Download presentation
Presentation is loading. Please wait.
1
Hammer Project Celcom CA SSO Project
Celcom LTE FDD CA project pC_CA_ERE_08 oss KPI Trending - Appendix © Ericsson AB 2016
2
Hammer Project Celcom CA SSO Project
3G OSS KPI Trending © Ericsson AB 2016
3
pC_CA_ERE_08 3G oss kpi justification
CA Project SSO pC_CA_ERE_08 3G oss kpi justification # Description Target Value Technology Baseline KPI Result PASS/FAIL comments 3G to to A Cell Availability Maintain/Improved 99.29 99.69 Pass A CSSR_AMR 99.57 99.82 A CSSR_PS 99.65 99.74 A AMR Call Drop Ratio 0.26 0.13 A PS Service Drop Ratio 0.48 0.42 A SHO Success Rate (AMR Service) 99.72 99.71 Fail Refer to OSS Justification A SHO Success Rate (PS Service) 99.88 99.93 A HS-DSCH Service Cell Change Success Rate 99.98 A HSDPA RAB Setup Success Rate 99.05 98.88 A HSUPA RAB Setup Success Rate 99.87 99.85 A HSDPA Retainability 0.50 0.37 A HSUPA Retainability 0.47 0.35 A CS Inter-RAT Handover Success Ratio 99.83 A CS Inter-Frequency HHO Success Rate 94.69 98.29 *Refer to OSS Justification A PS Inter-Frequency HHO Success Rate 83.69 96.64 A RTWP A PRACH propagation delay(KM) 0.62 0.61 A CS Traffic(Erl) A CS RAB attempt PS RAB attempt A PS traffic(MB) © Ericsson AB 2017
4
CA Project SSO CSSR Baseline Result © Ericsson AB 2017
5
CA Project SSO DCR Baseline Result © Ericsson AB 2017
6
CA Project SSO TRAFFIC Baseline Result © Ericsson AB 2017
7
Hammer Project Celcom CA SSO Project
4G OSS KPI Trending © Ericsson AB 2016
8
Celcom LTE CA Project_OSS
CSSR Trending © Ericsson AB 2016
9
Celcom LTE CA Project_OSS
Drop Call Rate Trending © Ericsson AB 2016
10
Celcom LTE CA Project_OSS
LTE Data Traffic Trending © Ericsson AB 2016
11
Hammer Project Celcom CA SSO Project
© Ericsson AB 2016
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.