Download presentation
Presentation is loading. Please wait.
Published byClement Jeffrey Preston Modified over 6 years ago
1
3.5 Analyse an existing multi-unit production process AS 90677
2
One that is commercially operating with in-puts and outputs - yields
3
4 Steps Identify a multi-unit production process
Describe through analysis the influences on the key stages What are the impacts on key stakeholders during the productions development and continuance What are the impacts on the environment during the productions development and continuance
4
Key Stages Often seen as a flow chart
Include labour and quality control
5
Influences Inputs- outputs
Purpose of operations – storage, transport, delay, inspection, transformation operations Inventory management systems Accessibility of raw materials Labour Transport Power demands Social
6
Inputs continued Key operating variables – temperature, linear measurement, volume Sub-setting for sequential and parallel operations Use of flow sheet Moral Legal responsibilities eg workers Environment Local/national demands
7
Stakeholders People directly implicated in the production Owners
Workers Suppliers of key resources Immediate environment
8
Wider stakeholders Those who are or may be indirectly implicated in the production process
9
Impacts could be… Lifestyle change Changes to the environment
Health issues Economic Cultural Political impacts
10
Achievement with Excellence
Two or more existing multi-unit production processes Compare and contrast Identify and discuss influences on key stages Discuss how the development and continuance impact differently on key and wider community stakeholders and environment in terms of sustainability and management
11
Asking the questions Activity: Lollipop production
Read case study answer questions. How could you do this with your students?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.