Download presentation
Presentation is loading. Please wait.
Published byRachel Montgomery Modified over 6 years ago
1
Institute of Meteorology and Water Management,
HYDROCARE Institute of Meteorology and Water Management, Wroclaw Branch - PP 10 Bratislava,
2
Person responsible for each particular action
Tamara Tokarczyk Dr eng.; Agnieszka Kolanek Dr eng.;
3
4. Water resources management
4.2 - Assessments of the hydrological characteristics of the Polish territory during different climatic conditions. Estimation of water resources in flood, drought and average conditions. Assignment of the amount of minimal discharge.
4
Expenses I-VI.2006 - app. 4500 euro
TIMETABLE Expenses I-VI app euro
5
Location of chosen catchments in Poland territory
Pisa catchment: lacustrine catchment 4061 km2 area Prosna catchment: agricultural catchment 4712 km2 area Kłodnica catchment: urbanized catchment 1055 km2 area Nysa Kłodzka catchment reservoirs catchment 4712 km2 area Dunajec catchment: natural catchment 4341 km2 area
6
DATA BASE NNNNN RRRR MM DD
FIELD FIELD DESCRIPTION LENGHT ADDITIONAL INFORMATION NNNNN Hydrological code of gauge Code from CBDH RRRR Hydrological year MM Number of month in hydrological year XI - 01, XII - 02, I - 03, ….. X – 10 DD Days QQQQQQQQQ Discharge [m3/s ] discharge *1000, QQQQQQ - integer QQQ fraction The example file: Kłodzko.txt
7
PHYSIO-GEOGRAPHIC CHARACTERISTICS OF BASIN
Spatial location Geometry of basin Morphometry and surface features Hydrological network Land cover and land use Hydrological structure LAND COVER *Corine Land Cover 2000 – grid 250 m
8
4. Water resources management
4.4 - Creation of homogeneous water quantity and quality database for about 100 selected monitoring points localised along the main Polish rivers. The assessments of surface water quality will take into account different climatic conditions, as in the periods of swelling, flood, drought and also in average conditions.
9
Expenses I-VI.2006 - app. 9000 euro
TIMETABLE No Particular actions in 4.4 Time of the end 1 Analysis of preliminarily selected monitoring stations according to data availability in the last 10 years III. 2006 2 Characterisation of monitoring network according to surface water quantity and quality data IV.2006 3 Interim Report VI.2006 Expenses I-VI app euro
10
Location of preliminary chosen investigation surface water quality monitoring stations in Poland
11
DATA BASE
12
Location of investigation surface water quality and quantity monitoring stations in Poland
13
Metodology of calculation the loads of contaminations
14
Metodology of calculation the loads of contaminations
Metodologia!
15
e-mail: Agnieszka.Kolanek@imgw.wroc.pl
HYDROCARE Technical co-ordinator of HYDROCARE Project - PP 10 and contact person: Dr Agnieszka Kolanek tel
16
Thank you for your attention
HYDROCARE Thank you for your attention
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.