Overview Of Blast Furnace Process BHEL ISG,Bangalore Date : 15th july, 2014 PRESENTATION BY PREM PRAKASH ENGINEER, BG IIA
2
PRESENTATION BY PREM PRAKASH
3
PRESENTATION BY PREM PRAKASH
Blast Furnace Process PRESENTATION BY PREM PRAKASH
4
PRESENTATION BY PREM PRAKASH
5
PRESENTATION BY PREM PRAKASH
6
PRESENTATION BY PREM PRAKASH
7
PRESENTATION BY PREM PRAKASH
8
PRESENTATION BY PREM PRAKASH
9
PRESENTATION BY PREM PRAKASH
10
PRESENTATION BY PREM PRAKASH
11
PRESENTATION BY PREM PRAKASH
12
PRESENTATION BY PREM PRAKASH
13
PRESENTATION BY PREM PRAKASH
14
PRESENTATION BY PREM PRAKASH
15
PRESENTATION BY PREM PRAKASH
16
PRESENTATION BY PREM PRAKASH
17
BLAST FURNACES at Tata Steel
PRESENTATION BY PREM PRAKASH
18
PRESENTATION BY PREM PRAKASH
A-G Blast Furnaces Furnaces Working Volume (m3) Inner Volume(m3) A 956 1066 B 674 742 E 595 650 C 646 719 D 1012 1133 F 1585 1816 G 2306 2646 PRESENTATION BY PREM PRAKASH
19
Hot Metal Production Furnaces Inner Volume (m3) TPD
Productivity (t/m3/day) FY’07 (t) A 1066 1500 1.41 518,970 B 742 1100 1.48 396,500 E 650 2.30 266,430 C 719 1.53 397,350 D 1133 1900 1.68 630,800 F 1816 4000 2.20 1,332,500 G 2646 6000 2.27 2,004,850 TOTAL 8772 17100 1.95 5,547,400 PRESENTATION BY PREM PRAKASH
20
Facilities at Blast Furnaces
Top Charging Stock House High Top pressure Screening Cast House A Double bell Larry car No Coke ND & D trough B Drainable E Bell less top 0.5 bar C D ND & D trough+ SG F Conveyor 0.83 bar Coke, Ore & Sinter Drainable+ SG G 1.5 bar Coke ,Ore & Sinter PRESENTATION BY PREM PRAKASH
21
Blowing parameters at Blast Furnaces
Fces. Wind Vol (Nm3/hr) Oxygen enrichment (%) Hot Blast Temp. (oC) Coke rate (Kg/thm) Coal/Tar rate (Kg/thm) Charge A 67000 3.5 1050 535 45 Sinter 65% B 55000 1000 E 60000 5.7 1100 485 50 C 1070 570 Sinter % D 70000 6.0 1040 470 95 Sinter 70% F 152000 6.7 1020 434 112 G 240000 1150 430 140 PRESENTATION BY PREM PRAKASH
22
PRESENTATION BY PREM PRAKASH
The Up gradation at A-F Blast Furnaces Furnace Working Volume (Existing) Inner Volume (existing) Working Volume (New) Inner Volume ( New) A 956 1066 1350 1553 B 674 742 700 805 E 595 650 684 C 646 719 929 1061 D 1012 1133 F 1585 1816 1823 5468 6126 6092 6975 PRESENTATION BY PREM PRAKASH
23
Pressure at blast furnace end ( bar g)
Up graded Blowing Parameters FCE. Tgp ( bar g) Diff pressure hot blast press ( bar g) Press. Drop in stoves Pressure at blast furnace end ( bar g) A 0.5 1.7 2.2 0.2 2.4 B E C D F 1 2.7 2.9 PRESENTATION BY PREM PRAKASH
24
PRESENTATION BY PREM PRAKASH
Planned Production Rate Planned Existing Furnace Prodn MTPA A 1500 0.548 B 1100 0.402 E C D 1900 0.694 F 4000 1.460 11100 4.052 Furnace TPD MTPA A 3100 1.095 B 1500 0.54 E C 2000 0.72 D 2100 0.84 F 4100 1.56 TOTAL 14100 5.15 PRESENTATION BY PREM PRAKASH
25
F, G & H Blast Furnace Changes F BF G BF H BF Inner Volume( m3) 1816
2646 3814 Designed Production (MTPA) 1.0 1.8 2.5 Expected Production (MTPA) 1.4 2.2 3.0 No of tap holes & Tuyeres 2 / 24 2 / 30 4 / 34 High Top Pressure (bar) 0.83 1.50 2.50 Slag Granulation system Natural filter Bottom Filter INBA Stoves Internal combustion External combustion Stock house Conveyor & Skip All conveyor Cooling elements Cooling plates and hearth spray Copper and cast iron staves Copper and Cast iron staves PRESENTATION BY PREM PRAKASH