Racks Coordination 09 September 2011 E. Negodin

Similar presentations


Presentation on theme: "Racks Coordination 09 September 2011 E. Negodin"— Presentation transcript:

1 Racks Coordination 09 September 2011 E. Negodin
How to edit the title slide Upper area: Title of your talk, max. 2 rows of the defined size (55 pt) Lower area (subtitle): Conference/meeting/workshop, location, date, your name and affiliation, max. 4 rows of the defined size (32 pt) Change the partner logos or add others in the last row.

2 L ▐ - A2- ▌ L2 █ ▌-A3 --- A4 --- A5- ▌ L3 █ ▌A6 --- A7 --- A8- ▌- A9 --- A A11- ▌- A ▌- A A A26- ▌ RF LLRF slave master CFB/ CTB Cryo PS Vac. 2/3 rack groups: are they needed? Alternative 3/3 cabinets. Is it possible? Pros and Contras Preferably 3-Rack unit rather than 2-rack unit because of the lower costs (pro rack!). Costs difference must be checked Preferable to locate the water distribution upstream of klystron. Is it possible? Preferable to locate the LLRF between 1&2 and 3&4 module to guaranty the same cables length Are there any power constrains: 700W connection power and 8kW maximum power dissipation There are still some doubts that all "motors" are considered or on the contrary twice included Can the stepper motor drivers been combined in one rack (which)? Cable routing of motor driver is unclear To be clarified if racks can be located near the Schiebemove Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View

3 Issue replace all double cabinets in LINAC region with triple cabinets CONTRA Additional costs Cabinets: 67 double racks  67 x 1000€ Shielding: in budget ~2100 € pro rack,  € Additional space in the tunnel ~40 m Floor slabs PRO Additional free space in the cabinets – may be necessary later (in some places there is no spare space (or very small) for future upgrade) All LLRF cabinets are the same (48 in L2 and L3 like 2 in L1) …?

4 Issue replace special 4-cabinets in LINAC region (9 cryo-cabinets) with standard one PRO Special cryo-shielding not needed All PS for correctors are always at the same position (within the TGA room) All ACC Control crates are always at the same position All MBUs are always at the same position (2 MBUs pro RF Station) CONTRA Additional costs 9 x 1000 € cabinets  ~ € 9 x ? 2100 € shielding

5 New Rack Inventory Version (V6)
Position of the cabinets in the tunnel is fixed to the start position of the ACC module group (see Basic Layout) as following: PS/Diagnostics + 3,636 LLRF I + 11,060 RF + 15,425 Water cooling unit + 18,237 LLRF II + 37,812 Vacuum + 44,688 here the initial position of the left outer wall of the shielding is given in meters along z axis in the tunnel LLRF cabinets: 1 set pro RF station consist of 2 cabinets mirrored with respect to the middle of the ACC Modules group (1-st is master, 2-nd is slave) 1 set of 3 racks containers for L1 24 sets of 2 racks containers for L2 and L3 New Rack Inventory Version (V6) Based on the TGA Rooms Layout (1 Room – 4 ACC Modules Group) New Cabinets Layout within the room More space for IT More space for ACC control Less space for Motor Drivers

6 Rack Inventory New Rack Inventory Version (V6)
Based on the TGA Rooms Layout (1 Room – 4 ACC Modules Group) New Cabinets Layout within the room More space for IT More space for ACC control Less space for Motor Drivers

7 Issues List Test Rack prototypes Not-Aus Concept Schedule …
Cooling capabilities (regulated dummy load (0.5-5 kW), temperature sensors in many places in the racks (~16), temperature stability, etc). Vibrations caused by fans and water flow. Air tightness EMI shielding (?) at 1.3 GHz Cabling tests (dummies) Not-Aus Concept Schedule

8 Issues List Naming Concept 1. General CC_BBBBBB_ FFF_RRR_NNa
Campus Building Floor Room Nr.Cab Rack CC_BBBBBB_ FFF_RRR_NNa Campus XTL/XTD Room z position Rack Examples: DE_XTL_E00_022_03a DE_XTL_E0_012_03a → XTL_012_0683a OB_XTD1_E00_009_03c OB_XTD1_E0_009_03c → XTD1_009_2515c 2. XTL Tunnel only Rack 3.2.A6.L3 Second rack in the 3-rd container (LLRF or RF) of the group belonging to A6 Mod.Group in L3 Rack 5.1.BC3 Fifth position in BC3, rack 1(left one) Documentation has to be done within the frame of section CDR