Download presentation
Presentation is loading. Please wait.
Published byHenry Spencer Modified over 6 years ago
1
Highways & Infrastructure Best Value Construction Procurement Presentation
November, 2017
2
Presentation Objectives
What is Best Value procurement Reasons why bids are not successful Tips on how to better respond to MHI tenders The Debrief process Question and Answer time
3
Why Best Value?
4
What is Best Value? What is Best Value?
Priority Saskatchewan definition: “best value” means structuring the specific procurement opportunity, as determined by the public entity, so that the evaluation and award to a successful vendor results in the greatest overall benefit to the public entity.
5
Why Pursue Best Value? Lowest bid price isn’t always:
the greatest overall benefit the lowest life cycle cost Opportunity to impact project challenges Cabinet directive via Priority Saskatchewan Bill 188 gives MHI authority to seek Best Value
6
The Basics – Why bids are not successful
7
Top 10 Reasons bids are not successful #1
Late bids - date, time and location We do not accept late bids
8
Top 10 Reasons Continued - #2
Not addressing mandatory criteria This is a show stopper - mandatory means mandatory
9
Top 10 Reasons Continued - #3
Not addressing rated requirements May not be a show stopper but the quality of the response will determine your standing in the competition. The failure of a Bidder to completely fill out a template may result in that bid being disqualified.
10
Top 10 Reasons Continued - #4
Not following the requested format Bidding with a different format will make it more difficult for evaluators There is a risk the evaluator will not find pertinent information if it is not where they expect to find it .
11
Top 10 Reasons Continued - #5
Not accepting the stated terms and conditions Normally bidders must accept the terms and conditions detailed in the tender
12
Top 10 Reasons Continued - #6
Miscalculation of price Unit price prevails where there is an error
13
Top 10 Reasons Continued - #7
Wanting to change bid after closing Your bid is irrevocable once the competition closes
14
Top 10 Reasons Continued - #8
Making assumptions rather than asking a question The best advice is to make no assumptions If you have a question - ask it
15
Top 10 Reasons Continued - #9
Not providing detailed information We can only evaluate what has been submitted
16
Top 10 Reasons Continued - #10
Evaluation criteria and selection method Look to the solicitation document to determine how your bid will be evaluated
17
Current Process
18
Relevant Work Experience
If possible provide examples of past projects: That were of similar work type and had the same major bid items; Which you were the prime contractor; That were similar in size; and That were similar in complexity.
19
Local Knowledge Describe your familiarity working with ministry procedures and indicate how it was obtained. Describe your knowledge of specifications relevant to the project being tendered and indicate how it was obtained.
20
Local Knowledge Describe your experience with site conditions that are similar to the project being tendered. If you have worked in close proximity to this project, please indicate. If you have worked with similar conditions (traffic, pits, soil) please indicate. Describe what the project(s) was and how it was similar.
21
Local Knowledge Describe your experience with third parties that are relevant to the project being tendered. Make your answer specific to this project. Who will you need to deal with on this project and have you dealt with them in the past?
22
Project Plan Quality and detail of work plan.
Provide a schedule that includes key milestone dates, and production rates. The work plan should include enough detail to demonstrate a good understanding of the project and it’s key activities and should be proportionate to the project complexity. The onus is on you to demonstrate your plan is viable and you have the capability and capacity to perform the work.
23
Project Plan Risk identification and mitigation strategy.
Provide all risks associated with the project being tendered. Potential risks may include: Traffic (include project specific concerns) Safety Soil conditions Weather Steep slopes
24
Project Plan Demonstrated capacity
Identify the current schedule for all crews with their committed work and show the crew and schedule for this specific tender. List active projects and provide timelines for those projects. Indicate how this project would be coordinated with other active projects.
25
Project Plan Key personnel and their relevant experience
Personnel assigned to this project, their role, and their experience in this role. Provide relevant experience for subcontractors who are estimated to provide services over 20% of the total contract value.
26
IMPORTANT REMINDERS We can only assess what is in your bid even if it is known information Bid as though your submission will be reviewed by someone who has never heard of you Provide details of your experience – both company and personnel experience Include important milestones in your project plan
27
Debriefing Process The first step is to request a debrief
You will get feedback on the strengths and weakness of your bid This will help you on the next competition It is not a debate or a complaint process You only get feedback on your bid
28
Summary Read the document carefully Follow all instructions
If you have a question ask it Win or lose ask for a debrief
29
Questions I would be pleased to answer any questions you have
THANK YOU FOR YOUR INTEREST
30
Contractor Performance Evaluation
31
Contractor Performance Evaluation
Working on details regarding how to evaluate contractor performance 2017 contract award letters noted that project performance would be evaluated on: Schedule Quality Project Delivery Safety & environment
32
Contractor Performance Evaluation
Will be evaluating projects awarded in 2017 Slowly introducing that information as part of the contract award process
33
Thank You
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.