BIM & Supply Chain Integration Scott Bloss Copyright Scott Bloss, All rights reserved.
2
Copyright Scott Bloss, 2008. All rights reserved.
Presentation copyright Scott Bloss, 2008 All rights reserved. Copyright Scott Bloss, All rights reserved.
3
Copyright Scott Bloss, 2008. All rights reserved.
Topics Industry Challenges Integrated Project Objectives Intelligent Design Information BIM Extractable Information Copyright Scott Bloss, All rights reserved.
4
AECO Industry Challenges
A fractured industry: Separate work islands Incompatible information systems Redundant documentation Manual work flow Liability Boundaries Copyright Scott Bloss, All rights reserved.
5
Integrated Project Objectives
Define project scope, cost and schedule quickly Improved speed to project completion Improve project coordination Improve constructability and project quality Maintain focus on the entire project life cycle Maintain focus on client goals Copyright Scott Bloss, All rights reserved.
6
INTEGRATED DESIGN SPECIFICATIONS
BASIC SPECIFICATION GENERATION TOOL CUSTOMIZE & CREATE OFFICE MASTERS MANAGE SPECIFICATIONS BY CLIENT TYPE INTELLIGENT LINKING OF SPECIFICATIONS TO MODEL GEOMETRY AUTOMATED SPECIFICATION GENERATION BI-DIRECTIONAL LINKING TO BIM AUTHORING TOOLS Copyright Scott Bloss, All rights reserved.
7
Copyright Scott Bloss, 2008. All rights reserved.
LEVERAGING BIM DATA 4D TIME & SCHEDULING DATA 4D SCHEDULE & PROJECT VISUALIZATION 5D COST AND ESTIMATING DATA PRE-ASSEMBLY & FABRICATION FACILITIES MANAGEMENT Copyright Scott Bloss, All rights reserved.
8
Copyright Scott Bloss, 2008. All rights reserved.
Time and Cost: 4D & 5D LINKING BIM TO THE PROJECT SCHEDULE AND COST Time (4-D) Cost (5-D) Copyright Scott Bloss, All rights reserved.
9
Copyright Scott Bloss, 2008. All rights reserved.
4D-Project Schedule Schedule information can be linked from external PM tools Project tasks are linked to physical or logical location (phase, floor, area etc.) Building object schedules are compared and/or checked automatically against building schedule Copyright Scott Bloss, All rights reserved.
10
4D: Schedule / Project Visibility
“SEE THE SCHEDULE” User definable visualization schemes from the model Blue-completed, Green-live or in progress Red- prep for up coming day and Transparent- 2 weeks out Lifecycle mgmt. info: design/procure/build/deliver/install dates Copyright Scott Bloss, All rights reserved.
11
Copyright Scott Bloss, 2008. All rights reserved.
5D-Cost The ability to tag each object with its components as well as related materials, consumables, labor, insurance, geographic cost indexes, etc. Lives state budget updates through design build (budget, estimate, bid, actual) Value engineering “what if scenarios” Copyright Scott Bloss, All rights reserved.
12
Pre-Assembly and Fabrication
Bi-directional data transfer from model to automated fabrication equipment Staged fabrication based on just-in-time design, delivery and installation. Construction Documents illustrate design intent only. Copyright Scott Bloss, All rights reserved.
13
Copyright Scott Bloss, 2008. All rights reserved.