Major opverhaul of rotary machines
Content Major opverhaul of rotary machines Screw compressor Oil pumps Maintenance plan (PM) SercAl mechanics and SercAl vacuum sections Consolidations & WOs LHC LHC Detectors Non LHC (Compass & HIE-Isolde) CRG-ME OMP 09-Oct. 2017
4
Screw Compressor Four He Screw Compressor for major overhaul
DO-30998/TE/CRG for 3 Stal compressors S75 compressors to be dismounted and remounted at QSC1H-A-CP3 & 4 S93 spare part compressor to be installed at QSCA-2-CP8 Aerzen VMY536-aH gré a gré with Aerzen Schweiz To be back as spare compressor latest on the 02nd of March Batch Delivery by CERN of compressors at contractor’s premises Ready at contractor’s premises for delivery to CERN Total revision period at contractor’s premises [working days] Type Nb of comp. Earliest date Latest and mandatory date No later than S75 2 22-Dec 2017 05-Jan 2018 22-JAN-2018 10 S93 1 31-Jan 2018 26-Feb-2018 20 CRG-ME OMP 09-Oct. 2017
5
Oil Pumps Major Overhaul
Replacement of two Kral oil pumps by new ones with magnetic coupling Replacement by spare pump (insert); Inspection of replaced oil pumps to confirm our PM strategy; Stal (LHC/ATLAS): yearly standard overhaul of (insert) oil pumps; IMO (LHC): No oil pump for overhaul; Mycom (LHCC) : No oil pump for overhaul; Allweiler (ATLAS-SR): No oil pump for overhaul; Note : OP has confirmed proto is OK and has requested to install a second oil pump with magnetic coupling -> Order send to Schubag AG Desmi (LHC): 3 x oil pumps -> Exchange of roller bearings + visual inspection Position Last 12 months Yets 2017 QSCB-4-8P670 7658 56872 QSCB-6-7P670 6576 60734 Installation of variable frequency drivers (VFD) required Position Last 12 months Yets 2017 QSCB-18-2P640 5587 57292 CRG-ME OMP 09-Oct. 2017
6
PM – Maintenance Plan (QSSM & QSSV)
Based on SercAl work package review request QSSM 24 x Oil analysis (yearly basis) Already launched 38 x Tooth coupling inspection with re-greasing (yearly basis) QSSV PM schedules to be reviewed Filters replacement of the coalescer cartridges (32’000 h basis) is postponed to LS2 44 x Primary pumps : postponed to LS2 25 x Oil diffusion pumps inspection 22 x Oil diffusion pumps to be inspected. All overhauls are postponed to LS2 where a resynchronization will be studied 8 x blowers inspection(regeneration of adsorbers) -> Task list for Kaeser blower to be created CRG-ME OMP 09-Oct. 2017
7
LHC WOs/Consolidations (1)
LHC-P18 QSCCB-18 - Cleaning of CP piping (between coalescer 1 and compressor suction) LHC-P2 QSCA-2 - Piping consolidation to reduce vibration values. (List of consolidation points will be provided by OP) QSCCA-2-CP2 Missing dampers to be installed Active cleaning or oil change to be performed LHC-4 QSCA-4-7CV567 - Consolidation of control valve QSCA-4-J009 - Replacement of the coupling by a well-balanced one QURA-4-T7 - Adaption flange to be installed (as done for QURA-6-T7) QSCB-4 - 1HV569 to be taken out. (control valve down stream) QSCB-4-8P670 - Installation proto type oil pump with magnetic coupling (see slide 5 - Oil pumps major overhauling) QSCB-4-3LSH666 - Piping to be changed CRG-ME OMP 09-Oct. 2017
8
LHC WOs/Consolidations (2)
QSCA-6-1P640 (Desmi) - Prototype oil pump to be installed) QSRB-6-F530 - Prototype water filter to be installed QSCB-6-7P670 - Installation proto type oil pump with magnetic coupling (see slide 5 - Oil pumps major overhauling) QSRB-6-T8 - Repair of water circuit thread LHC-8 QSCCB-8-1GT120 - Slide valve position transmitter to be replaced QSCA-8-5P621 (IMO) - Installation of a prototype skid for IMO oil pump. Tunnel Compressed air isolation valve to be added Compressed air leak Helium leak (warm piping) Helium leak (Flange) between PV931 and CV931 Pressure test S12 (TBC) CRG-ME OMP 09-Oct. 2017
9
LHC Detector- WOs/Consolidations
Atlas Installation of solenoid dewar platform QSC1H-A-J006 - Support to proto type coupling installation QSC2H-A-1CV Valve body to be replaced (bypass valve) QSC2H-A-2P Installation of oil pump with magnetic coupling Underground 2 x water tank heat exchanger to be replaced Add of 3-way valves + redundant safety vales (SV3272, SV3279) CMS QSC1H-C - Realization of 3 purge lines QSC1H-C-TT177 to be replaced in the GN2 regen mainstream QSC1H-C-A173 - Replacement of adsorber insulation CRG-ME OMP 09-Oct. 2017
10
Non LHC : WOs/Consolidations
HIE-Isolde (YETS : Jan – Feb 2018) Repair of TL by Criotec Installation and connection of CM4 (Mar 2018) QSC1H-HIE-P600 - unlink oil pump from motor-compressors skid QSC1H-198-P362 - System to allow maintenance (big oil diffusion pump) QSK1H-199-P362 - Système pour maintenance P362 QSK1H-199-PT364 - Upgrader PT364 en deux jauges QSC1H-198-NRV189 - Upgrade clapet (delta P trop grand) QSC1H-198-PV100 - Moteur simple effet PV100 QSC1H-198-EH411 - Ajout FS or FT pour regénération charbon QSC1H-198-FT530 – Install FT on outlet instead of inlet HIE-Isolde (Pre-YETS : 4-11 December 2017) Dewar test : QSK1H-199-LT730 to be enabled, calibration to be verified and issue with pressure oscillations Faulty TTs in cryomodules COMPASS (Pre-YETS : November 2017) Dismounting of LH2 system and target Re-installation of He distribution system including leak detection in CB CRG-ME OMP 09-Oct. 2017