Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGad Process Overview Date: Authors: January 2009

Similar presentations


Presentation on theme: "TGad Process Overview Date: Authors: January 2009"— Presentation transcript:

1 TGad Process Overview Date: 2009-01-19 Authors: January 2009
April 2007 doc.: IEEE /0570r0 January 2009 TGad Process Overview Date: Authors: Eldad Perahia, Intel Corporation Eldad Perahia, Intel Corporation

2 Task Group Steps Begin Task Group Create Selection Procedure
January 2009 Task Group Steps Begin Task Group Elect Officers Create Selection Procedure Develop TG documents Begin Selection Procedure Confirmation vote Initial Letter Ballot Comment Resolution Recirculation Ballot(s) Initial Sponsor Ballot Recirculation Sponsor Ballot(s) Eldad Perahia, Intel Corporation

3 TG documents January 2009 Functional Requirements
Similar to 11n document PAR Additional quantitative constraints Evaluation Methodology Combine best from both 11n’s usage model and comparison criteria documents 11n defined dozens of comparison criteria that were ignored 11n defined dozens of environments, use cases and applications, but in the end mainly focused on three simulation scenarios Discuss usage models and then define limited set simulation scenarios for MAC simulations Include point-to-point link test for functional requirements Define PHY simulations Physical layer impairments Define metrics Channel Models Impulse responses Path loss Antenna Define model per simulation scenario environment Eldad Perahia, Intel Corporation

4 Other considerations Coordination with TGac Coexistence Usage models
January 2009 Other considerations Coordination with TGac Usage models In 08/1395: MAC functions, for example “Session mgmt” (seamless fallback from VHT60 and/or VHTL6 to n to legacy) Aggregation to support larger data units Space-time channel management Coexistence Liaison with c Liaison with Eldad Perahia, Intel Corporation

5 Official Time Line for TGad
January 2009 Official Time Line for TGad : PAR approved : WG LB Initial : WG LB Recirculation : Form Sponsor Ballot Pool : MEC Done : SB Initial : SB Recirculation : Final WG approval : Final EC approval : RevCom & Standards Board approval Eldad Perahia, Intel Corporation


Download ppt "TGad Process Overview Date: Authors: January 2009"

Similar presentations


Ads by Google