Download presentation
Presentation is loading. Please wait.
1
UBAHAN HIDROTERMAL
2
Hydrothermal circulation in a continental setting –
Minerals form in hydrothermal veins, disseminated deposits and grade into pegmatites.
3
Hydrothermal circulation on the ocean floor.
Seawater circulates through the ridge basalt. Most minerals form when the hot water exits into the cold deep ocean water. Sulfide minerals form “black smokers”, sulfates form “white smokers”. Minerals are typically volcanogenic massive sulfides.
5
Origin of Hydrothermal Fluids
The hydrothermal solutions could be derived from several sources including: Juvenile water Connate water Meteric water Water released during progressive metamorphism
6
Juvenile Water Juvenile means waters released by melting which have never been at the surface before Often from granitic intrusions
7
Connate Water Connate water is water trapped in the interstices of sediments at the time of deposition, and which has been out of contact with the surface for a substantial time, often a large part of a geologic period or longer
8
Economic Minerals from Hydrothermal Alteration
Rocks formed in this manner are hosts for gold, copper, and copper-zinc In sheared or metamorphosed mafic rocks, nickel-copper and asbestos deposits are found Lead-zinc-silver veins are found in slates, quartzites, and phyllites, and sometimes as replacement minerals in limestones
9
The silicates in igneous rocks (feldspar, hornblende and micas) are altered by reaction with hydrothermal solutions to form characteristic alteration minerals: Propylite (chlorite and epidote form) Argillite (clay minerals form) Sericite (mica forms from clays)
13
ALTERASI TIPE 1
32
Indonesia Geothermal Reserve No Location Resources Reserves Total
Speculative Hypothetic Probable Possible Proven 1 Sumatera 4,975 2,121 5,845 15 380 13,336 2 Jawa 1,960 1,771 3,265 885 1,815 9,696 3 Bali-Nusa Tenggara 410 359 973 - 1,757 4 Sulawesi 1,000 92 982 150 78 2,302 5 Maluku 595 37 327 959 6 Kalimantan 45 7 Papua 75
33
Power Plant (MW) (PLTP=Geothermal Power Plant)
No Working Area Location Turbine Capacity Operator Total Cap. 1 PLTP Kamojang (Pertamina) West Java 1 x 30 MWe 2 x 55 MWe 1 x 60 MWe PLN PLN PLN 200 2 PLTP Lahendong (Pertamina) North Sulawesi 2 x 20 MWe 1 x 20 MWe PLN 60 3 PLTP Sibayak (Pertamina) North Sumatera 1 x12 MWe Pertamina 12 4 PLTP Salak (Chevron GSI) 3 x 60 MWe 3 x 65 MWe PLN CGS 375 5 PLTP Derajat (Chevron GSI) 1 x 55 MWe 255 1 x 90 MWe CGI 1 x 110 MWe 6 PLTP Wayang Windu SE 227 1 x 117 MWe 7 PLTP Dieng (Geo Dipa Energi) Central Java 1 x 60 MWe GDE Total 1,189
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.