bleachers at Gable Field - $ 13,400 Expand Road Program – $250,000

23 2021 Public Works Capital Needs
Replace Battery Backup At Traffic Signals- $3,000 Sign Replacement (State Roads & Misc.) - $14,000 Replace Mack Dump Truck - $150,000 Replace Case Loader $150,000 Expand Road Program - $300,000

24 Capital Items for Discussion
Install ½ Mile of Fence Along Trials - $39,000 Pave Goshen Trail - $138,000 Pave Bishop Hollow Trail - $138,000 Restore Ball field at Brookside Park - $35,000 Repair Dam # 1 At Drexel Lodge Park - $110,000 Repair Dam # 2 At Drexel Lodge Park - $110,000 Repair Damn At Greer Park – TBD Dredge Estimate - $148,400

25 Capital Items for Discussion Cont.
Trash and Recycling Systems at Parks - $15,000 Emerald Ash Borer Response – TBD Paper Mill House Pedestrian Bridge – TBD Install New Portion of Goshen Trail – TBD Traffic Calming Measures - TBD

26 2017 Police Capital Projects
2 New Police Patrol Vehicles Power DMS Software

27 2 Police Patrol Vehicles
Rating : A-1 & A-2 Includes : Ford Interceptor Utility Patrol Vehicles with Police Upgrades Justification : Current Vehicles Need to be Replaced Due to Age and Wear and Tear 2016 Cost : $40,500 Each

28 Power DMS Software Rating : C-1
Includes : Software Capable of Storage, Training, and Providing Guidance Though Accreditation. Justification : Police Station is Currently Not Accredited. Software will Aid in the Process of Achieving Accreditation. 2016 Cost : $4,125

29 Police Capital Needs 2018 2 Replacement Ford Interceptor Utility Patrol Vehicles Alert SQL Server - $18,020 2019 Scan Server - $18,530 2020 2021 Camera Server - $9,200

30


Download ppt "2017 Proposed Capital Budget"