Presentation is loading. Please wait.

Presentation is loading. Please wait.

API SC 10 Task Group on Stage Cementing Collars TG Charge Proposal

Similar presentations


Presentation on theme: "API SC 10 Task Group on Stage Cementing Collars TG Charge Proposal"— Presentation transcript:

1 API SC 10 Task Group on Stage Cementing Collars TG Charge Proposal
Alfredo Sanchez, P.E., Rubicon Oilfield International 2017 Exploration and Production Winter Standards Meeting Austin, January, 2017

2 Content TG Volunteers Summary of first meeting Charge proposal
TG Members

3 Current Volunteers Alfredo Sanchez
Rubicon Oilfield International Austin Freeman BP Brandon Bourg Weatherford Brent Lirette Antelope Oil Tools Dale Doherty ConocoPhillips David Laurel Baker Hughes David Stiles ExxonMobil Dennis Jiral Glen Benge Benge Consulting Gunnar DeBruijn Schlumberger Hank Rogers Citadel Casing Solutions Jamie Reid OXY John Hebert Blackhawk K.K. LaFleur LaFleur Properties Keith Harless Gryphon Oilfield Solutions Lonnie Helms Halliburton Luis Padilla Chevron Max Rodrigue Scottie Scott Wesley Johnson Downhole Products

4 First Meeting - Participants

5 First Meeting - Content
Safety moment Introductions Review original project proposal Discussion on document types Potential content Additional participants Timeline Define charge

6 RP vs TR Discussion 10TR6 10TR4 10TR5 RP 10F
19AC – completions accessories (iso 14998) Other

7 Potential Content Applications Types Testing procedures
Performance reporting considerations Factors that affect life span Design and manufacturing considerations

8 Additional Participants
Port collar manufacturers Other

9 Charge Proposal Develop an API document for stage cementing collars to include at minimum the following content: Applications Types Testing procedures Performance reporting considerations Factors that affect life span Design and manufacturing considerations The final content and document type to be defined based on the consensus of the task group and balloted to SC-10


Download ppt "API SC 10 Task Group on Stage Cementing Collars TG Charge Proposal"

Similar presentations


Ads by Google