Download presentation
Presentation is loading. Please wait.
1
2nd IRG Meeting 30 November 2009
Progress Report 2nd IRG Meeting 30 November 2009
2
Events 2009 2009 Status February 11-13
1st Meeting of the International Reference Group (Auckland Workshop) March Auckland Workshop report to MG and IRG 2nd draft Approach Paper to IRG April 3rd draft Approach Paper to MG → IRG_ Prepare draft TOR for core team to MG → IRG Mid-May IRG Approval of AP and TOR by written procedure May – August Tendering and contracting of the Core Team End-September Core Team in place and operational Forming of national reference groups partial October Draft generic TOR for country level evaluations October – November Four Regional workshops to discuss generic TOR and initiate development of country-specific TOR. Early-December 2nd IRG meeting to discuss evaluation progress, to validate Evaluation Framework and Generic Country Evaluation TOR
3
Country Evaluations Afghanistan Bangladesh Benin Bolivia ? Cambodia
Cameroun ? Colombia Cook Islands Ecuador (?) Ghana Indonesia Kyrgyz Republic ? Malawi Mali Mozambique Nepal Philippines Samoa Senegal South Africa Sri Lanka Uganda Vietnam (?) Zambia
4
Donor/Agency HQ Evaluations
African Development Bank Austria Japan Ireland Spain Sweden USA
5
Budget PDE Phase 2 Budget Euro US $ @ € 1,50
Euro US $ @ € 1,50 Country Level Studies (23) Donor/agency HQ Studies (7) Reference Group meetings (4) Management Group Meetings (8) 25.000 37.500 Regional workshops (8) Core team Special Studies Dissemination Secretariat DIIS Contingencies Total Estimated Cost
6
Contributions Austria 80.000 Australia 100.000 Belgium 70.000
Cambodia Canada Denmark Finland France Germany Ireland Japan Luxemburg 0 Netherlands New Zealand Norway Philippines Samoa South Africa Spain Sri Lanka Sweden Switzerland UK US AfDB AsDB EC IDB UNDP 0 World Bank 0 TOTAL Budget Shortfall
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.