Presentation is loading. Please wait.

Presentation is loading. Please wait.

Maximo Upgrade Information Session

Similar presentations


Presentation on theme: "Maximo Upgrade Information Session"— Presentation transcript:

1 Maximo Upgrade Information Session
Over-whelming Benefits of Upgrading to 7

2 Upgrade to 7 - Benefits of 5 vs 4
Architecture Maximo 4 is Client/Server, limited growth or customization potential Maximo 5 is N-Tier, Java-based, multi-platform, open standards Implementation – Multi-site and Multi-language Multiple Sites can exist in a single database Centralized reporting contracts and purchasing Ability to move / share Assets, Inventory and Labor between Sites Ability to implement Maximo in many languages Supports global enterprises

3 Upgrade to 7 - Benefits of 6 vs 5
Architecture Users no longer required to be database users Screens changed from JSP to XML Eliminated client processing and client/server control center admin Implementation Multi-site enhanced support Data can be stored by System / Set / Org / Site User security permissions drive site access Graphical Workflow, enhanced security, ERP systems integration KPI Reporting Service Desk processing

4 Upgrade to 7 - Benefits of 7 vs 6
Architecture Eclipse Business Intelligence and Reporting Tool (BIRT) Reduces install complexity and platform dependencies Based on Java Increases growth and flexibility Implementation Base Platform for many products - MAM, TAMIT, CCMDB, TSRM, TPM, TSAM, Industry Solutions and add-ons, PMP's More to come Market-driven functionality, Linear Assets, Classifications, WO Migration Manager Conditional UI Base Platform for bolt-on products – MEO, Visual Scheduler, Archiving, Monitoring

5 Report Upgrade Updates
Maximo 5 and 6: Effective Third Quarter, 2010, IBM will no longer distribute Actuate Products. Current Maximo 6 customers can continue using Actuate reporting and can continue to use the product in existing Maximo 6 installations Additionally, clients could migrate to a different reporting tool thru an integration or Upgrade to Maximo 7 Maximo 7: Effective First Quarter, 2010, IBM will no longer distribute Actuate 9 Software for upgrading Maximo 7 Clients Multiple report options available to clients in Maximo 7 including Cognos Reporting, BIRT and other integrations Reference Maximo 7 Report Upgrade Planning Guide for more details on report options

6 Upgrade Assistance Tools
Consider Customizations, DB Changes, Data Volumes, Hardware, Bandwith, Training, Downtime Upgrade in Place, not traditional ETL Install Target Version Run Integrity Checker, Report and Repair Mode, Source Data Integrity Run Validation, Source vs Target Data Integrity Run Upgrade, Transform the Database Repeat

7 Upgrade Assistance Tools - Upgrade
Add new tables and columns, using Metadoc Process Callouts for tables, logically sequenced Delete obsolete tables and columns, using Metadoc Metadoc defines database differences Industry Solutions create Metadocs and Callouts Industry Solutions recognized by Maxvars

8 IBM GBS Real World Experience
Infrastructure / Configurations

9 IBM GBS Real World Experience
Data / Testing / Change Impact

10 Upgrade Resources Start Here – Maximo Upgrade Resources Page
01.ibm.com/support/docview.wss?rs=3214&uid=swg Contact Support Contact GBS Contact me - Send me any suggestions you have


Download ppt "Maximo Upgrade Information Session"

Similar presentations


Ads by Google