1
Navarro SWCD #514 located in Corsicana
2
A Cooperative Effort to Repair Flood Damaged FP Sites
Bobby Wilson Navarro Co. SWCD #514
3
The Storm June 9, 2010 – Navarro Co. - A storm system stalled-out and dumped 15-18” of rain into the Richland Creek Watershed near the community of Dawson. Although the storm lasted 12 hours, most of the rain fell within the last 6 hours.
4
The Next Morning Navarro Co. Emergency Management personnel were aware of the flooding. TCEQ Dam Safety office was contacted.
5
Inspecting the Damage A DPS helicopter was sent for NRCS officials to inspect dams within the watershed. 13 of the districts FP dams had been overtopped by floodwaters. 3 FP dams had received major damage.
6
Richland Creek Site 107b
7
Richland Creek Site 107b
8
Richland Creek Site 107b This site was at the center of the rainfall activity. The top and backslope was severely damaged.
9
Richland Creek Site 107b Unique emergency spillway design.
10
Richland Creek Site 110
11
Richland Creek Site 110 Floodwaters over-topped dam and caused 3 large washouts on the backslope. Emergency spillway was left with heavy rilling.
12
Richland Creek Site 31
13
Richland Creek Site 31 Floodwaters over-topped dam but only damaged the emergency spillway. Damage was caused by cattle trailing in emergency spillway. Gully came within ft of the control section.