A Sample of Seldom Used Tools and other Power Flow Trivia

Similar presentations


Presentation on theme: "A Sample of Seldom Used Tools and other Power Flow Trivia"— Presentation transcript:

1 A Sample of Seldom Used Tools and other Power Flow Trivia
Tracy Rolstad Avista System Planning WECC PWSUG, 14 March 2012

2 GE Appears to Model One Shunt, but Displays Two

3 Carry Over from Case Read

4 Unique Levels of Aggregation
Injection Groups Power plants, conforming load, etc Substations Collection of buses, loads, generators, etc Auto extractable with Lat/Long Interfaces Path Rating catalog Can contain numerous object elements

5 Use of Aggregation Provides Enhanced Capability
Substation Auto-extract Quasi-GIS capability Extract into ID, OR, WA borders Or just ask Zach for his work! Bubble Diagram Uses interfaces and areas to emulate GE diagram Super Area used in this… Will post needed *.aux files and *.pwd files Custom Case Information Fills need for standard reporting

6

7

8

9

10 Ranking Importance of Buses or Substations
All lines in service Flow based: MW, MVAr, Net Injections Equipment Count Contingency Based Violation Count RANK Aggregate Overload % or MVA Gen or Load Islands

11

12

13

14

15 N-1-1 Contingencies How do you know what to simulate?
The numbers can be overwhelming Or perhaps not? Use the Advanced LODF Tool We will look at Puget’s sensitivities to ALL WECC 500 kV ctgs Auto insert WECC 500 kV ctgs Create PSE Limit Monitoring Group Run Advanced LODF Examine Results

16

17

18

19

20

21

22

23 LODF Tool Prediction Is?
Flow = MW "COVINGT4-RAVER“ And MONITORED BRANCH ! FLOW = MW LODF = "MAPLE V3-TALBOT N" So…. (-0.123) * ( MW) MW = MW should show up on the MapleV3—Talbot N line. Ugh, signs… 

24 YAY!

25 Well? PSE folks, will these outages load up the PSE system?

26 Setting Path Flows and Line Flows to Targets
Tools Used Injection Group(s) For this example it is an uber-group that is all WECC generation regardless of type, size, etc. Interfaces Line Loading Replicator

27 Creating All WECC Gen Group

28 Line Loading Replicator on Northern Intertie

29 Set Northern Intertie to Zero in 15 seconds

30 Results: Note Use of AGCable Flag

31 Going the other way by 2300 MW

32 Results from this: ~4600 MW Shift

33 Check Overloads and Generation Movement
The line loading replicator is NOT an OPF…no constraints 15 overloads in base case (max =211%) 80 overloads in adjusted case (max=216%, same line as above)

34 Questions

35


Download ppt "A Sample of Seldom Used Tools and other Power Flow Trivia"

Similar presentations


Ads by Google