Presentation is loading. Please wait.

Presentation is loading. Please wait.

IMPACT OF ADVANCED COMPLETIONS ON RESERVOIR AND PRODUCTION PERFORMANCE

Similar presentations


Presentation on theme: "IMPACT OF ADVANCED COMPLETIONS ON RESERVOIR AND PRODUCTION PERFORMANCE"— Presentation transcript:

1 IMPACT OF ADVANCED COMPLETIONS ON RESERVOIR AND PRODUCTION PERFORMANCE
S. Betancourt, R. van Delden, C. Lucas, Y. Jalali, J. Algeroy Schlumberger Completion Technologies

2 AGENDA Commingled Production Applications Improved Reservoir Drainage
8/28/2018 AGENDA Commingled Production Applications Case study 1 - North Sea Case study 2 - Wytch Farm Case study 3 - Oseberg Case study 4 - Troll Improved Reservoir Drainage Conclusions

3 8/28/2018 Case Study 1 - North Sea TRFC-H FloWatcher TRFC-H

4 Pressure and Water Production Performance
8/28/2018 Pressure and Water Production Performance

5 Oil Production Performance
8/28/2018 Oil Production Performance

6 Wytch Farm (Water Control)
8/28/2018 Wytch Farm (Water Control) Qo 16000 14000 12000 10000 8000 6000 4000 2000 Time (Days) commingled w/ control commingled w/o control sequential Multi-position Flow Control Valves

7 Oseberg (Gas Control) Production, m3/d commingled w/ control
8/28/2018 Oseberg (Gas Control) Production, m3/d GOC WOC commingled w/ control sequential production Time, days

8 Troll (Natural Gas Lift)
8/28/2018 Oil Production (bpd)

9 Coning in Horizontal Wells
8/28/2018 Coning in Horizontal Wells gas pressure flowrate oil heel toe water

10 Coning in Horizontal Wells
8/28/2018 Coning in Horizontal Wells Water Drive Gascap Drive Dual Drive Multiple Well (top view) *Yeten et al (SPE 68077, Bahrain) & Sinha et al (SPE 68635, Jakarta)

11 Completion with Downhole Flow Control
8/28/2018 Completion with Downhole Flow Control Downhole Flow Control DPmax(along the well)-5.6 psia Maximum Drawdown- 7.3psia Conventional Completion DPf (Toe to Heel)-34.5 psia Maximum Drawdown psia

12 Improved Drainage Applications
8/28/2018 Improved Drainage Applications *Yeten et al (SPE 68077, Bahrain) & Sinha et al (SPE 68635, Jakarta)

13 8/28/2018 CONCLUSIONS Advanced Completions in commingled production applications can: accelerate production, control GOR and watercut. Drainage in reservoirs with coning tendencies can be improved by delaying breakthrough time, and improving sweep. Also beneficial in field development.


Download ppt "IMPACT OF ADVANCED COMPLETIONS ON RESERVOIR AND PRODUCTION PERFORMANCE"

Similar presentations


Ads by Google