Download presentation
Presentation is loading. Please wait.
Published byClara Wiggins Modified over 6 years ago
1
Aptar Graduate Program “Inspire Me” Manufacturing
2
Project under development
Hiring Manager: Mauro Petrilli Department: Manufacturing Plant: Chieti Name of the Project: PRODUCTION LOGISTIC AND FLOWS OPTIMIZATION IN THE SHOP FLOOR The Project in detail: The project’s main goal is to optimize the shop floor internal logistic in order to reduce the time spent for movimentation and minimize the wip value. Candidate Profile: Mechanical engineer, mechatronic engineer, industrial engineer Planned Activities: Field investigation, data analysis, computer simulation, computer optimization Company Tutor: Mauro Petrilli
3
Project under development
Hiring Manager: Mauro Petrilli Department: Manufacturing Plant: Chieti Name of the Project: ZERO NON CONFORMITIES IN MANUFACTURING The Project in detail: The project’s main goal is to reduce the non conformities generated in the assembly process. The candidte will provide a detailed analysis and categorization of every RNC (Non Conformities Report), will investigate and find the root cause of each RNC and will support the internal team for the develop of technical/management solutions for root causes’ elimination. Candidate Profile: Mechanical engineer, mechatronic engineer, material engineer. Planned Activities: Field investigation, data analysis, problem solving, analyze technical drawings, process design, CAD design. Company Tutor: Valerio Magliaro
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.