Download presentation
Presentation is loading. Please wait.
1
Overview of LBDS related tasks
Viliam Senaj, 09/02/2017
2
MKD related items B1: B2: 13 generators OK; still to be fixed:
A, B, C, D, L, N, O – OK M – cleaning necessary 7 generators still to be tested and cleaned if necessary (~ 2 weeks) Cooling in UA off (27 deg) – HV test impossible; working in clean room clothes = sauna….. HV test possible if MKD temperature set point increased to 31 deg Request to consign for ~ 1 week – from Monday 13/02 Optimistic estimation - ~ 2 weeks needed (testing and cleaning if temperature OK) B2: 13 generators OK; still to be fixed: G – stack A, replaced; inspection to be done and retested B – stack A inspected and cleaned; to be tested MKD/B2 consigned on request of CB + cabling UA condition degraded – 27 deg + dust (cabling ongoing) Opening of generators for cleaning not compatible with pulling cables above or in vicinity (dust flying)…
3
MKB related items B1 - 4 MKBH inspected top compartment; bottom to be inspected and tested B2 – all MKBH to be inspected and tested Inspection to be done in absence of cabling work Temperature is less critical for testing (no interlock) but still unpleasant for working in clean room clothes… Optimistic estimation – 6 working days of for 3 people (inspection + testing)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.