1 Goldratt: Balance flow not capacity
Process Flow Analysis Goldratt: Balance flow not capacity 8/24/04 Paul A. Jensen Operations Research Models and Methods Copyright All rights reserved

2 Our Goal: For a single product
Given: the process design Given: operation time and scrap rates at each operation Given: product demand Find: The flow in each operation and the total time required for each operation

3 To construct a model you must know the process
The process is described by its operations

4 The process model admits greater detail

5 What happens to product flows at junctions?
Do they assemble? Do they combine? Do they mix? Do they disassemble? Do they separate? Do they split?

6 “And” nodes model flows that assemble
The flows are equal on all entering and leaving arcs

7 “Or” nodes model flows that combine
The total flow in equals the total flow out

8 “Proportionality” nodes model arbitrary combinations
Input and output proportions are given

9 All junction nodes must be specified in a process chart