Download presentation
Presentation is loading. Please wait.
Published byJuniper Warner Modified over 6 years ago
1
performance requirements technical specifications
CTA requirements From performance requirements to technical specifications German Hermann, Towards CTA specs Project Committee,
2
Towards “the optimal solution”
Science Goals Cost Estimate Require- ments System Architecture German Hermann, Towards CTA specs Project Committee,
3
Requirements and technical specifications
We (CTA) define our specifications by ourselves customer = contractor we better understand what we really need, and why … German Hermann, Towards CTA specs Project Committee,
4
Towards “the optimal solution”
“Optimal solution” vs. development on finite time scale: Let’s be pragmatic Goal: enable prototyping of assemblies and sub- systems asap ! Parameters of prototypes as close a possible to final solution ! We need to create a consistent picture, fix requirements, narrow down parameter space and derive high level technical specifications German Hermann, Towards CTA specs Project Committee,
5
Systems level definition
Proposal: System : The CTA observatory Sub-systems: Telescopes, array trigger, central DAQ-system, atmo-monitoring, … Assemblies: Cameras, telescope structures, reflectors, drive systems …. Components: PMTs, HV, Mirrors, calibration devices, actuators, motors …. German Hermann, Towards CTA specs Project Committee,
6
Requirements levels Level 1: fundamental science requirements
Scientific mission Duration, timeline Cost Schedule Level 2 (A): observatory system requirements Level 3 (B): Sub-system requirements Level 4 (C): requirements on assemblies (structures, cameras, …) Level (D): requirements on components German Hermann, Towards CTA specs Project Committee,
7
Requirements: level 1 Level 1
Fundamental requirements of the observatory (as defined in 2005 LOI to ESFRI): x 10 sensitivity in core energy regime (1-10 TeV) ~ x 1000 dynamic range in energy (some 10 GeV to 100s of TeV) improved angular resolution (x 5) Energy resolution Large(r) gamma-ray field of view , full sky coverage: south: full energy coverage; north: emphasize on low energies Cost envelope: 150 MEuro construction cost (as of 2005) Schedule: Operation cost: < 10 % per year (< ~ 5 %) German Hermann, Towards CTA specs Project Committee,
8
First Draft Documents German Hermann, Towards CTA specs Project Committee,
9
Draft/work material on Wiki
German Hermann, Towards CTA specs Project Committee,
10
Current “editing team”
SST: R. Canestrari, R. White MST: B. Khelifi LST: O. Blanch Bigas, Th. Schweizer MC: J. Hinton, K. Bernloehr R.Mirzoyan, P.Vincent, M. Panter, A. Foerster, M.Doro, C.Delgado All of them can only spend a (very) small fraction of their time on that work Still hell of a lot to be done Team is clearly manpower (time) limited – need ~2-3 persons working ~full-time, supported by WP coords German Hermann, Towards CTA specs Project Committee,
11
Requirements vs techn. specs ?!
German Hermann, Towards CTA specs Project Committee,
12
Requirements vs techn. specs ?!
feasible ?! Cost ?! “Physicists” “Engineers” Requirement Technical Specifications (implementation dependent) German Hermann, Towards CTA specs Project Committee,
13
Towards “the optimal solution”
Science Goals Cost Estimate Require- ments System Architecture German Hermann, Towards CTA specs Project Committee,
14
Towards “the optimal solution”
What are the science wishes ??? When can we expect feedback from prototyping projects ? What is technically feasible ??? What is affordable ??? German Hermann, Towards CTA specs Project Committee,
15
German Hermann, Towards CTA specs Project Committee, 2011-02-01
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.