1 Field Testing ASHRAE Guideline 26-2012
Guideline for Field Testing of General Ventilation Filtration Devices and Systems for Removal Efficiency In-Situ by Particle Size and Resistance to Airflow Blue Heaven Technologies, Inc. Louisville, KY

2 Who Can Do it ?

3

4 Issues with In-Situ Testing?
Why do In-Situ Testing? Compare Different Products Tests equipment under “Real World” Conditions It’s better than just standing around To Frustrate Others Issues with In-Situ Testing? Hard to Duplicate Test Conditions from test to test Easy to Manipulate Test Conditions Who Pays for it?

5 Basic Sampling System

6 You Must Sample Isokineticly or You Will FAIL!

7 ISOKINETIC SAMPLING Sampling in which the flow in the sampler inlet is moving in the same direction and at the same velocity as the flow being sampled.

8 Sample Nozzle

9 Flow to Particle Counter
ISOAXIAL SAMPLING Allows for Isokinetic Sampling by adjusting flow at the sample nozzle instead of changing the nozzle size Flow to Particle Counter Sample Flow Adjust Flow in this “Outer Tube” by varying the vacuum pump flow rate so the counter maintains ISOKINETIC SAMPLING. Pump Flow

10 Iso-Axial Sample Probe

11 Upstream Sample Locations

12 Downstream Sampling Location

13 Really, This Worked at the Office?!?!?!

14 Particle Counter

15 Example Test Data – Filter 1
Size Range (µm) D1 U1 D2 U2 D3 U3 D4 U/S Avg D/S Avg 5634 2449 562.5 448.5 133 118.5 131.5 29 30 29.125 115.5 21 15.5 17.625 4 >5.0 8.5 5.5 0.25 Efficiency Calculations Average Standard 95% Upper 95% Lower (%) Efficiency Deviation Conf. Coeff. CV Eff 1 Eff 2 Eff 3 66.43 60.08 59.27 61.93 3.920 71.67 52.19 6.33 76.79 72.50 70.89 73.39 3.046 80.96 65.83 4.15 84.16 78.87 78.01 80.35 3.330 88.62 72.07 4.14 89.21 86.51 86.22 87.31 1.650 91.41 83.21 1.89 96.44 96.92 96.66 96.67 0.243 97.28 96.07 96.71 99.02 98.48 98.07 1.209 101.07 95.07 1.23

16 In-Situ Filter Comparison

17 Air Entry to Building

18 Entry House Access

19 Pre-filter Bank Upstream

20 Downstream of Pre-Filters

21 Velocity Traverse Ports

22


Download ppt "Field Testing ASHRAE Guideline"

Similar presentations


Ads by Google