1
Macondo: BP MC 252 A-1
2
BP MACONDO WELL
3
Conclusion: 252 #A-1 should encounter well known geological conditions
Same age rocks & pressures Geology Trend Conclusion: 252 #A-1 should encounter well known geological conditions What else does this map tell us?
4
The Crust Under the Gulf of Mexico
Is drilling of MC 252 on the frontier of engineering technology? Oceanic Crust If any part of gray area is melted during future mountain building, a basalt rock will be created.
5
Land Is drilling of MC 252 on the frontier of engineering technology?
Lower Cretaceous Edwards Limestone reef trend Land Austin
6
252 #A-1 just another of numerous deep water oil and gas fields
7
The geologic model: columnar salt dome
8
The Pre-drilling Model
Salt Dome Knobs on the Ocean Floor The Pre-drilling Model
9
The geologic model: columnar salt dome
Water Pre-drilling seismic subsurface image Salt Dome Gas Oil
10
Pre-drilling seismic subsurface image
Salt Oil reservoir objectives A Closer Look
11
Salt Possible over pressure
12
Reading a Wire Line Electrical Log
9 5/8“csg Moderate over pressure 7” csg Reading a Wire Line Electrical Log
13
Reading a Wire Line Electrical Log
Sandstone (reservoir) Shale non-reservoir Water Oil & Gas Formation pressure increasing to the right
14
Drilling & Completing the Well
Thick Objective Reservoirs Oil MTD 18340’
15
9 5/8” csg Drilling the Well Drill hole Drill Pipe Drilling mud
16
Completing the Well 9 5/8” pipe cemented to drill hole
Drilling the hole below 9 5/8” Drill hole Drill String Running 7” pipe Drilling mud Cementing 7” pipe
17
Completing the Well Heavy mud replaced by light sea water Heavy
Drilling mud Light Sea Water Heavy mud replaced by light sea water Cement failed
18
Drilling Ship Sea level Blow-out preventer failed Shear rams failed Blow-out preventer Ocean bottom 7 “ pipe Sandstones and Shales
20
18340’ TD