1
ALDOT Pavement Preservation Policy
Lance Taylor, P.E. Assistant Region Engineer, Pre-Construction East Central Region 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
2
What is Pavement Preservation?
2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
3
Why do we need a policy on pavement preservation?
2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
4
Because sometimes there are very different interpretations….
2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
5
To make sure we are all in agreement….
2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
6
Deciding Which Applies….
Project Scoping Team Review Determine depth of cracking Required overlay thickness Presence of significant rutting and/or cracking 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
7
Preventive Maintenance
2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
8
Preventive Maintenance
There must be sub-categories and they must be numbered……we’re engineers. 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
9
Preventive Maintenance 1
No Milling of Structural Layers Preventive Maintenance 2 Limited Milling of Structural Layers 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
10
Preventive Maintenance 1
Requirements - Milling 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
11
Preventive Maintenance 1
Requirements - Overlay 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
12
Preventive Maintenance 1
2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
13
Preventive Maintenance 1
2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
14
Preventive Maintenance 1
2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
15
Preventive Maintenance 2
Requirements - Milling 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
16
Preventive Maintenance 2
Requirements - Overlay 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
17
Preventive Maintenance 2
2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
18
Minor Rehabilitation 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
19
Requirements - Milling
Minor Rehabilitation Requirements - Milling 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
20
Requirements - Overlay
Minor Rehabilitation Requirements - Overlay 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
21
Minor Rehabilitation 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
22
Scope Considerations 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
23
Safety PM 1 PM 2 Minor Rehab
Frictional Characteristics of existing and proposed applications PM 2 PM 1 and less than 5% of total cost Minor Rehab PM 1 and less than 15% of total cost 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
24
Super/Cross Slope PM 1 PM 2 Minor Rehab Not a required consideration
Provide correction where warranted in accordance with GFO 5-26 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
25
ADA PM 1 PM 2 Minor Rehab Not a required consideration
Curb cuts and ramps Minor Rehab 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
26
Pavement Width PM 1 PM 2 Minor Rehab Not a required consideration
28’ roadway width Widening funded from alternative sources 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
27
Roadway Geometry PM 1 PM 2 Minor Rehab Not a required consideration
2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
28
Bridge Rail PM 1 PM 2 Minor Rehab Not a required consideration
Interstate routes only Minor Rehab Retrofit rails on NHS routes unless technically infeasible 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
29
Guardrail End Treatments
PM 1 Not a required consideration PM 2 and Minor Rehab Interstate routes not meeting NCHRP 350 NHS routes not meeting NCHRP 230 Non-NHS routes not meeting NCHRP 230 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
30
Guardrail General PM 1 PM 2 Minor Rehab Not a required consideration
Repair damaged guardrail Fix missing or unconnected bridge approach rails Adjust, raise, or reset guardrail that is too low 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
31
Clear Zone PM 1 PM 2 Minor Rehab Not a required consideration
2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015
32
Questions? 2015 Alabama Department of Transportation Pre-Construction Conference Montgomery, Alabama May 7,2015