1 KORRR INFORMAL STAKEHOLDER WORKSHOP
PG Data Exchange

2 SO GL aims  defined in Article 4(1)
determining common operational security requirements and principles; determining common interconnected system operational planning principles; determining common load-frequency control processes and control structures; ensuring the conditions for maintaining operational security throughout the Union; ensuring the conditions for maintaining a frequency quality level of all synchronous areas throughout the Union promoting the coordination of system operation and operational planning; ensuring and enhancing the transparency and reliability of information on transmission system operation; contributing to the efficient operation and development of the electricity transmission system and electricity sector in the Union. SO GL aims, struture, implementation

3 SO GL structure Part II Operational security
Title 1 Operational security requirements Title 2 Data exchange Title 3 Compliance Title 4 Training Part II Operational security Title 1 Data for operational security analysis in operational planning Title 2 Operational security analysis Title 3 Outage planning coordination Title 4 Adequacy Title 5 Ancillary services Title 6 Scheduling Title 7 ENTSO-E Operational planning data environment Part III Operational planning Title 1 Operational agreements Title 2 Frequency quality Title 3 Load frequency control structure Title 4 Operation of load frequency control Title 5 Frequency containment reserves Title 6 Frequency restoration reserves Title 7 Replacement reserves Title 8 Exchange and sharing of reserves Title 9 Time control process Title 10 Cooperation with DSOs Title 11 Transparency of information Part IV Load frequency control and reserves Part V Final provisions Part I General provisions SO GL aims, struture, implementation

4 SO GL implementation scope
SO GL aims, struture, implementation

5 SO GL aims, struture, implementation
SO GL implementation timeline incl. NRA approval (Anticipated EIF 07/2017) SO GL aims, struture, implementation

6 KORRR approach: Timeline

7 KORRR approach: Workshop Objectives
Early involvement of stakeholders Present the current approach of the proposal Know interpretations and opinions

8 KORRR approach: Workshop Organization

9 Art. 40(6) SO GL KORRR approach
By 6 months after entry into force of this Regulation, all TSOs shall jointly agree on key organisational requirements, roles and responsibilities in relation to data exchange. Those organizational requirements, roles and responsibilities shall take into account and complement where necessary the operational conditions of the generation and load data methodology developed in accordance with Article 16 of Regulation (EU) No 2015/1222

10 Who exchanges the information? How the information is exchanged?
KORRR approach General principles Who exchanges the information? How the information is exchanged? When is the information exchanged? How is the information stored?

11 KORRR approach: Main ideas
Information is required to perform security analysis: Structural+ Scheduled-> Before real time Structural+ Real Time-> Real time analysis Each party shall have the information required for operational security. Where needed: When TSOs receive the information, it shall be shared with DSOs. When DSOs receive the information, it shall be shared with TSOs

12 KORRR approach TSO TSO TSO Agreement among TSOs DSO B DSO A DSO B
Owner/ Aggregator TSO DSO B DSO A Owner/ Aggregator TSO DSO B DSO A Owner/ Aggregator National/TSO level

13 KORRR approach: Exchange of information

14 Coffee before the “Topics of interest” session
KORRR Coffee before the “Topics of interest” session

15 KORRR: Topics of interest
Issues or concerns with the present draft of the KORRR? KORRR Incorporating ‘Cascading’ & ‘Centralised’ approach Progressive or Conservative in approach? Are requirements clear enough and justified? ……? Sufficient flexibility for MS/Regional differences Appropriate level of detail

16 KORRR: Topics of interest
What is your general approach to the Data Exchange between TSOs-DSOs-SGUs?

17 KORRR: Topics of interest
What is your general opinion about the KORRR proposal? Content Structure Applicability

18 KORRR: Topics of interest
What would you delete from the current KORRR proposal?

19 KORRR: Topics of interest
What would you change from the current KORRR proposal?

20 KORRR: Topics of interest
What would you keep from the current KORRR proposal?

21 KORRR: Topics of interest
What would you add to the current KORRR proposal?

22 KORRR Time for lunch

23 Real time data exchange
Structural data Scheduled data Real time data Who has to exchange the information How the information shall be exchanged When does the information has to be exchanged What information has to be exchanged How the information shall be stored

24 Data exchange General content
Role Who What When How Storage TSO What is the general role of the TSO? What data shall the TSO obtain? What is the trigger event for receiving updated data? How and in which format should the TSO receive data? How should the data be stored by the TSOs? DSO What is the general role of the DSO? What data shall the DSO provide? What is the trigger event for providing updated data? SGU What is the general role of the SGU? What data should the SGU provide?

25 Real time data exchange General approach

26 Real time Data Exchange Discussion
Do the proposal fits with current practices at national level? Did you expected more level of detail in the proposal? Is it necessary to harmonize SGUs connected at Transmission and distribution level? How shall DSO-DSO data exchange be addressed?

27 KORRR 15 minutes break

28 Structural data exchange
Scheduled data Real time data Who has to exchange the information How the information shall be exchanged When does the information has to be exchanged What information has to be exchanged How the information shall be stored

29 Structural data exchange General content
Role Who What When How Storage TSO What is the general role of the TSO? What data shall the TSO obtain? What is the trigger event for receiving updated data? How and in which format should the TSO receive data? How should the data be stored by the TSOs? DSO What is the general role of the DSO? What data shall the DSO provide? What is the trigger event for providing updated data? SGU What is the general role of the SGU? What data should the SGU provide?

30 Structural data exchange General approach

31 Scheduled data exchange
Structural data Scheduled data Real time data Who has to exchange the information How the information shall be exchanged When does the information has to be exchanged What information has to be exchanged How the information shall be stored Page 31

32 Scheduled data exchange
General approach

33 Real time Data Exchange Discussion
Do the proposal fits with current practices at national level? Did you expected more level of detail in the proposal? Is it necessary to harmonize SGUs connected at Transmission and distribution level? How shall DSO-DSO data exchange be addressed?

34 KORRR Time to sum up

35 Flexibility: the less regulation the better Confidentiality
KORRR: general Clarity Flexibility: the less regulation the better Confidentiality

36 Harmonization of exchanges between different SGUs
KORRR: real time Harmonization of exchanges between different SGUs Level of detail: frequency, redundancy, availability No duplication of data provision Responsibility of aggregator

37 KORRR: Structural and Scheduled
Harmonization of exchanges between TSOs and NEMOS No duplication of information Use of flexibility markets

38 KORRR Thank you