Download presentation
Presentation is loading. Please wait.
Published byPatricia Wood Modified over 6 years ago
1
NA61 news and plans News from other labs/experiments
Collaboration meeting, Cern, June 6-10, 2011 News from other labs/experiments Progress since the last collaboration meeting (October 2010) News on data taking in 2011+
2
News from other labs/experiments
Earthquake in Japan stops data taking by T2K for about one year, Significant effort to analyze already taken data. Pierre Auger Collaboration decided not to construct the Pierre Auger North Observatory. Results for RHIC and LHC confirm the NA49 data and interpretation on the onset of deconfinement.
3
The horn The step Confirmation of the importance of the NA61 ion program
4
Progress since the last collaboration meeting
First ion beams in NA61! (Nov/Dec 2010) O N C B at 13A GeV/c Be Li He
5
Progress since the last collaboration meeting
Test of secondary light ion beams (Nov. 22 – Dec. 6, 2010) NA61/CERN status report: SPSC The Z-detector prototype did not work, new design is under preparation
6
Secondary ion beam Z2 spectra at 13A GeV/c
The H2 beam line The H2 fragment separator
7
PSD construction close to completion
Electronics for full PSD ( (spare) sets) is ready and tested, 32 sets have been installed in existing 32 modules. The next beam test takes place this week.
8
He beam pipe installed and tested in
VTPC-1 and VTPC-2 The beam test takes place this week.
9
He tube ready for installation
PSD
10
Software upgrade Proposal for the NA61 software upgrade was recommended by the CERN PH-SFT committee (Feb. 10, 2011), and the requested support was approved by the CERN Directorate The core group worked at CERN in March-April 2011
11
Good progress on Virtualization Data base and bookkeeping
12
Calibration moving towards the end of the 2009 data calibration,
first dE/dx and ToF calibrations, No major problems, but still many things to do ... in spite of well organized effort of many of us
13
Analysis Paper on pion production in p+C at 31 GeV/c passed the CERN review, it is submitted to arXiv: and PRC, the revised draft is in preparation Preliminary results on: - K+ spectra and - y-pt spectra of negatively charged pions In p+C interactions at 31 GeV/c are released
14
First look at the calibrated 2009 data
impressed by high statistics
15
Welcome in NA61! Three new institutions joined us
University of Belgrade University of Wroclaw University of Nova Gorica Welcome in NA61!
16
News on data taking in 2011+ 1) TEST: canceled, but now several days this week We will ask for a parasitic running a week before physics with proton beams 2) PHYSICS: from July 29, 8:00 to September 19, 8:00 14 days p+p at 13 GeV/c 35 days p+p at 158 GeV/c 4 days p+Pb at 158 GeV/c 3) TEST+PHYSICS: from November 7, 8:00 to December 7, 8:00 10 days Be+Be at GeV/c 10 days Be+Be at GeV/c 10 days Be+Be at GeV/c
17
NA61 protons NA61 ions
18
2012+ LHC will run in 2012 A long (15+ months) LHC shutdown is planned in 2013+ It is under discussion when the shutdown will start and whether during the whole LHC shutdown period the SPS will also be closed
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.