Mathew Brett Transport for London BIM Manager.

Similar presentations


Presentation on theme: "Mathew Brett Transport for London BIM Manager."— Presentation transcript:

1 Mathew Brett Transport for London BIM Manager

2 How are TfL using BIM? What effect will this have on the supplier?
Place a picture here, which could represent what you’re talking about. How are TfL using BIM? What effect will this have on the supplier? Mathew Brett

3 About Transport for London

4 About the Underground LONDON UNDERGROUND “THE TUBE”
Tube network has been an integral part of London's history for years, with 270 stations across 11 lines Tube rail network infrastructure totals 402km in length with 45% of network in tunnels. Annual train km travelled: 84 million 1.3 billion passenger journeys were completed in 2016 London's population projected to grow from 8.7m to 10m by We are ultimately a Transportation Infrastructure Asset Management Company The London Underground “Tube" network is a vital arterial network for London

5 Approach – Build a good foundation

6 Approach – Provide the tools

7 Approach – Embed the capability
Short Term Establish Consistency and Capability Medium Term Information Driven Asset Management Long Term A Digitally Integrated and Driven Transport Service

8 2012 2013 2014 2016 2007 2011 Early Adopters Bank VSU
Bond St to Baker St 2012 2013 DLR 2014 2016 2007 2011

9 Ops and Maintenance Requirements & Capability
Future Projects SFA 2020 2025 CRL 2 Upgrades (16 projects) CRL 1 (Handover) CRL 2 (Hybrid Bill) 2030 2035 DTUP 2017 2018 Ops and Maintenance Requirements & Capability Digitally Integrated and Driven Transport Service

10 Multiple BIM Roles in TfL
OIR AIR EIR Internal / External Client Designer Internal Internal / External Operator Contractor Internal / Contract Internal / External Maintainer Supplier

11 Impact on our Suppliers
Requirements: PQQ ITT SMP EIR BEP MIDP Capability Quality Feedback PAS :2017 Health & Safety

12 Impact on our External suppliers
More planning and execution of information deliverables Focus on Buildability and Maintainability Assurance of coordinated and integrated design through collaboration with other suppliers Compliance with TfL CAD and Data standards Accurate and complete as-constructed information model for handover Progressive handover of Asset Information

13 Impact on our Internal Suppliers
Using exemplar projects to inform new ways of working Upskilling staff and project teams Internal use of the TfL BIM toolkit Upskilling Digital Engineering capability to work with our external supply chain more effectively.

14 Summary Applying BIM in a complex environment
Consistent approach aligned to industry best practice Whole lifecycle Information Management is a marathon and not a sprint Apply learning from the early adopters We want the same level of performance from our internal suppliers as we would expect from our external suppliers