Presentation is loading. Please wait.

Presentation is loading. Please wait.

PS operational beams 15 September 2017

Similar presentations


Presentation on theme: "PS operational beams 15 September 2017"— Presentation transcript:

1 PS operational beams 15 September 2017
fixed target beams status comments EAST 1,2 OK in specs high intensity delivered for one user during 2 weeks Low intensity version set up and used by IRRAD MTE* up to 2100E10 ppp in the PS with correct emittances Higher in the PSB but emittances being worked on TOF ** AD suffered from prbs. With PFW power supply, now fixed *) new PU after DFA can measure single islands available **) On request from TOF the beam position in TT2 is logged in Timber and an application has been made available which compiles important information for TOF Screenshots have been taken by the OP crew during every shift Improved diagnostics in the FTN line is under discussion (OP, BI, STI) MSWG 15/09/2017 KH

2 PS operational beams 15 September 2017
LHC type beams status Comments LHC 25ns OK (LHC 50ns) used? LHCPROBE LHCINDIV suffered yesterday LHCINDIV_VDM BCMS 25ns LHC25ns8b4e 2 versions (nominal and hi) wealth of dedicated beams for LHC MD set up and delivered wire scanners get occasionally blocked MSWG 15/09/2017 KH


Download ppt "PS operational beams 15 September 2017"

Similar presentations


Ads by Google