Download presentation
Presentation is loading. Please wait.
Published byMariah Perkins Modified over 6 years ago
1
A Sample of Seldom Used Tools and other Power Flow Trivia
Tracy Rolstad Avista System Planning WECC PWSUG, 14 March 2012
2
GE Appears to Model One Shunt, but Displays Two
3
Carry Over from Case Read
4
Unique Levels of Aggregation
Injection Groups Power plants, conforming load, etc Substations Collection of buses, loads, generators, etc Auto extractable with Lat/Long Interfaces Path Rating catalog Can contain numerous object elements
5
Use of Aggregation Provides Enhanced Capability
Substation Auto-extract Quasi-GIS capability Extract into ID, OR, WA borders Or just ask Zach for his work! Bubble Diagram Uses interfaces and areas to emulate GE diagram Super Area used in this… Will post needed *.aux files and *.pwd files Custom Case Information Fills need for standard reporting
10
Ranking Importance of Buses or Substations
All lines in service Flow based: MW, MVAr, Net Injections Equipment Count Contingency Based Violation Count RANK Aggregate Overload % or MVA Gen or Load Islands
15
N-1-1 Contingencies How do you know what to simulate?
The numbers can be overwhelming Or perhaps not? Use the Advanced LODF Tool We will look at Puget’s sensitivities to ALL WECC 500 kV ctgs Auto insert WECC 500 kV ctgs Create PSE Limit Monitoring Group Run Advanced LODF Examine Results
23
LODF Tool Prediction Is?
Flow = MW "COVINGT4-RAVER“ And MONITORED BRANCH ! FLOW = MW LODF = "MAPLE V3-TALBOT N" So…. (-0.123) * ( MW) MW = MW should show up on the MapleV3—Talbot N line. Ugh, signs…
24
YAY!
25
Well? PSE folks, will these outages load up the PSE system?
26
Setting Path Flows and Line Flows to Targets
Tools Used Injection Group(s) For this example it is an uber-group that is all WECC generation regardless of type, size, etc. Interfaces Line Loading Replicator
27
Creating All WECC Gen Group
28
Line Loading Replicator on Northern Intertie
29
Set Northern Intertie to Zero in 15 seconds
30
Results: Note Use of AGCable Flag
31
Going the other way by 2300 MW
32
Results from this: ~4600 MW Shift
33
Check Overloads and Generation Movement
The line loading replicator is NOT an OPF…no constraints 15 overloads in base case (max =211%) 80 overloads in adjusted case (max=216%, same line as above)
34
Questions
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.